关注
Ali Ghodratnama
Ali Ghodratnama
Associate Prof., Department of Industrial Engineering, Faculty of Engineering, Kharazmi
在 khu.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
Soft computing based on new interval-valued fuzzy modified multi-criteria decision-making method
B Vahdani, R Tavakkoli-Moghaddam, SM Mousavi, A Ghodratnama
Applied Soft Computing 13 (1), 165-172, 2013
1112013
Robust and fuzzy goal programming optimization approaches for a novel multi-objective hub location-allocation problem: A supply chain overview
A Ghodratnama, R Tavakkoli-Moghaddam, A Azaron
Applied Soft Computing 37, 255-276, 2015
862015
Robot selection by a multiple criteria complex proportional assessment method under an interval-valued fuzzy environment
B Vahdani, SM Mousavi, R Tavakkoli-Moghaddam, A Ghodratnama, ...
The International Journal of Advanced Manufacturing Technology 73, 687-697, 2014
812014
The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem
R Tavakkoli-Moghaddam, B Javadi, F Jolai, A Ghodratnama
Applied soft computing 10 (3), 919-925, 2010
572010
Robust possibilistic programming for multi-item EOQ model with defective supply batches: Whale Optimization and Water Cycle Algorithms
S Khalilpourazari, SHR Pasandideh, A Ghodratnama
Neural computing and applications 31, 6587-6614, 2019
542019
Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing
A Ghodratnama, M Rabbani, R Tavakkoli-Moghaddam, A Baboli
Journal of Manufacturing Systems 29 (1), 1-9, 2010
532010
Solving a new multi-objective multi-route flexible flow line problem by multi-objective particle swarm optimization and NSGA-II
A Ghodratnama, F Jolai, R Tavakkoli-Moghaddam
Journal of Manufacturing Systems 36, 189-202, 2015
442015
A fuzzy possibilistic bi-objective hub covering problem considering production facilities, time horizons and transporter vehicles
A Ghodratnama, R Tavakkoli-Moghaddam, A Azaron
The International Journal of Advanced Manufacturing Technology 66, 187-206, 2013
442013
A simulated annealing method for solving a new mathematical model of a multi-criteria cell formation problem with capital constraints
R Tavakkoli-Moghaddam, AR Rahimi-Vahed, A Ghodratnama, A Siadat
Advances in Engineering Software 40 (4), 268-273, 2009
432009
A bi˗ objective hub location-allocation model considering congestion
A Ghodratnama, HR Arbabi, A Azaron
Operational Research 20, 2427-2466, 2020
262020
A new fuzzy tri-objective model for a home health care problem with green ambulance routing and congestion under uncertainty
F Ziya-Gorabi, A Ghodratnama, R Tavakkoli-Moghaddam, MS Asadi-Lari
Expert Systems with Applications 201, 117093, 2022
232022
Comparing three proposed meta-heuristics to solve a new p-hub location-allocation problem
A Baboli, A Ghodratnama, R Tavakkoli-Moghaddam
International Journal of Engineering 26 (9), 1043-1058, 2013
222013
A robust possibilistic programming approach for blood supply chain network design in disaster relief considering congestion
M Pouraliakbari-Mamaghani, A Ghodratnama, SHR Pasandideh, A Saif
Operational Research 22 (3), 1987-2032, 2022
202022
A multi-functional tri-objective mathematical model for the pharmaceutical supply chain considering congestion of drugs in factories
MS Fatemi, A Ghodratnama, R Tavakkoli-Moghaddam, A Kaboli
Research in Transportation Economics 92, 101094, 2022
172022
Design of multi-objective multi-product multi period green supply chain network with considering discount under uncertainty
J Ghahremani Nahr, A Ghodratnama, HR Izadbakhah, ...
Journal of Industrial Engineering Research in Production Systems 6 (13), 119-137, 2019
172019
Production planning in industrial townships modeled as hub location–allocation problems considering congestion in manufacturing plants
A Ghodratnama, HR Arbabi, A Azaron
Computers & industrial engineering 129, 479-501, 2019
162019
Designing pharmaceutical supply chain networks with perishable items considering congestion
S Rekabi, A Ghodratnama, A Azaron
Operational Research, 1-61, 2022
122022
Fuzzy inventory models with partial backordering for deteriorating items under stochastic inflationary conditions: Comparative comparison of the modeling methods
S Fathalizadeh, A Mirzazadeh, A Ghodratnama
Cogent Engineering 6 (1), 1648630, 2019
122019
Optimizing COVID-19 medical waste management using goal and robust possibilistic programming
H Karimi, N Wassan, B Ehsani, R Tavakkoli-Moghaddam, A Ghodratnama
Engineering Applications of Artificial Intelligence 131, 107838, 2024
112024
Optimizing a robust tri-objective multi-period reliable supply chain network considering queuing system and operational and disruption risks
V Nazari-Ghanbarloo, A Ghodratnama
Operational Research 21 (3), 1963-2020, 2021
112021
系统目前无法执行此操作,请稍后再试。
文章 1–20