Determining the relationship between direct work and construction labor productivity in North America: Four decades of insights HH Neve, S Wandahl, S Lindhard, J Teizer, J Lerche Journal of Construction Engineering and Management 146 (9), 04020110, 2020 | 52 | 2020 |
Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring J Teizer, H Neve, H Li, S Wandahl, J König, B Ochner, M König, J Lerche Automation in Construction 116, 103245, 2020 | 50 | 2020 |
Application of last planner system to modular offshore wind construction J Lerche, HH Neve, G Ballard, J Teizer, S Wandahl, A Gross Journal of construction engineering and management 146 (11), 05020015, 2020 | 33 | 2020 |
Learning to see value-adding and non-value-adding work time in renovation production systems H Neve, S Wandahl, S Lindhard, J Teizer, J Lerche Production planning & control 33 (8), 790-802, 2022 | 29 | 2022 |
Continuous Improvements at Operator Level. J Lerche, H Neve, S Wandahl, A Gross Journal of Engineering, Project & Production Management 10 (1), 2020 | 29 | 2020 |
Ranking and comparing key factors causing time-overruns in on-site construction SM Lindhard, HH Neve, BT Kalsaas, DE Møller, S Wandahl International Journal of Construction Management, 2020 | 19 | 2020 |
Towards identifying making-do as lead waste in refurbishment projects HH Neve, S Wandahl Proc., 26th Annual Conf. Int. Group for Lean Construction, 1354-1364, 2018 | 19 | 2018 |
What a waste of time S Wandahl, HH Neve, J Lerche Proceedings of International Group of Lean Construction, IGLC2021, 157-66, 2021 | 18 | 2021 |
Lessons for construction: Delivering mega project on time through culture and Hoshin Kanri S Leth, J Lerche, HH Neve, S Wandahl Proc. 27th Annual Conference of the International. Group for Lean …, 2019 | 16 | 2019 |
Why would location-based scheduling be applicable for offshore wind turbine construction? J Lerche, O Seppänen, KB Pedersen, HH Neve, S Wandahl, A Gross Proceedings of the 27th Annual Conference of the International Group for …, 2019 | 14 | 2019 |
The impact of COVID-19 on offshore wind project productivity–A case study J Lerche, S Lorentzen, P Enevoldsen, HH Neve Renewable and Sustainable Energy Reviews 158, 112188, 2022 | 12 | 2022 |
The impact of construction labour productivity on the renovation wave S Wandahl, CT Perez, S Salling, HH Neve, J Lerche, S Petersen Construction Economics and Building 21 (3), 11-32, 2021 | 12 | 2021 |
Combining lean methods to improve construction labour efficiency in renovation projects HH Neve, J Lerche, S Wandahl Proceedings of the 29th Annual Conference of the International Group for …, 2021 | 11 | 2021 |
Integrating IPD and exploring potentials HH Neve, S Wandahl, SM Kaeseler, A Tandrup Proceeding of the 33rd Annual ARCOM Conference, 4-6, 2017 | 11 | 2017 |
Causes of delay in offshore wind turbine construction projects J Lerche, S Lindhard, P Enevoldsen, HH Neve, DE Møller, EL Jacobsen, ... Production Planning & Control 34 (15), 1513-1526, 2023 | 10 | 2023 |
Towards developing a framework for user-driven innovation in refurbishment SM Kæseler, HH Neve, S Wandahl 10th Nordic Conference on Construction Economics and Organization, 427-435, 2019 | 7 | 2019 |
Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction? J Lerche, HH Neve, KB Pedersen, S Wandahl, A Gross Proceedings of the 27th Annual Conference of the International Group for …, 2019 | 7 | 2019 |
What can be learned from variability in offshore wind projects J Lerche, S Lindhard, P Enevoldsen, A Velaayudan, J Teizer, HH Neve, ... Energy Strategy Reviews 39, 100794, 2022 | 5 | 2022 |
Categorisation of the offshore wind production system J Lerche, H Neve, S Wandahl, A Gross International Journal of Operational Research 43 (3), 299-317, 2022 | 5 | 2022 |
Lean renovation–a case study of productivity, flow, and time improvements P Johansen, S Christensen, HH Neve, S Wandahl Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC …, 2021 | 5 | 2021 |