关注
Nasser Mebarki
Nasser Mebarki
Professeur Génie Informatique, Université de Nantes
在 univ-nantes.fr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Using multi-agent architecture in FMS for dynamic scheduling
K Kouiss, H Pierreval, N Mebarki
Journal of intelligent Manufacturing 8, 41-47, 1997
2241997
Dynamic scheduling selection of dispatching rules for manufacturing system
H Pierreval, N Mebarki
International Journal of Production Research 35 (6), 1575-1591, 1997
1491997
Data mining based job dispatching using hybrid simulation-optimization approach for shop scheduling problem
A Shahzad, N Mebarki
Engineering Applications of Artificial Intelligence 25 (6), 1173-1181, 2012
892012
Learning dispatching rules for scheduling: A synergistic view comprising decision trees, tabu search and simulation
A Shahzad, N Mebarki
Computers 5 (1), 3, 2016
502016
Modeling and simulation of the control framework on a flexible manufacturing system
C Gertosio, N Mebarki, A Dussauchoy
International Journal of Production Economics 64 (1-3), 285-293, 2000
432000
A study of the robustness of the group scheduling method using an emulation of a complex FMS
O Cardin, N Mebarki, G Pinot
International Journal of Production Economics 146 (1), 199-207, 2013
282013
L’assistance à l’opérateur humain pour l’ordonnancement dans les ateliers manufacturiers
JM Hoc, N Mebarki, J Cegarra
Le travail humain 672 (2), 181-208, 2004
272004
Discovering dispatching rules for job shop scheduling problem through data mining
A Shahzad, N Mebarki, I IRCCyN
8th International Conference of Modeling and Simulation-MOSIM 10, 2010
262010
A classification for reconfigurable manufacturing systems
E Capawa Fotsoh, N Mebarki, P Castagna, P Berruet
Reconfigurable Manufacturing Systems: From Design to Implementation, 11-28, 2020
192020
Design of scheduling algorithms: Applications
J Riezebos, JM Hoc, N Mebarki, C Dimopoulos, W Van Wezel, G Pinot
Behavioral operations in planning and scheduling, 371-412, 2011
182011
Best-case lower bounds in a group sequence for the job shop problem
G Pinot, N Mebarki
IFAC Proceedings Volumes 41 (2), 14876-14881, 2008
182008
The nature of expertise in scheduling: the case of timetabling
JM Hoc, C Guerin, N Mebarki
Human Factors and Ergonomics in Manufacturing & Service Industries 24 (2 …, 2014
162014
Robust machine scheduling based on group of permutable jobs
C Artigues, JC Billaut, A Cheref, N Mebarki, Z Yahouni
Robustness Analysis in Decision Aiding, Optimization, and Analytics, 191-220, 2016
132016
Couplage entre des Méthodes d'optimisation itératives et des modèles de simulation à évenements discrets
M Ouabiba, N Mebarki, P Castagna
3 ème Conférence Francophone de MOdélisation et SIMulation «Conception …, 2001
122001
An approach based on Hotelling’s test for multicriteria stochastic simulation–optimization
N Mebarki, P Castagna
Simulation Practice and Theory 8 (5), 341-355, 2000
122000
Une approche multi agents pour l'ordonnancement dynamique d'un système de production flexible
N Mebarki, H Pierreval, K Kouiss
Revue des Sciences et Technologies de l'Information-Série ISI: Ingénierie …, 1996
121996
Industry 4.0 and service companies: The case of the french postal service
C Selma, D Tamzalit, N Mebarki, O Cardin, L Bruggeman, D Thiériot
Service Orientation in Holonic and Multi-Agent Manufacturing: Proceedings of …, 2019
112019
Apport de la simulation comme outil d'aide au pilotage des systemes de production-Exemples d'application
P Castagna, N Mebarki, R Gauduel
Conception, analyse et gestion des sytèmes industriels (Troyes, 25-27 avril …, 2001
112001
Towards the Use of a Multi-Agent Approach to the Schediuling of Flexible Manufacturing Systems
K Kouiss, H Pierreval, N Mebarki
Proc. IEPM’93 International Conference on Industrial Engineering and …, 1995
111995
Correlation among tardiness-based measures for scheduling using priority dispatching rules
N Mebarki, A Shahzad
International Journal of Production Research 51 (12), 3688-3697, 2013
102013
系统目前无法执行此操作,请稍后再试。
文章 1–20