A synergetic model for implementing an integrated management system: an empirical study in China SX Zeng, JJ Shi, GX Lou Journal of cleaner production 15 (18), 1760-1767, 2007 | 610 | 2007 |
The relationship between corporate environmental performance and environmental disclosure: An empirical study in China XH Meng, SX Zeng, JJ Shi, GY Qi, ZB Zhang Journal of environmental management 145, 357-367, 2014 | 285 | 2014 |
Construction delay computation method JJ Shi, SO Cheung, D Arditi Journal of construction engineering and management 127 (1), 60-65, 2001 | 196 | 2001 |
Modular neural networks for predicting settlements during tunneling J Shi, JAR Ortigao, J Bai Journal of Geotechnical and Geoenvironmental Engineering 124 (5), 389-395, 1998 | 180 | 1998 |
Implementing integration of ISO 9001 and ISO 14001 for construction SX Zeng, P Tian, JJ Shi Managerial Auditing Journal 20 (4), 394-407, 2005 | 176 | 2005 |
The societal governance of megaproject social responsibility H Ma, S Zeng, H Lin, H Chen, JJ Shi International Journal of Project Management 35 (7), 1365-1377, 2017 | 175 | 2017 |
Revisiting the relationship between environmental and financial performance in Chinese industry GY Qi, SX Zeng, JJ Shi, XH Meng, H Lin, QX Yang Journal of environmental management 145, 349-356, 2014 | 173 | 2014 |
The impact of corporate environmental violation on shareholders' wealth: A perspective taken from media coverage XD Xu, SX Zeng, HL Zou, JJ Shi Business Strategy and the Environment 25 (2), 73-91, 2016 | 160 | 2016 |
Activity-based construction (ABC) modeling and simulation method JJ Shi Journal of construction engineering and management 125 (5), 354-360, 1999 | 160 | 1999 |
Enterprise resource planning for construction business management JJ Shi, DW Halpin Journal of construction engineering and management 129 (2), 214-221, 2003 | 152 | 2003 |
Resource-based modeling for construction simulation J Shi, SM AbouRizk Journal of construction engineering and management 123 (1), 26-33, 1997 | 137 | 1997 |
Reducing prediction error by transforming input data for neural networks JJ Shi Journal of computing in civil engineering 14 (2), 109-116, 2000 | 118 | 2000 |
How do environmental violation events harm corporate reputation? HL Zou, RC Zeng, SX Zeng, JJ Shi Business Strategy and the Environment 24 (8), 836-854, 2015 | 114 | 2015 |
Multi-criteria building energy performance benchmarking through variable clustering based compromise TOPSIS with objective entropy weighting E Wang, N Alp, J Shi, C Wang, X Zhang, H Chen Energy 125, 197-210, 2017 | 111 | 2017 |
A neural network based system for predicting earthmoving production JJ Shi Construction Management & Economics 17 (4), 463-471, 1999 | 102 | 1999 |
A project-oriented data warehouse for construction T Rujirayanyong, JJ Shi Automation in Construction 15 (6), 800-807, 2006 | 90 | 2006 |
Automated construction-simulation optimization S AbouRizk, J Shi Journal of Construction Engineering and Management 120 (2), 374-385, 1994 | 88 | 1994 |
Feasibility study of a localized residential grey water energy-recovery system L Ni, SK Lau, H Li, T Zhang, JS Stansbury, J Shi, J Neal Applied Thermal Engineering 39, 53-62, 2012 | 83 | 2012 |
Application of fuzzy logic to simulation for construction operations H Zhang, CM Tam, JJ Shi Journal of computing in civil engineering 17 (1), 38-45, 2003 | 75 | 2003 |
Intelligent identification for rock-mineral microscopic images using ensemble machine learning algorithms Y Zhang, M Li, S Han, Q Ren, J Shi Sensors 19 (18), 3914, 2019 | 71 | 2019 |