关注
Rodrigo Romero-Silva
标题
引用次数
引用次数
年份
A note on defining organisational systems for contingency theory in OM
R Romero-Silva, J Santos, M Hurtado
Production Planning and Control 29 (16), 1343 - 1348, 2018
472018
Serial production line performance under random variation: Dealing with the ‘Law of Variability’
R Romero-Silva, E Marsillac, S Shaaban, M Hurtado-Hernández
Journal of Manufacturing Systems 50, 278-289, 2019
402019
Learning from the past to shape the future: A comprehensive text mining analysis of OR/MS reviews
R Romero-Silva, S De Leeuw
Omega 100, 102388, 2021
382021
Shop-floor scheduling as a competitive advantage: A study on the relevance of cyber-physical systems in different manufacturing contexts
R Romero-Silva, G Hernández-López
International Journal of Production Economics 224, 107555, 2020
362020
A framework for studying practical production scheduling
R Romero-Silva, J Santos, M Hurtado
Production Planning & Control 26 (6), 438-450, 2015
312015
Exploiting the characteristics of serial queues to reduce the mean and variance of flow time using combined priority rules
R Romero-Silva, S Shaaban, E Marsillac, M Hurtado
International Journal of Production Economics 196, 211-225, 2018
232018
Influence of unbalanced operation time means and uneven buffer allocation on unreliable merging assembly line efficiency
R Romero-Silva, S Shaaban
International Journal of Production Research 57 (6), 1645-1666, 2019
172019
A conceptual framework of the applicability of production scheduling from a contingency theory approach: addressing the theory-practice gap
R Romero-Silva, J Santos, M Hurtado-Hernández
Production Planning & Control 35 (3), 262-282, 2024
162024
Performance of merging lines with uneven buffer capacity allocation: the effects of unreliability under different inventory-related costs
S Shaaban, R Romero-Silva
Central European Journal of Operations Research, 1-36, 2020
122020
Trends and topics in IJPR from 1961 to 2017: a statistical history
R Romero-Silva, E Marsillac
International Journal of Production Research 57 (15-16), 4692-4718, 2019
122019
Trade-offs in the landside operations of air cargo hubs: Horizontal cooperation and shipment consolidation policies considering capacitated nodes
R Romero-Silva, MM Mota
Journal of Air Transport Management 103, 102253, 2022
112022
Is the scheduling task context-dependent? A survey investigating the presence of constraints in different manufacturing contexts
R Romero-Silva, M Hurtado, J Santos
Production Planning & Control 27 (9), 753-760, 2016
102016
The impact of unequal processing time variability on reliable and unreliable merging line performance
R Romero-Silva, S Shaaban, E Marsillac, Z Laarraf
International Journal of Production Economics 235, 108108, 2021
72021
Mapping operations research in project management: a bibliometric analysis
A Muñoz-Villamizar, EL Solano-Charris, R Romero-Silva
International Journal of Logistics Systems and Management 39 (1), 52-76, 2021
32021
Smartest Connected Cargo Airport Schiphol: Onderzoek naar innovaties die de logistieke prestaties van luchtvrachtketens op Schiphol versterken
T Verduijn, S Vunderink, A Bombelli, L Tavasszy, D van Damme, ...
Hogeschool van Amsterdam, Urban Technology, 2019
32019
Reducing the variability of inter-departure times of a single-server queueing system–The effects of skewness
R Romero-Silva, E Marsillac, S Shaaban, M Hurtado-Hernández
Computers & Industrial Engineering 135, 500-517, 2019
32019
Analysing the Decision-Rules for a Ground Delay Program: Mexican Airport Network
MM Mota, RR Silva
8th International Conference on Research in Air Transportation 2018, 2018
32018
The difference of mean waiting times between two classes of customers in a single-server FIFO queue: An experimental study
R Romero-Silva, M Hurtado
Cogent Engineering 4 (1), 1321082, 2017
32017
Teaching Theory of Constraints in 10 Hours using Open-Source Simulator
J Santos, RS Rodrigo, M Arcelus, A Errasti
International Journal of Information and Operations Management Education 4 …, 2011
32011
The effects of supply variability on the performance of assembly systems
R Romero-Silva, M Hurtado-Hernández
International Journal of Production Research 61 (15), 4973-4990, 2023
22023
系统目前无法执行此操作,请稍后再试。
文章 1–20