关注
Lucio Enrico Zavanella
Lucio Enrico Zavanella
在 unibs.it 的电子邮件经过验证
标题
引用次数
引用次数
年份
The consignment stock of inventories: industrial case and performance analysis
G Valentini, L Zavanella
International journal of production economics 81, 215-224, 2003
2902003
A one-vendor multi-buyer integrated production-inventory model: The ‘Consignment Stock’case
L Zavanella, S Zanoni
International journal of production economics 118 (1), 225-232, 2009
2852009
Modelling an industrial strategy for inventory management in supply chains: The'Consignment Stock'case
M Braglia, L Zavanella
International Journal of Production Research 41 (16), 3793-3808, 2003
2422003
Chilled or frozen? Decision strategies for sustainable food supply chains
S Zanoni, L Zavanella
International Journal of Production Economics 140 (2), 731-736, 2012
2312012
Greening the aluminium supply chain
I Ferretti, S Zanoni, L Zavanella, A Diana
International Journal of Production Economics 108 (1-2), 236-245, 2007
1832007
Economic order quantity models for imperfect items with buy and repair options
MY Jaber, S Zanoni, LE Zavanella
International Journal of Production Economics 155, 126-131, 2014
1332014
Single-vendor single-buyer with integrated transport-inventory system: Models and heuristics in the case of perishable goods
S Zanoni, L Zavanella
Computers & Industrial Engineering 52 (1), 107-123, 2007
1262007
Layout design in dynamic environments: Strategies and quantitative indices
M Braglia, S Zanoni, L Zavanella
International Journal of Production Research 41 (5), 995-1016, 2003
1242003
Vendor managed inventory (VMI) with consignment considering learning and forgetting effects
S Zanoni, MY Jaber, LE Zavanella
International Journal of Production Economics 140 (2), 721-730, 2012
1162012
Supply chain models with greenhouse gases emissions, energy usage, imperfect process under different coordination decisions
B Marchi, S Zanoni, LE Zavanella, MY Jaber
International Journal of Production Economics 211, 145-153, 2019
1152019
Vendor managed inventory with consignment stock agreement for a supply chain with defective items
M Khan, MY Jaber, S Zanoni, L Zavanella
Applied Mathematical Modelling 40 (15-16), 7102-7114, 2016
882016
A joint economic lot size model with price and environmentally sensitive demand
S Zanoni, L Mazzoldi, LE Zavanella, MY Jaber
Production & Manufacturing Research 2 (1), 341-354, 2014
832014
Model and analysis of integrated production–inventory system: The case of steel production
S Zanoni, L Zavanella
International Journal of Production Economics 93, 197-205, 2005
802005
Vendor Managed Inventory (VMI) with Consignment Stock (CS) agreement for a two-level supply chain with an imperfect production process with/without restoration interruptions
E Bazan, MY Jaber, S Zanoni, LE Zavanella
International journal of production economics 157, 289-301, 2014
712014
A consignment stock coordination scheme for the production, remanufacturing and waste disposal problem
MY Jaber, S Zanoni, LE Zavanella
International Journal of Production Research 52 (1), 50-65, 2014
652014
On how buyback and remanufacturing strategies affect the profitability of spare parts supply chains
R Kleber, S Zanoni, L Zavanella
International journal of production economics 133 (1), 135-142, 2011
622011
Measuring and benchmarking productive systems performances using DEA: an industrial case
M Braglia, S Zanoni, L Zavanella
Production Planning & Control 14 (6), 542-554, 2003
532003
Stimulating investments in energy efficiency through supply chain integration
B Marchi, S Zanoni, I Ferretti, LE Zavanella
Energies 11 (4), 858, 2018
472018
Production–inventory scheduling using Ant System metaheuristic
I Ferretti, S Zanoni, L Zavanella
International Journal of Production Economics 104 (2), 317-326, 2006
462006
An entropic economic order quantity (EnEOQ) for items with imperfect quality
MY Jaber, S Zanoni, LE Zavanella
Applied Mathematical Modelling 37 (6), 3982-3992, 2013
422013
系统目前无法执行此操作,请稍后再试。
文章 1–20