关注
Long-Wen Zhang
Long-Wen Zhang
Hunan Agricultural University
在 hunau.edu.cn 的电子邮件经过验证
标题
引用次数
引用次数
年份
Seismic fragility analysis of nuclear power plants considering structural parameter uncertainty
YG Zhao, MJ Qin, ZH Lu, LW Zhang
Reliability Engineering & System Safety 216, 107970, 2021
392021
Seismic fragility analysis of bridge piers using methods of moment
LW Zhang, ZH Lu, C Chen
Soil dynamics and earthquake engineering 134, 106150, 2020
212020
Dynamic reliability assessment of nonlinear structures using extreme value distribution based on L-moments
LW Zhang, ZH Lu, YG Zhao
Mechanical Systems and Signal Processing 159, 107832, 2021
182021
An improved fourth-order moment reliability method for strongly skewed distributions
LW Zhang
Structural and Multidisciplinary Optimization 62 (3), 1213-1225, 2020
132020
An efficient method for accessing structural reliability indexes via power transformation family
LW Zhang, C Dang, YG Zhao
Reliability Engineering & System Safety 233, 109097, 2023
92023
First passage probability assessment of stationary non-Gaussian process using the third-order polynomial transformation
YG Zhao, LW Zhang, ZH Lu, J He
Advances in Structural Engineering 22 (1), 187-201, 2019
92019
基于高阶矩法的 CRTS Ⅱ 型轨道板抗裂可靠度
张龙文, 周劲
中山大学学报 (自然科学版) 59 (3), 134-142, 2020
32020
Linear Moments-based Monte Carlo Simulation for Reliability Analysis with Unknown Probability Distributions
LW Zhang, YG Zhao
ASCE-ASME J Risk and Uncert in Engrg Sys Part B Mech Engrg 10 (2), 021103 …, 2024
12024
HUT‐based method for structural reliability considering the non‐normal and unknown distributions
LW Zhang, YG Zhao
Quality and Reliability Engineering International 38 (5), 2303-2323, 2022
12022
Time-dependent Reliability Analysis of Bending Resistance of Aqueduct Side Wall by Combining BP Neural Network and High-order Moment Method.
Z Long-wen, Z Lun-xiu, LIU Qian
China Rural Water & Hydropower, 2024
2024
L-Moments-Based FORM Method for Structural Reliability Analysis Considering Correlated Input Random Variables
ZP Li, DZ Hu, LW Zhang, Z Zhang, Y Shi
Buildings 13 (5), 1261, 2023
2023
基于结构响应极值前四阶矩的桥墩抗震可靠度
张龙文, 卢朝辉
振动与冲击, 2020
2020
基于随机函数-谱表示的高阶矩结构动力可靠度分析方法
张龙文, 卢朝辉
振动工程学报 33 (2), 265-275, 2020
2020
硬化非高斯结构响应首次穿越的 Monte Carlo 模拟
张龙文, 卢朝辉, 何军, 赵衍刚
湖南大学学报 (自然科学版) 中文版 45 (5), 109-116, 2018
2018
Monte Carlo Simulation for First Passage of Hardening Structural Responses
张龙文, 卢朝辉, 何军, 赵衍刚
Journal of Hunan University 45 (5), 109-116, 2018
2018
基于平稳非高斯结构响应前四阶矩的首次穿越概率计算
张龙文, 卢朝辉, 赵衍刚
振动与冲击 37 (1), 128-135, 2018
2018
硬化非高斯模型及其在首次穿越中的应用
张龙文, 李志鹏, 何军, 卢朝辉
华中科技大学学报 (自然科学版) 46 (1), 87-91, 2018
2018
地震加速度时程合成方法研究
张龙文
南昌航空大学, 2013
2013
基于拟合目标反应谱法的时程特征参数比较分析
钟菊芳, 张龙文
南昌航空大学学报: 自然科学版 26 (4), 1-7, 2012
2012
系统目前无法执行此操作,请稍后再试。
文章 1–19