关注
MengChang WANG (王孟昌)
MengChang WANG (王孟昌)
Machine Intelligence Technology, Damo Academy, Alibaba Group
在 alibaba-inc.com 的电子邮件经过验证
标题
引用次数
引用次数
年份
Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
YQ Rao, MC Wang, KP Wang, TM Wu
Computers & Operations Research 40 (11), 2599-2610, 2013
572013
Job dispatch control for production lines with overlapped time window constraints
M Wang, S Srivathsan, E Huang, K Wu
IEEE Transactions on Semiconductor Manufacturing 31 (2), 206-214, 2018
162018
On Traffic Simulation Model of Container Terminals
Q ZHOU, M WANG, G YANG, L QIAN
Port & Waterway Engineering 2, 011, 2007
16*2007
Job scheduling of diffusion furnaces in semiconductor fabrication facilities
K Wu, E Huang, M Wang, M Zheng
European Journal of Operational Research 301 (1), 141-152, 2022
142022
Scheduling for an automated guided vehicle in flexible machine systems
MC WANG, Z Yaoming
Proceedings of the 2015 Winter Simulation Conference, 2908-2916, 2015
132015
CobBO: Coordinate backoff Bayesian optimization with two-stage kernels
J Tan, N Nayman, M Wang
arXiv preprint arXiv:2101.05147, 2021
92021
Analysis of a MAP/PH/1 queue with discretionary priority based on service stages
N Zhao, Z Lian, K Wu
Asia-Pacific Journal of Operational Research 32 (06), 1550042, 2015
82015
Modeling impact of choice complexity on production rate in mixed-model assembly system
K Wang, Y Rao, M Wang
The International Journal of Advanced Manufacturing Technology 59, 1181-1189, 2012
82012
A niche genetic algorithm for two-machine flowshop scheduling with family sequence-dependent setup times and a common due window
MC Wang, YQ Rao, KP Wang
2010 IEEE International Conference on Industrial Engineering and Engineering …, 2010
52010
Modeling impact of product variety on performance in mixed-model assembly system: an artificial neural network meta-modeling approach
Y Rao, K Wang, M Wang
2010 IEEE International Conference on Industrial Engineering and Engineering …, 2010
52010
集装箱码头堆场箱位动态分配优化策略研究
王孟昌
武汉: 武汉理工大学, 2007
52007
Mindopt tuner: Boost the performance of numerical software by automatic parameter tuning
M Zhang, W Yin, M Wang, Y Shen, P Xiang, Y Wu, L Zhao, J Pan, H Jiang, ...
arXiv preprint arXiv:2307.08085, 2023
42023
带有限中间缓冲区的多级并行机问题的求解
王炳刚, 饶运清, 邵新宇, 王孟昌
华中科技大学学报 (自然科学版) 37 (5), 86-89, 2009
32009
Scheduling mixed-model assembly lines with cost objectives by a hybrid algorithm
B Wang, Y Rao, X Shao, M Wang
Intelligent Robotics and Applications: First International Conference, ICIRA …, 2008
32008
Sequencing mixed-model assembly lines with limited intermediate buffers by a GA/SA-based algorithm
B Wang, Y Rao, X Shao, M Wang
Advanced Intelligent Computing Theories and Applications. With Aspects of …, 2008
22008
An Integer Variable Reduction and Neighborhood Search Cutting Plane Method for Security Constrained Unit Commitment
Q Ding, J Ye, M Wang, Y Zhang, C Lu, W Wang
2022 4th International Conference on Power and Energy Technology (ICPET …, 2022
12022
JIT single Vehicle scheduling in a mixed-model assembly line
YQ Rao, MC Wang, KP Wang
Advanced Materials Research 211, 770-774, 2011
12011
Research on Operations Optimization Method and Its Application in Mixed-Model Assembly-Fabrication Systems
MC Wang
Huazhong University of Science and Technology, 2013
2013
A Study on the Scheduling Problem in Two-Stage Convergent Mixed-Model Production Systems
YQ Rao, MC Wang, KP Wang
Advanced Science Letters 19 (11), 3428-3431, 2013
2013
系统目前无法执行此操作,请稍后再试。
文章 1–19