Autonomous vehicles: challenges, opportunities, and future implications for transportation policies SA Bagloee, M Tavana, M Asadi, T Oliver Journal of modern transportation 24, 284-303, 2016 | 944 | 2016 |
An integrated green supplier selection approach with analytic network process and improved Grey relational analysis SH Hashemi, A Karimi, M Tavana International Journal of Production Economics 159, 178-191, 2015 | 664 | 2015 |
A taxonomy and review of the fuzzy data envelopment analysis literature: two decades in the making A Hatami-Marbini, A Emrouznejad, M Tavana European journal of operational research 214 (3), 457-472, 2011 | 536 | 2011 |
An extension of the Electre I method for group decision-making under a fuzzy environment A Hatami-Marbini, M Tavana Omega 39 (4), 373-386, 2011 | 410 | 2011 |
An integrated intuitionistic fuzzy AHP and SWOT method for outsourcing reverse logistics M Tavana, M Zareinejad, D Di Caprio, MA Kaviani Applied soft computing 40, 544-557, 2016 | 261 | 2016 |
Performance Measurement with Fuzzy Data Envelopment Analysis A Emrouznejad, M Tavana Springer-Verlag, 2014 | 248* | 2014 |
An application of an integrated ANP–QFD framework for sustainable supplier selection M Tavana, M Yazdani, D Di Caprio International Journal of Logistics Research and Applications 20 (3), 254-275, 2017 | 225 | 2017 |
A new multi-objective particle swarm optimization method for solving reliability redundancy allocation problems K Khalili-Damghani, AR Abtahi, M Tavana Reliability Engineering & System Safety 111, 58-75, 2013 | 218 | 2013 |
A methodology for selecting portfolios of projects with interactions and under uncertainty AH Ghapanchi, M Tavana, MH Khakbaz, G Low International Journal of Project Management 30 (7), 791-803, 2012 | 216 | 2012 |
A group AHP-TOPSIS framework for human spaceflight mission planning at NASA M Tavana, A Hatami-Marbini Expert Systems with Applications 38 (11), 13588-13603, 2011 | 205 | 2011 |
A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems M Tavana, AR Abtahi, K Khalili-Damghani Expert systems with applications 41 (4), 1830-1846, 2014 | 200 | 2014 |
Multi-objective control chart design optimization using NSGA-III and MOPSO enhanced with DEA and TOPSIS M Tavana, Z Li, M Mobin, M Komaki, E Teymourian Expert Systems with Applications 50, 17-39, 2016 | 193 | 2016 |
A fuzzy hybrid project portfolio selection method using data envelopment analysis, TOPSIS and integer programming M Tavana, M Keramatpour, FJ Santos-Arteaga, E Ghorbaniane Expert Systems with Applications 42 (22), 8432-8444, 2015 | 188 | 2015 |
A fuzzy group Electre method for safety and health assessment in hazardous waste recycling facilities A Hatami-Marbini, M Tavana, M Moradi, F Kangi Safety science 51 (1), 414-426, 2013 | 177 | 2013 |
A novel fuzzy multi-objective circular supplier selection and order allocation model for sustainable closed-loop supply chains AK Nasr, M Tavana, B Alavi, H Mina Journal of Cleaner production 287, 124994, 2021 | 176 | 2021 |
A dynamic decision support system for sustainable supplier selection in circular economy B Alavi, M Tavana, H Mina Sustainable Production and Consumption 27, 905-920, 2021 | 161 | 2021 |
A three-stage data envelopment analysis model with application to banking industry A Ebrahimnejad, M Tavana, FH Lotfi, R Shahverdi, M Yousefpour Measurement 49, 308-319, 2014 | 158 | 2014 |
A robust optimization approach for imprecise data envelopment analysis AH Shokouhi, A Hatami-Marbini, M Tavana, S Saati Computers & Industrial Engineering 59 (3), 387-397, 2010 | 158 | 2010 |
A novel hybrid social media platform selection model using fuzzy ANP and COPRAS-G M Tavana, E Momeni, N Rezaeiniya, SM Mirhedayatian, H Rezaeiniya Expert Systems with Applications 40 (14), 5694-5702, 2013 | 157 | 2013 |
A hybrid intelligent fuzzy predictive model with simulation for supplier evaluation and selection M Tavana, A Fallahpour, D Di Caprio, FJ Santos-Arteaga Expert Systems with Applications 61, 129-144, 2016 | 153 | 2016 |