Multi-objective optimisation of dynamic scheduling in robotic flexible assembly cells via fuzzy-based Taguchi approach K Abd, K Abhary, R Marian Computers & industrial engineering 99, 250-259, 2016 | 32 | 2016 |
Simulation modelling and analysis of scheduling in robotic flexible assembly cells using Taguchi method K Abd, K Abhary, R Marian International Journal of Production Research 52 (9), 2654-2666, 2014 | 32 | 2014 |
A scheduling framework for robotic flexible assembly cells K Abd, K Abhary, R Marian Applied Science and Engineering Progress 4 (1), 31-38, 2011 | 25 | 2011 |
Intelligent scheduling of robotic flexible assembly cells KK Abd Springer, 2015 | 21 | 2015 |
Efficient scheduling rule for robotic flexible assembly cells based on fuzzy approach K Abd, K Abhary, R Marian Procedia CIRP 3, 483-488, 2012 | 21 | 2012 |
Implementation of a bi-directional digital twin for industry 4 labs in academia: a solution based on OPC UA A Protic, Z Jin, R Marian, K Abd, D Campbell, J Chahl 2020 IEEE international conference on industrial engineering and engineering …, 2020 | 19 | 2020 |
An MCDM Approach to Selection Scheduling Rule in Robotic Flexibe Assembly Cells K Abd, K Abhary, R Marian International Journal of Industrial and Manufacturing Engineering 5 (4), 878-883, 2011 | 18 | 2011 |
Scheduling and performance evaluation of robotic flexible assembly cells under different dispatching rules K Abd, K Abhary, R Marian Information Engineering Research Institute, 2011 | 17 | 2011 |
Intelligent modeling of scheduling robotic flexible assembly cells using fuzzy logic K Abd, K Abhary, R Marian World Scientific and Engineering Academy and Society, 2012 | 14 | 2012 |
A fuzzy decision support system for selecting the optimal scheduling rule in robotic flexible assembly cells K Abd, K Abhary, R Marian Australian Journal of Multi-Disciplinary Engineering 9 (2), 125-132, 2013 | 10 | 2013 |
Application of fuzzy logic to multi-objective scheduling problems in robotic flexible assembly cells K Abd, K Abhary, R Marian Information Science Publishing, 2013 | 8 | 2013 |
A methodology for fuzzy multi-criteria decision-making approach for scheduling problems in robotic flexible assembly cells K Abd, K Abhary, R Marian 2014 IEEE International Conference on Industrial Engineering and Engineering …, 2014 | 7 | 2014 |
Development of a fuzzy-simulation model of scheduling robotic flexible assembly cells K Abd, K Abhary, R Marian Journal of Computer Science 9 (12), 1761, 2013 | 7 | 2013 |
A methodology for scheduling robotic flexible assembly cells using fuzzy logic and simulation K Abd, K Abhary, R Marian Newswood Limited, 2013 | 6 | 2013 |
Comparative Analysis of MCDM Methods and Implementation of the Scheduling Rule Selection Problem: A Case Study Robotic Flexible Assembly Cells K Abd, K Abhary, R Marian International Conference on Advanced Engineering Optimization Through …, 2013 | 4 | 2013 |
Intelligent Model of Scheduling RFACs-Part 1: Methodology and Strategy K Abd, K Abhary, R Marian DAAAM International Publishing, 2013 | 4 | 2013 |
Development of a novel control approach for collaborative robotics in i4 intelligent flexible assembling cells A Protic, Z Jin, R Marian, K Abd, D Campbell, J Chahl 2020 IEEE International Conference on Industrial Engineering and Engineering …, 2020 | 3 | 2020 |
Comparative analysis of Fuzzy MCDM methods for material selection in biomedical application AF Hussein, BI Jameel, KK Abd Association of Arab Universities Journal of Engineering Sciences 25 (2), 137-148, 2018 | 3 | 2018 |
DEVELOPMENT OF FUZZY AHP AND TOPSIS APPROACH FOR MULTI-OBJECTIVE SCHEDULING PROBLEMS IN ROBOTIC FLEXIBLE ASSEMBLY CELLS. K Abd, K Abhary, R Marian DAAAM International Scientific Book, 2017 | 3 | 2017 |
Development of an Intelligent Methodology for Scheduling RFAC KK Abd, KK Abd Intelligent Scheduling of Robotic Flexible Assembly Cells, 31-47, 2016 | 2 | 2016 |