Fuzzy critical chain method for project scheduling under resource constraints and uncertainty LD Long, A Ohsato International journal of project management 26 (6), 688-698, 2008 | 302 | 2008 |
A genetic algorithm-based method for scheduling repetitive construction projects LD Long, A Ohsato Automation in construction 18 (4), 499-511, 2009 | 165 | 2009 |
Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution DL Luong, DH Tran, PT Nguyen International Journal of Construction Management 21 (3), 271-283, 2021 | 143 | 2021 |
Nature-inspired metaheuristic ensemble model for forecasting energy consumption in residential buildings DH Tran, DL Luong, JS Chou Energy 191, 116552, 2020 | 101 | 2020 |
Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects DH Tran, L Luong-Duc, MT Duong, TN Le, AD Pham Journal of Computational Design and Engineering 5 (2), 160-172, 2018 | 63 | 2018 |
Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution DH Tran, LD Long Engineering, Construction and Architectural Management 25 (5), 623-638, 2018 | 55 | 2018 |
Hybrid multiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem LD Long, DH Tran, PT Nguyen International Journal of Computer Applications in Technology 60 (3), 203-214, 2019 | 35 | 2019 |
Multi-objective symbiotic organisms optimization for making time-cost tradeoffs in repetitive project scheduling problem DH Tran, JS Chou, DL Luong Journal of Civil Engineering and Management 25 (4), 322-339, 2019 | 33 | 2019 |
Optimizing non-unit repetitive project resource and scheduling by evolutionary algorithms DH Tran, JS Chou, DL Luong Operational Research 22 (1), 77-103, 2022 | 17 | 2022 |
The development of a decision support model for eco-friendly material selection in Vietnam AD Pham, QT Nguyen, DL Luong, QC Truong Sustainability 12 (7), 2769, 2020 | 16 | 2020 |
An AI-driven model for predicting and optimizing energy-efficient building envelopes LD Long Alexandria Engineering Journal 79, 480-501, 2023 | 15 | 2023 |
Building a decision-making support framework for installing solar panels on vertical glazing façades of the building based on the life cycle assessment and environmental … DL Luong, QT Nguyen, AD Pham, QC Truong, MQ Duong Energies 13 (9), 2376, 2020 | 12 | 2020 |
BIM to BEM transition for optimizing envelope design selection to enhance building energy efficiency and Cost-Effectiveness NS Truong, DL Luong, QT Nguyen Energies 16 (10), 3976, 2023 | 11 | 2023 |
Solving the Resource-Constrained Project Scheduling Problem by Genetic Algorithm (< Special English Issue> Global Supply Chain Management) LD Long, A Ohsato Journal of Japan Industrial Management Association 57 (6), 520-529, 2007 | 10 | 2007 |
Developing an Optimisation Model of Solar Cell Installation on Building Facades in High-Rise Buildings-A Case study in Viet Nam QT Nguyen, DL Luong, AD Pham, QC Truong GMSARN Int. J 15 (1), 44-49, 2021 | 5 | 2021 |
Project schedule management using a fuzzy activity network considering resource and environmental factors LD Long, A Ohsato Journal of Japan Industrial Management Association 57 (4), 261-271, 2006 | 5 | 2006 |
Bilateral negotiation model for intelligent decision-making under uncertainty PVH Son, SS Leu, LD Long International Journal of Computer Applications in Technology 54 (2), 89-95, 2016 | 4 | 2016 |
Enhancing Building Energy Efficiency with Aluminum Composite Material Facade: A Performance Simulation Study using Building Energy Modeling and Building Information Modeling DL Luong, NS Truong, NT Ngo, QT Nguyen IOP Conference Series: Materials Science and Engineering 1289 (1), 012040, 2023 | 3 | 2023 |
Enhancing building with adaptive design objects using building information modelling towards consuming energy efficacy in building NS Truong, DL Luong, NT Ngo, QT Nguyen, NTL Dang ICSCEA 2021: Proceedings of the Second International Conference on …, 2022 | 2 | 2022 |
A non-unit repetitive construction project scheduling with uncertainties LD Long Automation in Construction 164, 105428, 2024 | 1 | 2024 |