关注
Ali Hasani
Ali Hasani
MSc of industrial management, Shahrood University of Technology
在 shahroodut.ac.ir 的电子邮件经过验证
标题
引用次数
引用次数
年份
A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: Trade-off between production costs and energy consumption
A Hasani, SMH Hosseini
Applied Mathematics and Computation 386, 125533, 2020
462020
Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
A Hasani, SMH Hosseini
Computers & Operations Research 138, 105625, 2022
82022
Scheduling in a flexible flow shop with unrelated parallel machines and machine-dependent process stages: Trade-off between Makespan and production costs
A Hasani, SMH Hosseini, SS Sana
Sustainability Analytics and Modeling 2, 100010, 2022
72022
Minimizing the operational costs in a flexible flow shop scheduling problem with unrelated parallel machines
A Hassani, SMH Hosseini, F Behroozi
Journal of Optimization in Industrial Engineering 14 (1), 169-184, 2021
52021
زمانبندی سبز در محیط جریان کارگاهی انعطاف‌پذیر با مراحل پردازش وابسته به ماشین، محدودیت دسترسی به ماشین‌ها و درنظر گرفتن زمان ترخیص کارها
حسنی, حسینی, سید محمد حسن
مجله تحقیق در عملیات در کاربردهای آن (ریاضی کاربردی)-دانشگاه آزاد لاهیجان …, 2023
2023
Green Scheduling in Flexible Flow Shop with Machine-Dependent Processing Stages, Machines Eligibility, and Release Time
A Hasani, SMH Hosseini
Journal of Operational Research In Its Applications (Applied Mathematics …, 2023
2023
Applying data envelopment analysis (DEA) technique to solve job rotation problem by considering ergonomic risks and evaluating optimal responses
SMH Hosseini, A Hasani, S Sedghi
International Conference on Decision and Data Envelopment Analysis 14, 2022
2022
Modelling and solving the flexible flow shop scheduling problem with unrelated parallel machines with the approach of reducing the operational costs
A Hasani
Shahroud University of Technology, 2020
2020
系统目前无法执行此操作,请稍后再试。
文章 1–8