关注
Hasse Neve
Hasse Neve
PhD student, Department of Engineering, Aarhus University, Denmark
在 eng.au.dk 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Determining the relationship between direct work and construction labor productivity in North America: Four decades of insights
HH Neve, S Wandahl, S Lindhard, J Teizer, J Lerche
Journal of Construction Engineering and Management 146 (9), 04020110, 2020
522020
Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring
J Teizer, H Neve, H Li, S Wandahl, J König, B Ochner, M König, J Lerche
Automation in Construction 116, 103245, 2020
502020
Application of last planner system to modular offshore wind construction
J Lerche, HH Neve, G Ballard, J Teizer, S Wandahl, A Gross
Journal of construction engineering and management 146 (11), 05020015, 2020
332020
Learning to see value-adding and non-value-adding work time in renovation production systems
H Neve, S Wandahl, S Lindhard, J Teizer, J Lerche
Production planning & control 33 (8), 790-802, 2022
292022
Continuous Improvements at Operator Level.
J Lerche, H Neve, S Wandahl, A Gross
Journal of Engineering, Project & Production Management 10 (1), 2020
292020
Ranking and comparing key factors causing time-overruns in on-site construction
SM Lindhard, HH Neve, BT Kalsaas, DE Møller, S Wandahl
International Journal of Construction Management, 2020
192020
Towards identifying making-do as lead waste in refurbishment projects
HH Neve, S Wandahl
Proc., 26th Annual Conf. Int. Group for Lean Construction, 1354-1364, 2018
192018
What a waste of time
S Wandahl, HH Neve, J Lerche
Proceedings of International Group of Lean Construction, IGLC2021, 157-66, 2021
182021
Lessons for construction: Delivering mega project on time through culture and Hoshin Kanri
S Leth, J Lerche, HH Neve, S Wandahl
Proc. 27th Annual Conference of the International. Group for Lean …, 2019
162019
Why would location-based scheduling be applicable for offshore wind turbine construction?
J Lerche, O Seppänen, KB Pedersen, HH Neve, S Wandahl, A Gross
Proceedings of the 27th Annual Conference of the International Group for …, 2019
142019
The impact of COVID-19 on offshore wind project productivity–A case study
J Lerche, S Lorentzen, P Enevoldsen, HH Neve
Renewable and Sustainable Energy Reviews 158, 112188, 2022
122022
The impact of construction labour productivity on the renovation wave
S Wandahl, CT Perez, S Salling, HH Neve, J Lerche, S Petersen
Construction Economics and Building 21 (3), 11-32, 2021
122021
Combining lean methods to improve construction labour efficiency in renovation projects
HH Neve, J Lerche, S Wandahl
Proceedings of the 29th Annual Conference of the International Group for …, 2021
112021
Integrating IPD and exploring potentials
HH Neve, S Wandahl, SM Kaeseler, A Tandrup
Proceeding of the 33rd Annual ARCOM Conference, 4-6, 2017
112017
Causes of delay in offshore wind turbine construction projects
J Lerche, S Lindhard, P Enevoldsen, HH Neve, DE Møller, EL Jacobsen, ...
Production Planning & Control 34 (15), 1513-1526, 2023
102023
Towards developing a framework for user-driven innovation in refurbishment
SM Kæseler, HH Neve, S Wandahl
10th Nordic Conference on Construction Economics and Organization, 427-435, 2019
72019
Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction?
J Lerche, HH Neve, KB Pedersen, S Wandahl, A Gross
Proceedings of the 27th Annual Conference of the International Group for …, 2019
72019
What can be learned from variability in offshore wind projects
J Lerche, S Lindhard, P Enevoldsen, A Velaayudan, J Teizer, HH Neve, ...
Energy Strategy Reviews 39, 100794, 2022
52022
Categorisation of the offshore wind production system
J Lerche, H Neve, S Wandahl, A Gross
International Journal of Operational Research 43 (3), 299-317, 2022
52022
Lean renovation–a case study of productivity, flow, and time improvements
P Johansen, S Christensen, HH Neve, S Wandahl
Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC …, 2021
52021
系统目前无法执行此操作,请稍后再试。
文章 1–20