A hybrid CAD-based construction site layout planning system using genetic algorithms HM Osman, ME Georgy, ME Ibrahim Automation in construction 12 (6), 749-764, 2003 | 203 | 2003 |
Shared leadership in project teams: An integrative multi-level conceptual model and research agenda CM Scott-Young, M Georgy, A Grisinger International Journal of Project Management 37 (4), 565-581, 2019 | 146 | 2019 |
Sustainable construction management: introduction of the operational context space (OCS) MM Matar, ME Georgy, ME Ibrahim Construction Management and Economics 26 (3), 261-275, 2008 | 145 | 2008 |
System dynamics approach for forecasting performance of construction projects H Leon, H Osman, M Georgy, M Elsaid Journal of Management in Engineering 34 (1), 04017049, 2018 | 137 | 2018 |
Evolutionary resource scheduler for linear projects ME Georgy Automation in Construction 17 (5), 573-583, 2008 | 117 | 2008 |
Causes of construction delays in countries with high geopolitical risks M Kadry, H Osman, M Georgy Journal of construction engineering and management 143 (2), 04016095, 2017 | 95 | 2017 |
Prediction of engineering performance: A neurofuzzy approach ME Georgy, LM Chang, L Zhang Journal of Construction Engineering and Management 131 (5), 548-557, 2005 | 90 | 2005 |
Utility-function model for engineering performance assessment ME Georgy, LM Chang, L Zhang Journal of Construction Engineering and Management 131 (5), 558-568, 2005 | 70 | 2005 |
Utilization of infrastructure gateway system (IGS) as a transportation infrastructure optimization tool K Gharehbaghi, M Georgy International Journal of Traffic and Transportation Engineering 4 (1), 8-15, 2015 | 34 | 2015 |
Using genetic algorithms in optimizing construction material delivery schedules M Georgy, SY Basily Construction Innovation 8 (1), 23-45, 2008 | 34 | 2008 |
Semantic risk assessment for ad hoc and amended standard forms of construction contracts A Youssef, H Osman, M Georgy, N Yehia Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2018 | 29 | 2018 |
Engineering performance in the US industrial construction sector ME Georgy, LM Chang, L Zhang Cost engineering 47 (1), 27, 2005 | 27 | 2005 |
A systems engineering approach for realizing sustainability in infrastructure projects M Matar, H Osman, M Georgy, A Abou-Zeid, M El-Said HBRC journal 13 (2), 190-201, 2017 | 26 | 2017 |
Preferred risk allocation in Egypt’s water sector PPPs R Rafaat, H Osman, M Georgy, M Elsaid International Journal of Construction Management 20 (6), 585-597, 2020 | 21 | 2020 |
Delay analysis methodologies used by engineering and construction firms in Egypt M Magdy, M Georgy, H Osman, M Elsaid Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2019 | 20 | 2019 |
Layout planning of construction sites considering multiple objectives: a goalprogramming approach HM Osman, ME Georgy Construction Research Congress 2005: Broadening Perspectives, 1-10, 2005 | 17 | 2005 |
Engineering productivity measurement LM Chang, GE Maged, L Zhang Construction Industry Institute, The University of Texas at Austin, 2001 | 17 | 2001 |
Engineering performance in industrial construction ME Georgy, LM Chang, KD Walsh Construction Congress VI: Building Together for a Better Tomorrow in an …, 2000 | 16 | 2000 |
Developing a BIM-oriented data model to enable sustainable construction in practice MM Matar, ME Georgy, AM Abou-Zeid Proceedings of the 8th European Conference on Product and Process Modelling …, 2010 | 15 | 2010 |
Composite high-rise structures: structural health monitoring (SHM) and case studies K Gharehbaghi, M Georgy, F Rahmani Materials Science Forum 940, 146-152, 2019 | 14 | 2019 |