Factors affecting construction labour productivity: a case study of Jordan MA Hiyassat, MA Hiyari, GJ Sweis International Journal of Construction Management 16 (2), 138-149, 2016 | 145 | 2016 |
Factors affecting the accuracy of cost estimate: case of Jordan MT Hatamleh, M Hiyassat, GJ Sweis, RJ Sweis Engineering, Construction and Architectural Management 25 (1), 113-131, 2018 | 110 | 2018 |
Applying the ISO standards to a construction company: a case study MAS Hiyassat International Journal of Project Management 18 (4), 275-280, 2000 | 106 | 2000 |
Applying modified minimum moment method to multiple resource leveling MAS Hiyassat Journal of construction engineering and management 127 (3), 192-198, 2001 | 101 | 2001 |
Modification of minimum moment approach in resource leveling MAS Hiyassat Journal of Construction Engineering and Management 126 (4), 278-284, 2000 | 79 | 2000 |
Risk allocation in public construction projects: the case of Jordan MA Hiyassat, F Alkasagi, M El-Mashaleh, GJ Sweis International journal of construction management 22 (8), 1478-1488, 2022 | 38 | 2022 |
Construction bid price evaluation MA Salem Hiyassat Canadian Journal of Civil Engineering 28 (2), 264-270, 2001 | 35 | 2001 |
Assessing lean conformance by first-grade contractors in the Jordanian construction industry GJ Sweis, M Hiyassat, FF Al-Hroub Construction Innovation 16 (4), 446-459, 2016 | 33 | 2016 |
Evaluation of green building awareness in the construction industry: the case of Jordan B Omar, M Hiyassat, GJ Sweis, AB Abdallah, R Saleh, RJ Sweis Interdisciplinary Environmental Review 17 (3-4), 209-231, 2016 | 24 | 2016 |
Understanding the Causes of Material Wastage in the Construction Industry. GJ Sweis, A Hiari, M Thneibat, M Hiyassat, WS Abu-Khader, RJ Sweis Jordan Journal of Civil Engineering 15 (2), 2021 | 23 | 2021 |
Factors affecting the job satisfaction of construction engineers: Evidence from Jordan KM Alzubi, AM Alkhateeb, MA Hiyassat International journal of construction management 23 (2), 319-328, 2023 | 19 | 2023 |
The assessment of service quality in private hospitals in Amman area using the gap approach A Khraisat, RJ Sweis, R Saleh, T Suifan, M Hiyassat, A Sarea International Journal of Productivity and Quality Management 22 (3), 281-308, 2017 | 19 | 2017 |
Business strategy development model for applying knowledge management in construction WA Adi, M Hiyassat, N Lepkova Journal of civil engineering and management 27 (4), 246-259, 2021 | 18 | 2021 |
Priority setting for healthcare facilities maintenance RR Sweis, G.J.: Sweis, R.: Abuhussein, M Hiyassat, TS Suifan Life Science Journal 2014 11 (2s), 54-65, 2014 | 15 | 2014 |
The severity of design-construction interface risks in Jordanian construction industry MAH Lama Abu-Reishah International Journal of Construction Management 23 (9), 1540-1548, 2023 | 11 | 2023 |
Analyzing bidding competitiveness and success rate of contractors competing for public construction projects AM Alkhateeb, KH Hyari, MA Hiyassat Construction Innovation 21 (4), 576-591, 2021 | 11 | 2021 |
Assessment of droughts in Jordan: the Yarmouk and Zarqa basins. MA Rumman, M Hiyasat, GJ Sweis, RJ Sweis | 7 | 2009 |
A surface water management model for the Integrated Southern Ghor Project, Jordan M Abu Rumman, M Hiyassat, B Alsmadi, A Jamrah, M Alqam Construction Innovation 9 (3), 298-322, 2009 | 3 | 2009 |
Qualitative assessment of resilience in construction projects KA Hilu, MA Hiyassat Construction Innovation, 2023 | 2 | 2023 |
Statistical Analysis of Factors Causing Cost Overrun in Construction Industry (Case Study: Jordanian Construction) KM Aljebory, S Matarneh, M Hiyassat Al-Qalam journal 3 (5), 2019 | 2 | 2019 |