关注
Rui Zhang
标题
引用次数
引用次数
年份
Solving the energy-efficient job shop scheduling problem: a multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total …
R Zhang, R Chiong
Journal of Cleaner Production 112, 3361-3375, 2016
3502016
Parallel machine scheduling under time-of-use electricity prices: New models and optimization approaches
JY Ding, S Song, R Zhang, R Chiong, C Wu
IEEE Transactions on Automation Science and Engineering 13 (2), 1138-1154, 2016
1992016
An improved iterated greedy algorithm with a Tabu-based reconstruction strategy for the no-wait flowshop scheduling problem
JY Ding, S Song, JND Gupta, R Zhang, R Chiong, C Wu
Applied Soft Computing 30, 604-613, 2015
1552015
A hybrid artificial bee colony algorithm for the job shop scheduling problem
R Zhang, S Song, C Wu
International Journal of Production Economics 141 (1), 167-178, 2013
1472013
A hybrid immune simulated annealing algorithm for the job shop scheduling problem
R Zhang, C Wu
Applied Soft Computing 10 (1), 79-89, 2010
1272010
A simulated annealing algorithm based on block properties for the job shop scheduling problem with total weighted tardinessobjective
R Zhang, C Wu
Computers & Operations Research 38 (5), 854-867, 2011
992011
A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines
M Abedi, R Chiong, N Noman, R Zhang
Expert Systems with Applications 157, 113348, 2020
962020
A simulation-based genetic algorithm approach for remanufacturing process planning and scheduling
R Zhang, SK Ong, AYC Nee
Applied Soft Computing 37, 521-532, 2015
892015
A multi-objective artificial bee colony algorithm for parallel batch-processing machine scheduling in fabric dyeing processes
R Zhang, PC Chang, S Song, C Wu
Knowledge-Based Systems 116, 114-129, 2017
712017
Distributionally robust single machine scheduling with risk aversion
Z Chang, S Song, Y Zhang, JY Ding, R Zhang, R Chiong
European Journal of Operational Research 256 (1), 261-274, 2017
712017
A hybrid approach to large-scale job shop scheduling
R Zhang, C Wu
Applied intelligence 32, 47-59, 2010
702010
A two-stage hybrid particle swarm optimization algorithm for the stochastic job shop scheduling problem
R Zhang, S Song, C Wu
Knowledge-Based Systems 27, 393-406, 2012
682012
Robust scheduling of hot rolling production by local search enhanced ant colony optimization algorithm
R Zhang, S Song, C Wu
IEEE Transactions on Industrial Informatics 16 (4), 2809-2819, 2020
582020
A hybrid differential evolution algorithm for job shop scheduling problems with expected total tardiness criterion
R Zhang, S Song, C Wu
Applied Soft Computing 13 (3), 1448-1458, 2013
552013
An artificial bee colony algorithm for the job shop scheduling problem with random processing times
R Zhang, C Wu
Entropy 13 (9), 1708-1729, 2011
532011
Bottleneck machine identification method based on constraint transformation for job shop scheduling with genetic algorithm
R Zhang, C Wu
Information Sciences 188, 236-252, 2012
492012
Local search enhanced multi-objective PSO algorithm for scheduling textile production processes with environmental considerations
R Zhang, PC Chang, S Song, C Wu
Applied Soft Computing 61, 447-467, 2017
402017
Accelerated methods for total tardiness minimisation in no-wait flowshops
J Ding, S Song, R Zhang, JND Gupta, C Wu
International Journal of Production Research 53 (4), 1002-1018, 2015
372015
Investigating the impact of operational variables on manufacturing cost by simulation optimization
R Zhang, WC Chiang, C Wu
International Journal of Production Economics 147, 634-646, 2014
362014
A hybrid genetic algorithm for the job shop scheduling problem with practical considerations for manufacturing costs: Investigations motivated by vehicle production
R Zhang, PC Chang, C Wu
International Journal of Production Economics 145 (1), 38-52, 2013
352013
系统目前无法执行此操作,请稍后再试。
文章 1–20