关注
Milad Hematian
标题
引用次数
引用次数
年份
Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms
EB Tirkolaee, A Goli, M Hematian, AK Sangaiah, T Han
Computing 101, 547-570, 2019
1372019
A fuzzy multi-objective optimization model for sustainable closed-loop supply chain network design in food industries
M Alinezhad, I Mahdavi, M Hematian, EB Tirkolaee
Environment, Development and Sustainability, 1-28, 2022
762022
Development of a non-dominated sorting genetic algorithm for implementing circular economy strategies in the concrete industry
M NoParast, M Hematian, A Ashrafian, MJT Amiri, H AzariJafari
Sustainable Production and Consumption 27, 933-946, 2021
372021
Green supply chain flow analysis with multi-attribute demand in a multi-period product development environment
S Porkar, I Mahdavi, B Maleki Vishkaei, M Hematian
Operational Research 20, 1405-1435, 2020
292020
Robust scheduling of parallel machines considering total flow time
S. Alimoradi, M. Hematian, G. Moslehi
Computers & Industrial Engineering 93, 152-161, 2016
292016
A multiobjective integrated multiproject scheduling and multiskilled workforce assignment model considering learning effect under uncertainty
M Hematian, MMS Esfahani, I Mahdavi, N Mahdavi‐Amiri, J Rezaeian
Computational Intelligence, 2019
202019
Optimization of time and costs in critical chain method using genetic algorithm
MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi
Journal of Engineering and Applied Sciences 12 (4), 871-876, 2017
92017
Choosing an appropriate factorial system through the modern and outmoded system by two approaches ANP & AHP-FUZZY
G Abdollahzadeh, MJ Taheri Amiri, E Akbari Kaffash, M Hemmatian, ...
Journal of Mathematics and Computer Science 6 (2), 110-117, 2013
72013
Optimal allocation of repairs and maintenance of bridges in Mazandaran province in conditions of budget constraint using genetic algorithm
MJ Taheri Amiri, F Haghighi, A Rahmani Firoozjaee, M Hematian, ...
Journal of Transportation Engineering 10 (2), 199-211, 2018
62018
Prioritizing delay causes in construction projects in mazandaran province (Iran) and presenting solutions for improving it
H Nazarpour, MJ Taheri Amiri, M Hemmatian
Applied Mathematics in Engineering, Management And Technology 2 (4), 242-253, 2014
62014
Optimization of time and cost in critical chain project scheduling problem using genetic algorithm
MJT Amiri, F Haghighi, E Eshtehardian, M Hematian, H Kordi
Journal of Engineering and Applied Sciences 12 (4), 871-876, 2017
52017
A multi-objective optimization model for multiple project scheduling and multi-skill human resource assignment problem based on learning and forgetting effect and activities …
M Hematian, M Seyyedesfahani, I Mahdavi, N Mahdavi Amiri, J Rezaeian
Journal of Industrial Engineering and Management Studies 7 (2), 98-118, 2020
42020
Optimization of time, cost and quality in critical chain method in multi project scheduling and resource constraints with considering utility function
MJ Taheri Amiri, F Haghighi, E Eshtehardian, M Hemmatian, ...
Journal of Structural and Construction Engineering 7 (Special Issue 3), 87-108, 2020
32020
Site layout optimization and its impact on the cost of construction projects
MJ Taheri Amiri, M Hematian, F Haghighi, M Javaheri Barforooshi
Amirkabir Journal of Civil Engineering 53 (2), 495-514, 2021
22021
Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem
M Hemmatian, MJ Taheri Amiri, O Ghenaat
Journal of Structural and Construction Engineering 6 (3), 41-56, 2019
22019
A robust optimization model for dynamic virtual hub location problem under uncertainty using an M/M/C/K queuing model: two metaheuristic algorithms
S Shiripour, M Hematian, N Mahdavi-Amiri
Operational Research 23 (3), 40, 2023
12023
Prioritize and Optimal Selection of Projects with Best to Worth method, VIKOR and Mathematical Programming
MJ Taheri Amiri, M Hemmatian, A Asghari
Journal of Structural and Construction Engineering 8 (Special Issue 2), 171-193, 2021
12021
Mazandaran Bridge Maintenance Optimization under Budget Constraint by Genetic Algorithm
MJ Taheri Amiri, F Haghighi, A Rahmani Firoozjaee, M Hematian, ...
Quarterly Journal of Transportation Engineering 10 (2), 199-211, 2018
12018
Optimizing the life cycle cost of bridges by considering the reliability of bridges (Case study of bridges from Sari to Mahmudabad)
MJ Taheri Amiri, M Hematian, S Roshanghalb
Amirkabir Journal of Civil Engineering 54 (10), 3723-3742, 2022
2022
Selection the Optimal Methods for Pavement Maintenance Northern According to the Type of Damage and Remedial Action for their
MJ Taheri Amiri, M Hematian, F Haghighi, M Rezaeyan
Journal of Transportation Research 19 (4), 147-162, 2022
2022
系统目前无法执行此操作,请稍后再试。
文章 1–20