What impacts the performance of large-scale government projects?
P Patanakul, YH Kwak, O Zwikael, M Liu
International journal of project management 34 (3), 452-466, 2016
1952016
Construction fatalities in Singapore
FYY Ling, M Liu, YC Woo
International Journal of Project Management 27 (7), 717-726, 2009
1912009
Work flow variation and labor productivity: Case study
M Liu, G Ballard, W Ibbs
Journal of management in engineering 27 (4), 236-242, 2011
1742011
Causes of variation in construction project task starting times and duration
BW Wambeke, SM Hsiang, M Liu
Journal of construction engineering and management 137 (9), 663-677, 2011
1562011
A comparative study on adopting human resource practices for safety management on construction projects in the United States and Singapore
DNC Lai, M Liu, FYY Ling
International journal of project management 29 (8), 1018-1032, 2011
1552011
Using neural network to predict performance of design-build projects in Singapore
FYY Ling, M Liu
Building and Environment 39 (10), 1263-1274, 2004
1492004
Modeling a contractor’s markup estimation
M Liu, YY Ling
Journal of construction engineering and management 131 (4), 391-399, 2005
1282005
Using Pajek and centrality analysis to identify a social network of construction trades
BW Wambeke, M Liu, SM Hsiang
Journal of construction engineering and management 138 (10), 1192-1201, 2012
1222012
Road Map for Lean Implementation at the Project Level
G Ballard, YW Kim, JW Jang, M Liu
The Construction Industry Institute 11, 234, 2007
1202007
Improving labor productivity through production control
M Liu, G Ballard
Proceedings of the 11th Annual Conference of International Group for Lean …, 2008
922008
Survey comparing critical path method, last planner system, and location-based techniques
H Olivieri, O Seppänen, TCL Alves, NM Scala, V Schiavone, M Liu, ...
Journal of construction engineering and management 145 (12), 04019077, 2019
682019
Improved measured mile analysis technique
W Ibbs, M Liu
Journal of construction engineering and management 131 (12), 1249-1256, 2005
672005
Cost-benefit analysis of construction information management system implementation: Case study
JL Vaughan, ML Leming, M Liu, E Jaselskis
Journal of Construction Engineering and Management 139 (4), 445-455, 2013
572013
Using fuzzy neural network approach to estimate contractors’ markup
M Liu, YY Ling
Building and Environment 38 (11), 1303-1308, 2003
532003
Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks
BW Wambeke, M Liu, SM Hsiang
Journal of Construction Engineering and Management 138 (4), 491-498, 2012
502012
Factors considered by successful and profitable contractors in mark-up size decision in Singapore
FYY Ling, M Liu
Building and environment 40 (11), 1557-1565, 2005
472005
Benefit of cooperation among subcontractors in performing high-reliable planning
A Javanmardi, SA Abbasian-Hosseini, M Liu, SM Hsiang
Journal of Management in Engineering 34 (2), 04017062, 2018
432018
Case studies of the allocation and reduction of time buffer through use of the last planner system
MM Russell, M Liu, G Howell, SM Hsiang
Journal of Construction Engineering and Management 141 (2), 04014068, 2015
422015
Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality
MM Russell, SM Hsiang, M Liu, B Wambeke
Journal of Construction Engineering and Management 140 (6), 04014016, 2014
422014
Preliminary engineering cost estimation model for bridge projects
DA Hollar, W Rasdorf, M Liu, JE Hummer, I Arocho, SM Hsiang
Journal of construction engineering and management 139 (9), 1259-1267, 2013
392013