Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm J Behnamian, M Zandieh, SMTF Ghomi Expert Systems with Applications 36 (6), 9637-9644, 2009 | 177 | 2009 |
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic J Behnamian, SMT Ghomi Expert Systems with Applications 36 (8), 11057-11069, 2009 | 171 | 2009 |
A survey of multi-factory scheduling J Behnamian, SMT Fatemi Ghomi Journal of Intelligent Manufacturing 27, 231-249, 2016 | 158 | 2016 |
A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties J Behnamian, M Zandieh Expert Systems with Applications 38 (12), 14490-14498, 2011 | 132 | 2011 |
Hybrid flowshop scheduling with machine and resource-dependent processing times J Behnamian, SMTF Ghomi Applied Mathematical Modelling 35 (3), 1107-1123, 2011 | 122 | 2011 |
Development of a PSO–SA hybrid metaheuristic for a new comprehensive regression model to time-series forecasting J Behnamian, SMTF Ghomi Expert Systems with applications 37 (2), 974-984, 2010 | 115 | 2010 |
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine J Behnamian, SMTF Ghomi Information Sciences 219, 181-196, 2013 | 97 | 2013 |
Decomposition based hybrid VNS–TS algorithm for distributed parallel factories scheduling with virtual corporation J Behnamian Computers & Operations Research 52, 181-191, 2014 | 64 | 2014 |
Multi-objective fuzzy multiprocessor flowshop scheduling J Behnamian, SMTF Ghomi Applied soft computing 21, 139-148, 2014 | 59 | 2014 |
Survey on fuzzy shop scheduling J Behnamian Fuzzy Optimization and Decision Making 15 (3), 331–366, 2016 | 53 | 2016 |
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times J Behnamian, SMT Fatemi Ghomi, M Zandieh International Journal of Production Research 48 (5), 1415-1438, 2010 | 52 | 2010 |
Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration M Bank, SMTF Ghomi, F Jolai, J Behnamian Advances in Engineering Software 47 (1), 1-6, 2012 | 49 | 2012 |
Lagrangian heuristic algorithm for green multi-product production routing problem with reverse logistics and remanufacturing A Parchami Afra, J Behnamian Journal of Manufacturing Systems 58, 33-43, 2021 | 45 | 2021 |
Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm J Behnamian, SMTF Ghomi, F Jolai, O Amirtaheri Applied soft computing 12 (2), 768-777, 2012 | 45 | 2012 |
Earliness and tardiness minimizing on a realistic hybrid flowshop scheduling with learning effect by advanced metaheuristic J Behnamian, M Zandieh Arabian Journal for Science and Engineering 38, 1229-1242, 2013 | 39 | 2013 |
Due windows group scheduling using an effective hybrid optimization approach J Behnamian, M Zandieh, SMT Fatemi Ghomi The International Journal of Advanced Manufacturing Technology 46, 721-735, 2010 | 39 | 2010 |
Storage System Layout ( in Facility location: concepts, models, algorithms and case studies) J Behnamian, B Eghtedari Springer Science & Business Media, 2009 | 39* | 2009 |
Multi-objective Green Flowshop Scheduling Problem under Uncertainty: Estimation of Distribution Algorithm M Faraji Amiri, J Behnamian Journal of Cleaner Production, 119734, 2020 | 35 | 2020 |
Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms J Behnamian, M Zandieh, SMT Fatemi Ghomi The International Journal of Advanced Manufacturing Technology 44, 795-808, 2009 | 35 | 2009 |
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling J Behnamian, M Zandieh, SMT Fatemi Ghomi International Journal of Production Research 48 (17), 4949-4976, 2010 | 32 | 2010 |