Material waste in building industry: main causes and prevention CT Formoso, L Soibelman, C De Cesare, EL Isatto Journal of construction engineering and management 128 (4), 316-325, 2002 | 737 | 2002 |
Method for waste control in the building industry CT Formoso, EL Isatto, EH Hirota Proceedings IGLC 7, 325-334, 1999 | 309 | 1999 |
Production Planning and Control and the Coordination of Project Supply Chains CT Formoso, EL Isatto Construction Supply Chain Management Handbook, 2009 | 238* | 2009 |
Lean construction: diretrizes e ferramentas para o controle de perdas na construção civil EL Isatto, CT FORMOSO, CM DE CESARE, EH HIROTA, TCL ALVES Porto Alegre: SEBRAE-RS, 2000 | 159 | 2000 |
An exploratory study on the measurement and analysis of making-do in construction sites CT Formoso, L Sommer, L Koskela, EL Isatto Annual Conference of the International Group for Lean Construction 19, 2011 | 62 | 2011 |
Uso de modelagem 4D e Building Information Modeling na gestão de sistemas de produção em empreendimentos de construção CN Biotto, CT Formoso, EL Isatto Ambiente Construído 15 (2), 79-96, 2015 | 57 | 2015 |
Método de intervenção para redução de perdas na construção civil: manual de utilização A SANTOS, CT FORMOSO, E Isatto, E LANTELEM Porto Alegre, SEBRAE/RS, 1996 | 54 | 1996 |
Integrating Production and Quality Control: monitoring making-do and unfinished work MCT Fireman, CT Formoso, EL Isatto Annual Conference of the International Group for Lean Construction 21, 2013 | 52 | 2013 |
Understanding the theory behind the Last Planner System using the Language-Action Perspective: two case studies DD Viana, CT Formoso, EL Isatto Production planning & control 28 (3), 177-189, 2017 | 41 | 2017 |
The Role of Commitments for the Management of Construction Make-to-Order Supply Chains EL Isatto, M Azambuja, CT Formoso Journal of Management in Engineering, 2013 | 40 | 2013 |
Integrating strategic project supply chain members in production planning and control MP Sterzi, EL Isatto, CT Formoso Proceedings - 15th annual Conference of the International Group for Lean …, 2007 | 37 | 2007 |
Implementation of standard work in the construction industry W Fazinga, F Saffaro, E Isatto, E Lantelme Revista ingeniería de construcción 34 (3), 288-298, 2019 | 32 | 2019 |
The identification and analysis of making-do waste: insights from two Brazilian construction sites CT Formoso, L Sommer, L Koskela, EL Isatto Ambiente Construído 17, 183-197, 2017 | 32 | 2017 |
Implementación del trabajo estandarizado en la industria de la construcción W Fazinga, F Saffaro, E Isatto, E Lantelme Revista ingeniería de construcción 34 (3), 288-298, 2019 | 25 | 2019 |
Proposição de um modelo teórico-descritivo para a coordenação inter-organizacional de cadeias de suprimentos de empreendimentos de construção EL Isatto Universidade Federal do Rio Grande do Sul. Escola, 2005 | 24 | 2005 |
Design and production interface in Lean Production: a performance improvement criteria proposition EL Isatto, CT Formoso Proceedings - 6th Annual Conference of the International Group for Lean …, 1998 | 21 | 1998 |
Proposta de modelo para controle integrado da produção e da qualidade com apoio da computação móvel CF Leão, EL Isatto, CT Formoso Ambiente Construído 16 (4), 109-124, 2016 | 19 | 2016 |
Simulating the last planner with systems dynamic BP Mota, DD Viana, EL Isatto Proc. 18th Ann. Conf. of the Int’l. Group for Lean Construction, Technion …, 2010 | 19 | 2010 |
As relações entre empresas construtoras de edificações e seus fornecedores de materiais EL Isatto Universidade Federal do Rio Grande do Sul. Escola, 1996 | 19 | 1996 |
Modelling the network of commitments in the Last Planner System DD Viana, CT Formoso, EL Isatto Lean Construction 2011, 2011 | 18 | 2011 |