供应链管理理论与方法 沈厚才, 陶青, 陈煜波 中国管理科学, 1-9, 2012 | 287 | 2012 |
供应链中牛鞭效应问题研究 达庆利, 张钦, 沈厚才 管理科学学报 6 (003), 86-93, 2003 | 145 | 2003 |
Coordinating a supply chain with a quality assurance policy via a revenue-sharing contract T Xiao, D Yang, H Shen International Journal of Production Research 49 (1), 99-120, 2011 | 109 | 2011 |
在 ARIMA (0, 1, 1) 需求下的牛鞭效应与信息共享的评价 张钦, 达庆利, 沈厚才 中国管理科学, 1-6, 2012 | 70 | 2012 |
Risks in prefabricated buildings in China: importance-performance analysis approach ZL Wang, HC Shen, J Zuo Sustainability 11 (12), 3450, 2019 | 64 | 2019 |
Optimal inventory and hedging decisions with CVaR consideration W Xue, L Ma, H Shen International Journal of Production Economics 162, 70-82, 2015 | 55 | 2015 |
一类离散应急供应系统的两目标优化模型 刘春林, 沈厚才 中国管理科学, 27-31, 2012 | 55* | 2012 |
A logistics network design model with vendor managed inventory J Shu, Z Li, H Shen, T Wu, W Zhong International Journal of Production Economics 135 (2), 754-761, 2012 | 52 | 2012 |
Pricing, service level and lot size decisions of a supply chain with risk-averse retailers: implications to practitioners D Yang, T Xiao, H Shen Production Planning and Control 20 (4), 320-331, 2009 | 49 | 2009 |
A multi-period location model with transportation economies-of-scale and perishable inventory T Wu, H Shen, C Zhu International Journal of Production Economics 169, 343-349, 2015 | 48 | 2015 |
The component procurement problem for the loss-averse manufacturer with spot purchase H Shen, Z Pang, TCE Cheng International Journal of Production Economics 132 (1), 146-153, 2011 | 46 | 2011 |
损失规避偏好下的定制件采购决策分析 沈厚才, 徐进, 庞湛 管理科学学报 7 (6), 37-45, 2004 | 39 | 2004 |
Incentives for quality improvement efforts coordination in supply chains with partial cost allocation contract C Gao, TCE Cheng, H Shen, L Xu International Journal of Production Research 54 (20), 6216-6231, 2016 | 35 | 2016 |
The choice of energy saving modes for an energy-intensive manufacturer considering non-energy benefits J Ouyang, H Shen Journal of cleaner production 141, 83-98, 2017 | 34 | 2017 |
Inventory Rationing in a Make-to-Stock System with Batch Production and Lost Sales Z Pang, H Shen, TCE Cheng Production and Operations Management, 2014 | 31 | 2014 |
供应链中基于 Stackelberg 博弈的 EOQ 模型 张钦, 达庆利, 沈厚才 中国管理科学, 38-42, 2012 | 31 | 2012 |
分散式供应链中旁支付激励机制的研究 罗定提, 仲伟俊, 张晓琪, 沈厚才 系统工程学报 16 (3), 236-240, 2001 | 31 | 2001 |
Production planning and pricing policy in a make-to-stock system with uncertain demand subject to machine breakdowns X Shi, H Shen, T Wu, TCE Cheng European Journal of Operational Research, 2014 | 30 | 2014 |
Production planning and inventory allocation of a single-product assemble-to-order system with failure-prone machines TCE Cheng, C Gao, H Shen International Journal of Production Economics 131 (2), 604-617, 2011 | 30 | 2011 |
Production and inventory rationing in a make-to-stock system with a failure-prone machine and lost sales TCE Cheng, C Gao, H Shen IEEE transactions on automatic control 56 (5), 1176-1180, 2011 | 24 | 2011 |