Transition in adopting project delivery method with early contractor involvement E Scheepbouwer, AB Humphries Transportation research record 2228 (1), 44-50, 2011 | 75 | 2011 |
Critical success factors for post-disaster infrastructure recovery: Learning from the Canterbury (NZ) earthquake recovery M Liu, E Scheepbouwer, S Giovinazzi Disaster Prevention and Management: An International Journal 25 (5), 685-700, 2016 | 45 | 2016 |
A study into the cyclical performance of the New Zealand construction industry N Allan, Y Yin, E Scheepbouwer Centre for Advanced Engineering, 2008 | 37 | 2008 |
Infrastructure asset life cycle cost analysis issues DD Gransberg, E Scheepbouwer 2010 Transactions, CSC0301-CSC038, 2010 | 27 | 2010 |
A regulatory perspective on safety in design practices in New Zealand BHW Guo, R Weston, P Jianphinitnan, W Liu, E Scheepbouwer, ... Safety Science 141, 105352, 2021 | 23 | 2021 |
Construction engineering management culture shift: Is the lowest tender offer dead? E Scheepbouwer, DD Gransberg, C Lopez del Puerto Frontiers of Engineering Management 4 (1), 49-57, 2017 | 19 | 2017 |
Christchurch rebuild, New Zealand: Alliancing with a difference PS Botha, E Scheepbouwer Proceedings of the Institution of Civil Engineers-Management, Procurement …, 2015 | 19 | 2015 |
Overview And Analysis Of Digital Technologies For Construction Safety Management B Guo, E Scheepbouwer, TW Yiu, VA González AUBEA 2017, 766-775, 2017 | 17* | 2017 |
Making the business case for alliance contracting on US megaprojects D Gransberg, E Scheepbouwer, CL Del Puerto Construction Research Congress 2016, 388-397, 2016 | 16* | 2016 |
U.S. Partnering Programs and International Partnering Contracts and Alliances DD Gransberg, E Scheepbouwer Transportation Research Record: Journal of the Transportation Research Board …, 2015 | 16* | 2015 |
Alliance Contracting—Evolving Alternative Project Delivery DD Gransberg, E Scheepbouwer, MC Loulakis NCHRP Synthesis of Highway Practice, 2015 | 15 | 2015 |
Relationship between early contractor involvement and financial performance in the rebuilding of infrastructure in Christchurch, New Zealand PS Botha, E Scheepbouwer Transportation Research Record 2504 (1), 66-72, 2015 | 14* | 2015 |
Performance-Specified Maintenance Contracting—The New Zealand Approach to Pavement Preservation DD Gransberg, E Scheepbouwer, SL Tighe First International Conference on Pavement Preservation, Newport Beach …, 2010 | 14 | 2010 |
Differential rutting in Canterbury New Zealand, and its relation to road camber JD van der Walt, E Scheepbouwer, SL Tighe International Journal of Pavement Engineering 19 (9), 798-804, 2018 | 11 | 2018 |
When to Engage the Contractor for Pre-Construction Services in New Zealand JD van der Walt, PS Botha, E Scheepbouwer Transportation Research Record 2673 (2), 562-570, 2019 | 10 | 2019 |
An ontology of control measures for fall from height in the construction industry BHW Guo, YM Goh, E Scheepbouwer, Y Zou 42nd AUBEA Conference 2018: Educating Building Professionals for the Future …, 2018 | 7 | 2018 |
Transitional issues in adopting the early contractor involvement (ECI) project delivery method E Scheepbouwer, AB Humphries Transportation Research Board 90th Annual MeetingTransportation Research Board, 2011 | 7 | 2011 |
Project Management Strategies for Complex Projects: Case Study Report J Shane, K Strong, D Gransberg, J Ahn, N Allan, D Brisk, J Hunt, ... SHRP 2 Report, 2014 | 6 | 2014 |
Statistical Model for Estimating Restoration Time of Sewerage Pipelines after Earthquakes M Liu, E Scheepbouwer, D Gerhard Journal of Performance of Constructed Facilities 31 (5), 2017 | 5 | 2017 |
Emergency Megaproject Case Study Protest: The Interstate Highway 35 West Bridge CL del Puerto, E Scheepbouwer, DD Gransberg, MC Loulakis Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2017 | 5 | 2017 |