Do you need a blockchain in construction? Use case categories and decision framework for DLT design options JJ Hunhevicz, DM Hall Advanced Engineering Informatics 45, 101094, 2020 | 220 | 2020 |
Digital building twins and blockchain for performance-based (smart) contracts JJ Hunhevicz, M Motie, DM Hall Automation in Construction 133, 103981, 2022 | 129 | 2022 |
Resource efficiency in industrialized housing construction–A systematic review of current performance and future opportunities F Kedir, DM Hall Journal of Cleaner Production, 125443, 2021 | 113 | 2021 |
Identifying the role of supply chain integration practices in the adoption of systemic innovations DM Hall, A Algiers, RE Levitt Journal of management in engineering 34 (6), 04018030, 2018 | 113 | 2018 |
Mirror-breaking strategies to enable digital manufacturing in Silicon Valley construction firms: a comparative case study DM Hall, JK Whyte, J Lessing Construction management and economics 38 (4), 322-339, 2020 | 112 | 2020 |
Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies Q Chen, BT Adey, C Haas, DM Hall Construction innovation 20 (3), 471-508, 2020 | 91 | 2020 |
Identifying enablers for coordination across construction supply chain processes: a systematic literature review Q Chen, DM Hall, BT Adey, CT Haas Engineering, construction and architectural management 28 (4), 1083-1113, 2020 | 84 | 2020 |
Early Stages in the Institutionalization of Integrated Project Delivery DM Hall, WR Scott Project Management Journal, 2019 | 80 | 2019 |
Integrated BIM-based LCA for the entire building process using an existing structure for cost estimation in the Swiss context A Naneva, M Bonanomi, A Hollberg, G Habert, D Hall Sustainability 12 (9), 3748, 2020 | 68 | 2020 |
The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms MM Bonanomi, DM Hall, S Staub-French, A Tucker, CML Talamo Engineering, Construction and Architectural Management 27 (4), 872-892, 2019 | 65 | 2019 |
Cross-phase product configurator for modular buildings using kit-of-parts J Cao, DF Bucher, DM Hall, J Lessing Automation in Construction 123, 103437, 2021 | 59 | 2021 |
The role of integrated project delivery elements in adoption of integral innovations DM Hall, A Algiers, T Lehtinen, RE Levitt, C Li, P Padachuri EPOC 2014, 2014 | 48 | 2014 |
The transition to the circular economy of the construction industry: Insights into sustainable approaches to improve the understanding R Charef, W Lu, D Hall Journal of Cleaner Production 364, 132421, 2022 | 46 | 2022 |
Governing collaborative project delivery as a common-pool resource scenario DM Hall, MM Bonanomi Project management journal 52 (3), 250-263, 2021 | 34 | 2021 |
Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management Q Chen, BT Adey, CT Haas, DM Hall Construction Innovation 22 (1), 76-100, 2022 | 33 | 2022 |
DFAB House: A comprehensive demonstrator of digital fabrication in architecture MK Konrad Graser, Marco Baur, Aleksandra Anna Apolinarska, Kathrin Dörfler ... Fabricate, 130-139, 2020 | 33* | 2020 |
Digital fabrication, BIM and early contractor involvement in design in construction projects: A comparative case study MS Ng, K Graser, DM Hall Architectural Engineering and Design Management 19 (1), 39-55, 2023 | 31 | 2023 |
One approach does not fit all (smart) cities: Causal recipes for cities' use of “data and analytics” RWS Ruhlandt, R Levitt, R Jain, D Hall Cities 104, 102800, 2020 | 30 | 2020 |
Incentivizing high-quality data sets in construction using blockchain: a feasibility study in the swiss industry JJ Hunhevicz, T Schraner, DM Hall ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2020 | 30 | 2020 |
Common Data Environment within the AEC Ecosystem: moving collaborative platforms beyond the open versus closed dichotomy DF Bucher, DM Hall eg-ICE, 2020 | 30 | 2020 |