Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms EB Tirkolaee, A Goli, M Hematian, AK Sangaiah, T Han Computing 101, 547-570, 2019 | 137 | 2019 |
A fuzzy multi-objective optimization model for sustainable closed-loop supply chain network design in food industries M Alinezhad, I Mahdavi, M Hematian, EB Tirkolaee Environment, Development and Sustainability, 1-28, 2022 | 76 | 2022 |
Development of a non-dominated sorting genetic algorithm for implementing circular economy strategies in the concrete industry M NoParast, M Hematian, A Ashrafian, MJT Amiri, H AzariJafari Sustainable Production and Consumption 27, 933-946, 2021 | 37 | 2021 |
Green supply chain flow analysis with multi-attribute demand in a multi-period product development environment S Porkar, I Mahdavi, B Maleki Vishkaei, M Hematian Operational Research 20, 1405-1435, 2020 | 29 | 2020 |
Robust scheduling of parallel machines considering total flow time S. Alimoradi, M. Hematian, G. Moslehi Computers & Industrial Engineering 93, 152-161, 2016 | 29 | 2016 |
A multiobjective integrated multiproject scheduling and multiskilled workforce assignment model considering learning effect under uncertainty M Hematian, MMS Esfahani, I Mahdavi, N Mahdavi‐Amiri, J Rezaeian Computational Intelligence, 2019 | 20 | 2019 |
Optimization of time and costs in critical chain method using genetic algorithm MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi Journal of Engineering and Applied Sciences 12 (4), 871-876, 2017 | 9 | 2017 |
Choosing an appropriate factorial system through the modern and outmoded system by two approaches ANP & AHP-FUZZY G Abdollahzadeh, MJ Taheri Amiri, E Akbari Kaffash, M Hemmatian, ... Journal of Mathematics and Computer Science 6 (2), 110-117, 2013 | 7 | 2013 |
Optimal allocation of repairs and maintenance of bridges in Mazandaran province in conditions of budget constraint using genetic algorithm MJ Taheri Amiri, F Haghighi, A Rahmani Firoozjaee, M Hematian, ... Journal of Transportation Engineering 10 (2), 199-211, 2018 | 6 | 2018 |
Prioritizing delay causes in construction projects in mazandaran province (Iran) and presenting solutions for improving it H Nazarpour, MJ Taheri Amiri, M Hemmatian Applied Mathematics in Engineering, Management And Technology 2 (4), 242-253, 2014 | 6 | 2014 |
Optimization of time and cost in critical chain project scheduling problem using genetic algorithm MJT Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi Journal of Engineering and Applied Sciences 12 (4), 871-876, 2017 | 5 | 2017 |
A multi-objective optimization model for multiple project scheduling and multi-skill human resource assignment problem based on learning and forgetting effect and activities … M Hematian, M Seyyedesfahani, I Mahdavi, N Mahdavi Amiri, J Rezaeian Journal of Industrial Engineering and Management Studies 7 (2), 98-118, 2020 | 4 | 2020 |
Optimization of time, cost and quality in critical chain method in multi project scheduling and resource constraints with considering utility function MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hemmatian, ... Journal of Structural and Construction Engineering 7 (Special Issue 3), 87-108, 2020 | 3 | 2020 |
Site layout optimization and its impact on the cost of construction projects MJ Taheri Amiri, M Hematian, F Haghighi, M Javaheri Barforooshi Amirkabir Journal of Civil Engineering 53 (2), 495-514, 2021 | 2 | 2021 |
Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem M Hemmatian, MJ Taheri Amiri, O Ghenaat Journal of Structural and Construction Engineering 6 (3), 41-56, 2019 | 2 | 2019 |
A robust optimization model for dynamic virtual hub location problem under uncertainty using an M/M/C/K queuing model: two metaheuristic algorithms S Shiripour, M Hematian, N Mahdavi-Amiri Operational Research 23 (3), 40, 2023 | 1 | 2023 |
Prioritize and Optimal Selection of Projects with Best to Worth method, VIKOR and Mathematical Programming MJ Taheri Amiri, M Hemmatian, A Asghari Journal of Structural and Construction Engineering 8 (Special Issue 2), 171-193, 2021 | 1 | 2021 |
Mazandaran Bridge Maintenance Optimization under Budget Constraint by Genetic Algorithm MJ Taheri Amiri, F Haghighi, A Rahmani Firoozjaee, M Hematian, ... Quarterly Journal of Transportation Engineering 10 (2), 199-211, 2018 | 1 | 2018 |
Optimizing the life cycle cost of bridges by considering the reliability of bridges (Case study of bridges from Sari to Mahmudabad) MJ Taheri Amiri, M Hematian, S Roshanghalb Amirkabir Journal of Civil Engineering 54 (10), 3723-3742, 2022 | | 2022 |
Selection the Optimal Methods for Pavement Maintenance Northern According to the Type of Damage and Remedial Action for their MJ Taheri Amiri, M Hematian, F Haghighi, M Rezaeyan Journal of Transportation Research 19 (4), 147-162, 2022 | | 2022 |