关注
Kunhee Choi (KC)
Kunhee Choi (KC)
Endowed Cecil O. Windsor Jr. ‘66 Professor
在 tamu.edu 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Quantitative analysis of warnings in building information modeling (BIM)
HW Lee, H Oh, Y Kim, K Choi
Automation in Construction 51, 23-31, 2015
662015
Social influence on construction safety behaviors: A multi-user virtual reality experiment
Y Shi, J Du, E Ragan, K Choi, S Ma
Construction research congress 2018, 174-183, 2018
542018
Decision support model for incentives/disincentives time–cost tradeoff
K Choi, YH Kwak
Automation in Construction 21, 219-228, 2012
542012
Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects
K Choi, YH Kwak, JH Pyeon, K Son
Journal of construction engineering and management 138 (3), 323-330, 2012
442012
Time-cost performance effect of change orders from accelerated contract provisions
K Choi, HW Lee, J Bae, D Bilbo
Journal of Construction Engineering and Management 142 (3), 04015085, 2016
392016
Project risk factors facing construction management firms
K Park, HW Lee, K Choi, SH Lee
International Journal of Civil Engineering 17 (3), 305-321, 2019
372019
Macroeconomic labour productivity and its impact on firm's profitability
K Choi, M Haque, HW Lee, YK Cho, YH Kwak
Journal of the Operational Research Society 64 (8), 1258-1268, 2013
372013
Environmental, economic, and social implications of highway concrete rehabilitation alternatives
K Choi, HW Lee, Z Mao, S Lavy, BY Ryoo
Journal of Construction Engineering and Management 142 (2), 04015079, 2016
362016
Structural design and lifecycle assessment of heated pavement using conductive asphalt
Y Rew, X Shi, K Choi, P Park
Journal of Infrastructure Systems 24 (3), 04018019, 2018
352018
Real options valuation of phased investments in commercial energy retrofits under building performance risks
HW Lee, K Choi, JA Gambatese
Journal of Construction Engineering and Management 140 (6), 05014004, 2014
302014
A case study of activity‐based costing in allocating rebar fabrication costs to projects
YW Kim, S Han, S Shin, K Choi
Construction Management and Economics 29 (5), 449-461, 2011
302011
Quantitative model for determining incentive/disincentive amounts through schedule simulations
K Choi, YH Kwak, B Yu
Proceedings of the 2010 Winter Simulation Conference, 3295-3306, 2010
262010
PACPIM: New decision-support model of optimized portfolio analysis for community-based photovoltaic investment
M Shakouria, HW Lee, K Choi
Applied Energy 156 (15 October 2015), 607-617, 2015
252015
Streamlined strategies for faster, less traffic-disruptive highway rehabilitation in urban networks
EB Lee, K Choi, S Lim
Transportation Research Record 2081 (1), 38-45, 2008
252008
Determining future maintenance costs of low-volume highway rehabilitation projects for incorporation into life-cycle cost analysis
K Choi, YH Kim, J Bae, HW Lee
Journal of computing in civil engineering 30 (4), 04015055, 2016
242016
Multicontextual machine-learning approach to modeling traffic impact of urban highway work zones
J Bae, K Choi, JH Oh
Transportation Research Record 2645 (1), 184-194, 2017
202017
Effective project scoping practices to improve on-time and on-budget delivery of highway projects
S Anderson, C Quiroga, J Overman, K Choi, J Sahu, S Kermanshachi, ...
NCHRP Report, 2016
202016
Effectiveness study of methods for removing temporary pavement markings in roadway construction zones
Y Cho, K Kabassi, JH Pyeon, K Choi, C Wang, T Norton
Journal of construction engineering and management 139 (3), 257-266, 2013
202013
Effects of front-end planning under fast-tracked project delivery systems for industrial projects
J Sindhu, K Choi, S Lavy, ZK Rybkowski, BF Bigelow, W Li
International Journal of Construction Education and Research 14 (3), 163-178, 2018
182018
Holistic performance evaluation of highway design-build projects
K Choi, I Jung, Y Yin, C Gurganus, HD Jeong
Journal of management in Engineering 36 (4), 04020024, 2020
172020
系统目前无法执行此操作,请稍后再试。
文章 1–20