关注
Gökçeçiçek TAŞOĞLU
Gökçeçiçek TAŞOĞLU
在 cbu.edu.tr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Simulated annealing based simulation optimization method for solving integrated berth allocation and quay crane scheduling problems
G Tasoglu, G Yildiz
Simulation Modelling Practice and Theory 97, 101948, 2019
502019
A fuzzy analytic hierarchy process methodology for the supplier selection problem
P Mızrak Özfirat, G Tuna Taşoglu, G Tunçel Memiş
Journal of Enterprise Information Management 27 (3), 292-301, 2014
412014
Simultaneous determination of disassembly sequence and disassembly-to-order decisions using simulation optimization
MA Ilgin, GT Taşoğlu
Journal of Manufacturing Science and Engineering 138 (10), 101012, 2016
292016
A simulation-based genetic algorithm approach for the simultaneous consideration of reverse logistics network design and disassembly line balancing with sequencing
G Tasoglu, MA Ilgin
Computers and Industrial Engineering 187, 109794, 2024
72024
Part transformation-based spare parts inventory control model for the high-tech industries
H Güçdemir, G Taşoğlu
International Journal of Industrial Engineering Computations 15 (1), 307-326, 2024
22024
A SIMULATION MODELLING APPROACH FOR BERTH ALLOCATION AND QUAY CRANE SCHEDULING PROBLEMS
G TAŞOĞLU, G YILDIZ
LM-SCM 2016 XIV. INTERNATIONAL LOGISTICS AND SUPPLY CHAIN CONGRESS, 329, 2016
2016
系统目前无法执行此操作,请稍后再试。
文章 1–6