Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs C Rajendran, H Ziegler European Journal of Operational Research 155 (2), 426-438, 2004 | 619 | 2004 |
An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs C Rajendran, H Ziegler European Journal of Operational Research 103 (1), 129-138, 1997 | 213 | 1997 |
Impact of human resource management practices on employee turnover intentions: Moderating role of psychological contract breach N Santhanam, K TJ, L Dyaram, H Ziegler Journal of Indian Business Research 9 (3), 212-228, 2017 | 157 | 2017 |
Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times C Rajendran, H Ziegler European Journal of Operational Research 149 (3), 513-522, 2003 | 108 | 2003 |
Two ant-colony algorithms for minimizing total flowtime in permutation flowshops C Rajendran, H Ziegler Computers & Industrial Engineering 48 (4), 789-797, 2005 | 101 | 2005 |
A comparison of heuristic algorithms for cost-oriented assembly line balancing O Rosenberg, H Ziegler Zeitschrift für Operations Research 36, 477-495, 1992 | 91 | 1992 |
An ant colony algorithm for scheduling in flowshops with sequence-dependent setup times of jobs Y Gajpal, C Rajendran, H Ziegler The international journal of advanced manufacturing technology 30, 416-424, 2006 | 75 | 2006 |
Examining the moderating effects of organizational identification between human resource practices and employee turnover intentions in Indian hospitality industry N Santhanam, TJ Kamalanabhan, L Dyaram, H Ziegler GSTF Journal on Business Review (GBR) 4 (1), 11 - 19, 2015 | 60 | 2015 |
Solving Certain Singly Constrained Convex Optimization Problems in Production Planning H Ziegler Operations Research Letters 1, 246 - 252, 1982 | 57 | 1982 |
A heuristic for scheduling to minimize the sum of weighted flowtime of jobs in a flowshop with sequence-dependent setup times of jobs C Rajendran, H Ziegler Computers & Industrial Engineering 33 (1-2), 281-284, 1997 | 45 | 1997 |
Heuristics for scheduling in a flowshop with setup, processing and removal times separated C Rajendran, H Ziegler Production Planning & Control 8 (6), 568-576, 1997 | 43 | 1997 |
A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs C Rajendran, H Ziegler European Journal of Operational Research 131 (3), 622-634, 2001 | 42 | 2001 |
Improving job shop performance by coordinating dispatching rules O Holthaus, H Ziegler PROCEEDINGS-SPIE THE INTERNATIONAL SOCIETY FOR OPTICAL ENGINEERING, 218-218, 1995 | 41 | 1995 |
The value of information sharing in a serial supply chain with AR (1) demand and non-zero replenishment lead times D Sabitha, C Rajendran, S Kalpakam, H Ziegler European Journal of Operational Research 255 (3), 758-777, 2016 | 38 | 2016 |
Heuristics for scheduling in flowshops and flowline-based manufacturing cells to minimize the sum of weighted flowtime and weighted tardiness of jobs C Rajendran, H Ziegler Computers & Industrial Engineering 37 (4), 671-690, 1999 | 30 | 1999 |
Age dependent perishability in two-echelon serial inventory systems LL Abdel-Malek, H Ziegler Computers & Operations Research 15 (3), 227-238, 1988 | 29 | 1988 |
A multi-objective ant-colony algorithm for permutation flowshop scheduling to minimize the makespan and total flowtime of jobs C Rajendran, H Ziegler Computational Intelligence in Flow Shop and Job Shop Scheduling, 53-99, 2009 | 20 | 2009 |
Capacitated lot sizing problems in process industries R Ramya, C Rajendran, H Ziegler, S Mohapatra, K Ganesh Springer, 2019 | 19 | 2019 |
Capacitated lot-sizing problem with production carry-over and set-up splitting: mathematical models R Ramya, C Rajendran, H Ziegler International Journal of Production Research 54 (8), 2332-2344, 2016 | 19 | 2016 |
Verteilte Simulation dezentraler Werkstattfertigungssysteme O Rosenberg, H Ziegler, O Holthaus Information Management 8 (2), 6-12, 1993 | 15 | 1993 |