Holonic coordination obtained by joining the contract net protocol with constraint satisfaction D Panescu, C Pascal Computers in Industry 81, 36-46, 2016 | 20 | 2016 |
On a holonic adaptive plan-based architecture: planning scheme and holons’ life periods D Panescu, C Pascal The International Journal of Advanced Manufacturing Technology 63, 753-769, 2012 | 20 | 2012 |
On rescheduling in holonic manufacturing systems C Pascal, D Panescu Computers in Industry 104, 34-46, 2019 | 16 | 2019 |
A constraint satisfaction approach for planning of multi-robot systems D Panescu, C Pascal 2014 18th International Conference on System Theory, Control and Computing …, 2014 | 16 | 2014 |
On the design and implementation of holonic manufacturing systems D Panescu, M Sutu, C Pascal 2009 WRI World Congress on Computer Science and Information Engineering 5 …, 2009 | 16 | 2009 |
HAPBA–a holonic adaptive plan-based architecture D Panescu, C Pascal Service Orientation in Holonic and Multi-Agent Manufacturing Control, 61-74, 2012 | 15 | 2012 |
A petri net model for constraint satisfaction application in holonic systems C Pascal, D Panescu 2014 IEEE International Conference on Automation, Quality and Testing …, 2014 | 10 | 2014 |
HAPBA-A BDI agent based solution for holonic manufacturing execution systems C Pascal, D Panescu Service Orientation in Holonic and Multi Agent Manufacturing and Robotics, 57-70, 2013 | 10 | 2013 |
A Three-tier software architecture for manufacturing activity control in ERP concept S Dumbrava, D Panescu, M Costin International Conference on Computer Systems and Technologies-CompSysTech …, 2005 | 10 | 2005 |
On a class of multi-robot task allocation problems M Kloetzer, A Burlacu, D Panescu IFAC Proceedings Volumes 45 (6), 841-846, 2012 | 9 | 2012 |
Modeling a holonic agent based solution by Petri nets C Pascal, D Panescu Computer Science and Information Systems 9 (3), 1287-1305, 2012 | 9 | 2012 |
An extended contract net protocol with direct negotiation of managers D Panescu, C Pascal Service Orientation in Holonic and Multi-Agent Manufacturing and Robotics, 81-95, 2014 | 8 | 2014 |
Collaborative robotic system obtained by combining planning and holonic architecture D Panescu, C Pascal, M Sutu, G Varvara 2009 Advanced technologies for enhanced quality of life, 138-143, 2009 | 8 | 2009 |
On the design and implementation of the resource holons in a PROSA based architecture D Panescu, G Varvara, C Pascal, M Sutu 2009 International Conference on Intelligent Engineering Systems, 101-106, 2009 | 8 | 2009 |
On applying DisCSP for scheduling in holonic systems C Pascal, D Panescu 2016 20th International Conference on System Theory, Control and Computing …, 2016 | 7 | 2016 |
Some issues on holonic systems analysis, design and implementation D Panescu, C Pascal 19th International Workshop on Robotics in Alpe-Adria-Danube Region (RAAD …, 2010 | 7 | 2010 |
A colored Petri net model for DisCSP algorithms C Pascal, D Panescu Concurrency and Computation: Practice and Experience 29 (18), e4179, 2017 | 6 | 2017 |
The development of an FMS for CIM education D Pănescu, M Voicu, Ş Dumbravă, R Roşioru, G Porumb, C Brăescu, ... Preprints of SACCS2001, 2001 | 6 | 2001 |
About the applicability of IoT concept for classical manufacturing systems C Pascal, D Pănescu, C Dosoftei Service Oriented, Holonic and Multi-Agent Manufacturing Systems for Industry …, 2021 | 5 | 2021 |
On rescheduling in holonic manufacturing systems C Pascal, D Pănescu Service Orientation in Holonic and Multi-Agent Manufacturing: Proceedings of …, 2017 | 5 | 2017 |