Using multi-agent architecture in FMS for dynamic scheduling K Kouiss, H Pierreval, N Mebarki Journal of intelligent Manufacturing 8, 41-47, 1997 | 224 | 1997 |
Dynamic scheduling selection of dispatching rules for manufacturing system H Pierreval, N Mebarki International Journal of Production Research 35 (6), 1575-1591, 1997 | 149 | 1997 |
Data mining based job dispatching using hybrid simulation-optimization approach for shop scheduling problem A Shahzad, N Mebarki Engineering Applications of Artificial Intelligence 25 (6), 1173-1181, 2012 | 89 | 2012 |
Learning dispatching rules for scheduling: A synergistic view comprising decision trees, tabu search and simulation A Shahzad, N Mebarki Computers 5 (1), 3, 2016 | 50 | 2016 |
Modeling and simulation of the control framework on a flexible manufacturing system C Gertosio, N Mebarki, A Dussauchoy International Journal of Production Economics 64 (1-3), 285-293, 2000 | 43 | 2000 |
A study of the robustness of the group scheduling method using an emulation of a complex FMS O Cardin, N Mebarki, G Pinot International Journal of Production Economics 146 (1), 199-207, 2013 | 28 | 2013 |
L’assistance à l’opérateur humain pour l’ordonnancement dans les ateliers manufacturiers JM Hoc, N Mebarki, J Cegarra Le travail humain 672 (2), 181-208, 2004 | 27 | 2004 |
Discovering dispatching rules for job shop scheduling problem through data mining A Shahzad, N Mebarki, I IRCCyN 8th International Conference of Modeling and Simulation-MOSIM 10, 2010 | 26 | 2010 |
A classification for reconfigurable manufacturing systems E Capawa Fotsoh, N Mebarki, P Castagna, P Berruet Reconfigurable Manufacturing Systems: From Design to Implementation, 11-28, 2020 | 19 | 2020 |
Design of scheduling algorithms: Applications J Riezebos, JM Hoc, N Mebarki, C Dimopoulos, W Van Wezel, G Pinot Behavioral operations in planning and scheduling, 371-412, 2011 | 18 | 2011 |
Best-case lower bounds in a group sequence for the job shop problem G Pinot, N Mebarki IFAC Proceedings Volumes 41 (2), 14876-14881, 2008 | 18 | 2008 |
The nature of expertise in scheduling: the case of timetabling JM Hoc, C Guerin, N Mebarki Human Factors and Ergonomics in Manufacturing & Service Industries 24 (2 …, 2014 | 16 | 2014 |
Robust machine scheduling based on group of permutable jobs C Artigues, JC Billaut, A Cheref, N Mebarki, Z Yahouni Robustness Analysis in Decision Aiding, Optimization, and Analytics, 191-220, 2016 | 13 | 2016 |
Couplage entre des Méthodes d'optimisation itératives et des modèles de simulation à évenements discrets M Ouabiba, N Mebarki, P Castagna 3 ème Conférence Francophone de MOdélisation et SIMulation «Conception …, 2001 | 12 | 2001 |
An approach based on Hotelling’s test for multicriteria stochastic simulation–optimization N Mebarki, P Castagna Simulation Practice and Theory 8 (5), 341-355, 2000 | 12 | 2000 |
Une approche multi agents pour l'ordonnancement dynamique d'un système de production flexible N Mebarki, H Pierreval, K Kouiss Revue des Sciences et Technologies de l'Information-Série ISI: Ingénierie …, 1996 | 12 | 1996 |
Industry 4.0 and service companies: The case of the french postal service C Selma, D Tamzalit, N Mebarki, O Cardin, L Bruggeman, D Thiériot Service Orientation in Holonic and Multi-Agent Manufacturing: Proceedings of …, 2019 | 11 | 2019 |
Apport de la simulation comme outil d'aide au pilotage des systemes de production-Exemples d'application P Castagna, N Mebarki, R Gauduel Conception, analyse et gestion des sytèmes industriels (Troyes, 25-27 avril …, 2001 | 11 | 2001 |
Towards the Use of a Multi-Agent Approach to the Schediuling of Flexible Manufacturing Systems K Kouiss, H Pierreval, N Mebarki Proc. IEPM’93 International Conference on Industrial Engineering and …, 1995 | 11 | 1995 |
Correlation among tardiness-based measures for scheduling using priority dispatching rules N Mebarki, A Shahzad International Journal of Production Research 51 (12), 3688-3697, 2013 | 10 | 2013 |