关注
Hyoungkwan Kim
标题
引用次数
引用次数
年份
Computer vision techniques for construction safety and health monitoring
JO Seo, SU Han, SH Lee, H Kim
Advanced Engineering Informatics 29 (2), 239-251, 2015
5092015
Encoder–decoder network for pixel‐level road crack detection in black‐box images
S Bang, S Park, H Kim, H Kim
Computer‐Aided Civil and Infrastructure Engineering 34 (8), 713-727, 2019
3892019
Detecting construction equipment using a region-based fully convolutional network and transfer learning
H Kim, H Kim, YW Hong, H Byun
Journal of computing in Civil Engineering 32 (2), 04017082, 2018
2402018
On-site construction management using mobile computing technology
C Kim, T Park, H Lim, H Kim
Automation in construction 35, 415-423, 2013
2272013
Integrating 3D visualization and simulation for tower crane operations on construction sites
M Al-Hussein, MA Niaz, H Yu, H Kim
Automation in construction 15 (5), 554-562, 2006
2042006
Real options analysis for renewable energy investment decisions in developing countries
K Kim, H Park, H Kim
Renewable and Sustainable Energy Reviews 75, 918-926, 2017
2012017
Image-based construction hazard avoidance system using augmented reality in wearable device
K Kim, H Kim, H Kim
Automation in construction 83, 390-403, 2017
1982017
Vision-based object-centric safety assessment using fuzzy inference: Monitoring struck-by accidents with moving objects
H Kim, K Kim, H Kim
Journal of Computing in Civil Engineering 30 (4), 04015075, 2016
1732016
Structuring the prediction model of project performance for international construction projects: A comparative analysis
DY Kim, SH Han, H Kim, H Park
Expert systems with applications 36 (2), 1961-1971, 2009
1692009
Using hue, saturation, and value color space for hydraulic excavator idle time analysis
J Zou, H Kim
Journal of computing in civil engineering 21 (4), 238-246, 2007
1682007
Analyzing schedule delay of mega project: Lessons learned from Korea train express
SH Han, S Yun, H Kim, YH Kwak, HK Park, SH Lee
IEEE Transactions on Engineering Management 56 (2), 243-256, 2009
1652009
4D CAD model updating using image processing-based construction progress monitoring
C Kim, B Kim, H Kim
Automation in Construction 35, 44-52, 2013
1622013
Augmented reality system for facility management using image-based indoor localization
F Baek, I Ha, H Kim
Automation in construction 99, 18-26, 2019
1442019
Image retrieval using BIM and features from pretrained VGG network for indoor localization
I Ha, H Kim, S Park, H Kim
Building and Environment 140, 23-31, 2018
1302018
Patch-based crack detection in black box images using convolutional neural networks
S Park, S Bang, H Kim, H Kim
Journal of Computing in Civil Engineering 33 (3), 04019017, 2019
1292019
Predicting profit performance for selecting candidate international construction projects
SH Han, DY Kim, H Kim
Journal of construction engineering and management 133 (6), 425-436, 2007
1292007
UAV-based automatic generation of high-resolution panorama at a construction site with a focus on preprocessing for image stitching
S Bang, H Kim, H Kim
Automation in construction 84, 70-80, 2017
1132017
Causes of bad profit in overseas construction projects
SH Han, SH Park, DY Kim, H Kim, YW Kang
Journal of construction engineering and management 133 (12), 932-943, 2007
1112007
Greenhouse gas emissions from onsite equipment usage in road construction
B Kim, H Lee, H Park, H Kim
Journal of Construction Engineering and Management 138 (8), 982-990, 2012
1002012
Analyzing context and productivity of tunnel earthmoving processes using imaging and simulation
H Kim, S Bang, H Jeong, Y Ham, H Kim
Automation in Construction 92, 188-198, 2018
952018
系统目前无法执行此操作,请稍后再试。
文章 1–20