A Lagrangian heuristic for satellite range scheduling with resource constraints F Marinelli, S Nocella, F Rossi, S Smriglio Computers & Operations Research 38 (11), 1572-1583, 2011 | 200 | 2011 |
Orbital branching J Ostrowski, J Linderoth, F Rossi, S Smriglio Mathematical Programming 126, 147-178, 2011 | 174 | 2011 |
Scheduling of flexible flow lines in an automobile assembly plant A Agnetis, A Pacifici, F Rossi, M Lucertini, S Nicoletti, F Nicolo, G Oriolo, ... European Journal of Operational Research 97 (2), 348-362, 1997 | 105 | 1997 |
A branch-and-cut algorithm for the maximum cardinality stable set problem F Rossi, S Smriglio Operations Research Letters 28 (2), 63-74, 2001 | 77 | 2001 |
Staffing and scheduling flexible call centers by two-stage robust optimization S Mattia, F Rossi, M Servilio, S Smriglio Omega 72, 25-37, 2017 | 56 | 2017 |
Constraint orbital branching J Ostrowski, J Linderoth, F Rossi, S Smriglio Integer Programming and Combinatorial Optimization: 13th International …, 2008 | 54 | 2008 |
Orbital branching J Ostrowski, J Linderoth, F Rossi, S Smriglio Integer Programming and Combinatorial Optimization, 104-118, 2007 | 53 | 2007 |
The network packing problem in terrestrial broadcasting C Mannino, F Rossi, S Smriglio Operations Research 54 (4), 611-626, 2006 | 46 | 2006 |
A set packing model for the ground holding problem in congested networks F Rossi, S Smriglio European Journal of Operational Research 131 (2), 400-416, 2001 | 45 | 2001 |
Cutting and reuse: an application from automobile component manufacturing C Arbib, F Marinelli, F Rossi, F Di Iorio Operations Research 50 (6), 923-934, 2002 | 43 | 2002 |
Optimal resource assignment through negotiation in a multi-agent manufacturing system C Arbib, F Rossi Iie Transactions 32 (10), 963-974, 2000 | 40 | 2000 |
Batch scheduling in a two-machine flow shop with limited buffer A Agnetis, D Pacciarelli, F Rossi Discrete Applied Mathematics 72 (3), 243-260, 1997 | 35 | 1997 |
Solving large Steiner triple covering problems J Ostrowski, J Linderoth, F Rossi, S Smriglio Operations Research Letters 39 (2), 127-131, 2011 | 29 | 2011 |
Models and algorithms for terrestrial digital broadcasting F Rossi, S Smriglio, A Sassano Annals of Operations Research 107, 267-283, 2001 | 28 | 2001 |
An application of the Lovász–Schrijver M(K, K) operator to the stable set problem M Giandomenico, AN Letchford, F Rossi, S Smriglio Mathematical programming 120, 381-401, 2009 | 26 | 2009 |
Strong lift-and-project cutting planes for the stable set problem M Giandomenico, F Rossi, S Smriglio Mathematical Programming 141, 165-192, 2013 | 24 | 2013 |
Lot scheduling in a two-machine cell with swapping devices A Agnetis, D Pacciarelli, F Rossi IIE transactions 28 (11), 911-917, 1996 | 20 | 1996 |
An exact algorithm for the batch sequencing problem in a two‐machine flow shop with limited buffer A Agnetis, F Rossi, G Gristina Naval Research Logistics (NRL) 45 (2), 141-164, 1998 | 17 | 1998 |
A new approach to the stable set problem based on ellipsoids M Giandomenico, AN Letchford, F Rossi, S Smriglio Integer Programming and Combinatoral Optimization: 15th International …, 2011 | 15 | 2011 |
The stable set problem: Clique and nodal inequalities revisited AN Letchford, F Rossi, S Smriglio Computers & Operations Research 123, 105024, 2020 | 14 | 2020 |