Aggregation heuristic for the open-pit block scheduling problem E Jélvez, N Morales, P Nancel-Penard, J Peypouquet, P Reyes European Journal of Operational Research 249 (3), 1169-1177, 2016 | 95 | 2016 |
A new hybrid heuristic algorithm for the precedence constrained production scheduling problem: a mining application E Jélvez, N Morales, P Nancel-Penard, F Cornillier Omega 94, 102046, 2020 | 33 | 2020 |
Optimizing pushback design considering minimum mining width for open pit strategic planning P Nancel-Penard, N Morales Engineering Optimization 54 (9), 1494-1508, 2022 | 19 | 2022 |
Value-optimal design of ramps in open pit mining P Nancel-Penard, A Parra, N Morales, C Díaz, E Widzyk-Capehart Archives of Mining Sciences, 399-413-399-413, 2019 | 15 | 2019 |
A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine … P Nancel-Penard, N Morales, F Cornillier European Journal of Operational Research 303 (3), 1088-1099, 2022 | 14 | 2022 |
Open-pit mine production scheduling: Improvements to MineLib library problems E Jélvez, N Morales, P Nancel-Penard Proceedings of the 27th International Symposium on Mine Planning and …, 2019 | 12 | 2019 |
A comparison of conventional and direct block scheduling methods for open pit mine production scheduling N Morales, E Jélvez, P Nancel-Penard, A Marinho, O Guimarães Application of Computers and Operations Research in the Mineral Industry …, 2015 | 12 | 2015 |
Development and analysis of a methodology to generate operational open-pit mine ramp designs automatically N Morales, P Nancel-Penard, N Espejo Optimization and Engineering 24 (2), 711-741, 2023 | 10 | 2023 |
An integer linear programming model for optimizing open pit ramp design N Morales, P Nancel-Penard, A Parra 38th APCOM proceedings, Session 11, 9-16, 2017 | 9 | 2017 |
A methodology for automatic ramp design in open pit mines N Espejo, P Nancel-Penard, N Morales Journal of Mining Engineering and Research 1 (2), 87-93, 2019 | 5 | 2019 |
A heuristic approach for scheduling activities with ‘OR’-precedence constraints at an underground mine P Nancel-Penard, N Morales, V Rojas, T González International Journal of Mining, Reclamation and Environment 34 (10), 748-762, 2020 | 4 | 2020 |
A direct block scheduling model considering operational space requirement for strategic open-pit mine production planning P Nancel-Penard, E Jelvez Optimization and Engineering, 1-27, 2023 | 2 | 2023 |
A procedure to generate optimized ramp designs using mathematical programming N Espejo, P Nancel-Penard, N Morales Mining goes Digital, 272-278, 2019 | 2 | 2019 |
A comparison between open-pit ramp designs obtained by varying design characteristics and through linear optimization R Moreno, M Reyes, P Nancel-Penard MassMin 2020: Proceedings of the Eighth International Conference …, 2020 | 1 | 2020 |
Optimization and sequencing a semiautomated ramp design in underground mining: a case study S Montané, P Nancel-Penard, N Morales Proceedings of the 28th International Symposium on Mine Planning and …, 2020 | 1 | 2020 |
Methodology to optimize and sequence the semiautomated ramp design in underground mining S Montané, P Nancel-Penard, N Morales Proceedings of the 27th International Symposium on Mine Planning and …, 2019 | 1 | 2019 |
Semi-Automatic Generation of Ramps in Open Pit Mining Using Mathematical Programming C Díaz, A Parra, P Nancel-Penard, N Morales Proceedings de 5, 2017 | 1 | 2017 |
Factores relevantes para la comparación de modelos de optimización en minas a rajo abierto J Yarmuch, P Nancel-Penard, N Morales | 1 | 2015 |
Comparing heuristics for the open pit block scheduling problem E Jélvez, D Mancilla, N Morales, P Nancel-Penard APCOM 2013, 456-464, 2013 | 1 | 2013 |
Application of a semi-automatic method for optimal ramp design CA Cerón, P Nancel-Penard, N Morales MassMin 2020: Proceedings of the Eighth International Conference …, 2020 | | 2020 |