关注
Tober Francom
Tober Francom
Project Manager - Pacific Gas & Electric Company
在 asu.edu 的电子邮件经过验证
标题
引用次数
引用次数
年份
Project quality and change performance differences associated with the use of building information modeling in design and construction projects: Univariate and multivariate …
TC Francom, M El Asmar
Journal of Construction Engineering and Management 141 (9), 04015028, 2015
432015
Performance analysis of construction manager at risk on pipeline engineering and construction projects
T Francom, M El Asmar, ST Ariaratnam
Journal of Management in Engineering 32 (6), 04016016, 2016
402016
Using alternative project delivery methods to enhance the cost performance of trenchless construction projects
T Francom, ME Asmar, ST Ariaratnam
Construction Research Congress 2014: Construction in a Global Network, 1219-1228, 2014
242014
Industry perceptions of alternative project delivery methods applied to trenchless pipeline projects
T Francom, ST Ariaratnam, M El Asmar
Journal of Pipeline Systems Engineering and Practice 7 (1), 04015020, 2016
222016
Principal component analysis to investigate the effect of BIM use on AEC project changes
TC Francom, M El Asmar
Computing in Civil and Building Engineering (2014), 159-166, 2014
62014
Performance of the construction manager at risk (CMAR) delivery method applied to pipeline construction projects
TC Francom
Arizona State University, 2015
52015
Cost performance of job order contracting (JOC) applied to wastewater pipeline engineering and construction projects
T Francom, ST Ariaratnam, ME Asmar
Pipelines 2016, 64-70, 2016
42016
Longitudinal study of construction manager at risk for pipeline rehabilitation
T Francom, M El Asmar, ST Ariaratnam
Journal of Pipeline Systems Engineering and Practice 8 (2), 04017001, 2017
32017
Assessing the impact of Building Information Modelling (BIM) on construction project performance
M El Asmar, T Francom
Proceedings of Creative Construction Conference, 6-9, 2013
32013
Identifying Geotechnical Risk and Assigning Ownership on Water and Wastewater Pipeline Projects Using Alternative Project Delivery Methods
T Francom, C Markham
Pipelines 2017, 494-503, 2017
22017
Industry perceptions of trenchless pipelines project performance when using alternative delivery systems
T Francom, ST Ariaratnam, M El Asmar
Pipelines 2014: From Underground to the Forefront of Innovation and …, 2014
22014
Improving Cost and Schedule Performance on Municipal Pipeline Projects: Realizing the Benefits of the Construction Manager at Risk (CMAR) Alternative Project Delivery Method
M El Asmar, ST Ariaratnam, T Francom
GeoStrata Magazine Archive 20 (4), 50-56, 2016
12016
Schedule Performance of Construction Manager at Risk (CMAR) Delivery on Pipeline Engineering and Construction Projects
T Francom, ME Asmar, ST Ariaratnam
Construction Research Congress 2016, 569-578, 2016
12016
Trenchless industry comfort level when using alternative delivery systems
T Francom, ST Ariaratnam, M El Asmar
ICPTT 2014: Creating Infrastructure for a Sustainable World, 217-226, 2014
2014
系统目前无法执行此操作,请稍后再试。
文章 1–14