关注
Salman Azhar
Salman Azhar
McWhorter School of Building Science, Auburn University, Auburn, Alabama, USA
在 auburn.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry
S Azhar
Leadership and management in engineering 11 (3), 241-252, 2011
37072011
Building information modeling (BIM): now and beyond
S Azhar, M Khalfan, T Maqsood
Australasian Journal of Construction Economics and Building, The 12 (4), 15-28, 2012
11872012
Building information modeling for sustainable design and LEED® rating analysis
S Azhar, WA Carlton, D Olsen, I Ahmad
Automation in construction 20 (2), 217-224, 2011
8912011
Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges
A Ghaffarianhoseini, J Tookey, A Ghaffarianhoseini, N Naismith, S Azhar, ...
Renewable and sustainable energy reviews 75, 1046-1053, 2017
8872017
Comparison of the strength and durability performance of normal-and high-strength pozzolanic concretes at elevated temperatures
CS Poon, S Azhar, M Anson, YL Wong
Cement and concrete research 31 (9), 1291-1300, 2001
6002001
Building Information Modeling (BIM): A new paradigm for visual interactive modeling and simulation for construction projects
S Azhar, A Nadeem, JYN Mok, BHY Leung
Proc., First International Conference on Construction in Developing …, 2008
5862008
BIM for sustainability analyses
S Azhar, J Brown
International Journal of Construction Education and Research 5 (4), 276-292, 2009
5412009
Performance of metakaolin concrete at elevated temperatures
CS Poon, S Azhar, M Anson, YL Wong
Cement and concrete composites 25 (1), 83-89, 2003
3272003
Strength and durability recovery of fire-damaged concrete after post-fire-curing
CS Poon, S Azhar, M Anson, YL Wong
Cement and concrete research 31 (9), 1307-1318, 2001
3152001
Delays in construction: a brief study of the Florida construction industry
SM Ahmed, S Azhar, P Kappagntula, D Gollapudil
Proceedings of the 39th Annual ASC Conference, Clemson University, Clemson …, 2003
2732003
Construction delays in Florida: An empirical study
SM Ahmed, S Azhar, M Castillo, P Kappagantula
Final report. Department of Community Affairs, Florida, US, 2002
2292002
CoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces
Z Riaz, M Arslan, AK Kiani, S Azhar
Automation in construction 45, 96-106, 2014
2222014
Action research as a proactive research method for construction engineering and management
S Azhar, I Ahmad, MK Sein
Journal of construction engineering and management 136 (1), 87-98, 2010
2002010
Role of visualization technologies in safety planning and management at construction jobsites
S Azhar
Procedia engineering 171, 215-226, 2017
1352017
Using Building Information Modelling to achieve Lean principles by improving efficiency of work teams
X Zhang, S Azhar, A Nadeem, M Khalfan
International Journal of Construction Management 18 (4), 293-300, 2018
1182018
A case study of building performance analyses using building information modeling
S Azhar, JW Brown, A Sattineni
Editor no identificado, 2014
1122014
Development of a decision support system using data warehousing to assist builders/developers in site selection
I Ahmad, S Azhar, P Lukauskis
Automation in construction 13 (4), 525-542, 2004
1082004
Real-time environmental monitoring, visualization, and notification system for construction H&S management
A Kiani, A Salman, Z Riaz
Journal of Information Technology in Construction 19, 72-91, 2014
1042014
A multi-criteria decision-making framework for building sustainability assessment in Kazakhstan
G Akhanova, A Nadeem, JR Kim, S Azhar
Sustainable Cities and Society 52, 101842, 2020
952020
A framework for a BIM-based knowledge management system
A Deshpande, S Azhar, S Amireddy
Procedia Engineering 85, 113-122, 2014
922014
系统目前无法执行此操作,请稍后再试。
文章 1–20