关注
Pierre NANCEL-PENARD
Pierre NANCEL-PENARD
其他姓名Nancel Penard
在 amtc.uchile.cl 的电子邮件经过验证
标题
引用次数
引用次数
年份
Aggregation heuristic for the open-pit block scheduling problem
E Jélvez, N Morales, P Nancel-Penard, J Peypouquet, P Reyes
European Journal of Operational Research 249 (3), 1169-1177, 2016
952016
A new hybrid heuristic algorithm for the precedence constrained production scheduling problem: a mining application
E Jélvez, N Morales, P Nancel-Penard, F Cornillier
Omega 94, 102046, 2020
332020
Optimizing pushback design considering minimum mining width for open pit strategic planning
P Nancel-Penard, N Morales
Engineering Optimization 54 (9), 1494-1508, 2022
192022
Value-optimal design of ramps in open pit mining
P Nancel-Penard, A Parra, N Morales, C Díaz, E Widzyk-Capehart
Archives of Mining Sciences, 399-413-399-413, 2019
152019
A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine …
P Nancel-Penard, N Morales, F Cornillier
European Journal of Operational Research 303 (3), 1088-1099, 2022
142022
Open-pit mine production scheduling: Improvements to MineLib library problems
E Jélvez, N Morales, P Nancel-Penard
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
122019
A comparison of conventional and direct block scheduling methods for open pit mine production scheduling
N Morales, E Jélvez, P Nancel-Penard, A Marinho, O Guimarães
Application of Computers and Operations Research in the Mineral Industry …, 2015
122015
Development and analysis of a methodology to generate operational open-pit mine ramp designs automatically
N Morales, P Nancel-Penard, N Espejo
Optimization and Engineering 24 (2), 711-741, 2023
102023
An integer linear programming model for optimizing open pit ramp design
N Morales, P Nancel-Penard, A Parra
38th APCOM proceedings, Session 11, 9-16, 2017
92017
A methodology for automatic ramp design in open pit mines
N Espejo, P Nancel-Penard, N Morales
Journal of Mining Engineering and Research 1 (2), 87-93, 2019
52019
A heuristic approach for scheduling activities with ‘OR’-precedence constraints at an underground mine
P Nancel-Penard, N Morales, V Rojas, T González
International Journal of Mining, Reclamation and Environment 34 (10), 748-762, 2020
42020
A direct block scheduling model considering operational space requirement for strategic open-pit mine production planning
P Nancel-Penard, E Jelvez
Optimization and Engineering, 1-27, 2023
22023
A procedure to generate optimized ramp designs using mathematical programming
N Espejo, P Nancel-Penard, N Morales
Mining goes Digital, 272-278, 2019
22019
A comparison between open-pit ramp designs obtained by varying design characteristics and through linear optimization
R Moreno, M Reyes, P Nancel-Penard
MassMin 2020: Proceedings of the Eighth International Conference …, 2020
12020
Optimization and sequencing a semiautomated ramp design in underground mining: a case study
S Montané, P Nancel-Penard, N Morales
Proceedings of the 28th International Symposium on Mine Planning and …, 2020
12020
Methodology to optimize and sequence the semiautomated ramp design in underground mining
S Montané, P Nancel-Penard, N Morales
Proceedings of the 27th International Symposium on Mine Planning and …, 2019
12019
Semi-Automatic Generation of Ramps in Open Pit Mining Using Mathematical Programming
C Díaz, A Parra, P Nancel-Penard, N Morales
Proceedings de 5, 2017
12017
Factores relevantes para la comparación de modelos de optimización en minas a rajo abierto
J Yarmuch, P Nancel-Penard, N Morales
12015
Comparing heuristics for the open pit block scheduling problem
E Jélvez, D Mancilla, N Morales, P Nancel-Penard
APCOM 2013, 456-464, 2013
12013
Application of a semi-automatic method for optimal ramp design
CA Cerón, P Nancel-Penard, N Morales
MassMin 2020: Proceedings of the Eighth International Conference …, 2020
2020
系统目前无法执行此操作,请稍后再试。
文章 1–20