A Virtual Synchronous Machine implementation for distributed control of power converters in SmartGrids S D’Arco, JA Suul, OB Fosso Electric Power Systems Research 122, 180-197, 2015 | 738 | 2015 |
Generation scheduling in a deregulated system. The Norwegian case OB Fosso, A Gjelsvik, A Haugstad, B Mo, I Wangensteen IEEE Transactions on power systems 14 (1), 75-81, 1999 | 439 | 1999 |
Automatic tuning of cascaded controllers for power converters using eigenvalue parametric sensitivities S D'Arco, JA Suul, OB Fosso IEEE Transactions on Industry Applications 51 (2), 1743-1753, 2014 | 221 | 2014 |
A classification of DC node voltage control methods for HVDC grids TK Vrana, J Beerten, R Belmans, OB Fosso Electric power systems research 103, 137-144, 2013 | 187 | 2013 |
Control system tuning and stability analysis of virtual synchronous machines S D'Arco, JA Suul, OB Fosso 2013 IEEE Energy Conversion Congress and Exposition, 2664-2671, 2013 | 170 | 2013 |
Small-signal modeling and parametric sensitivity of a virtual synchronous machine in islanded operation S D’Arco, JA Suul, OB Fosso International Journal of Electrical Power & Energy Systems 72, 3-15, 2015 | 149 | 2015 |
Small-signal modelling and parametric sensitivity of a virtual synchronous machine S D'Arco, JA Suul, OB Fosso 2014 Power Systems Computation Conference, 1-9, 2014 | 125 | 2014 |
Short-term hydro scheduling in a liberalized power system OB Fosso, MM Belsnes 2004 International Conference on Power System Technology, 2004. PowerCon …, 2004 | 114 | 2004 |
An overview on formulations and optimization methods for the unit-based short-term hydro scheduling problem J Kong, HI Skjelbred, OB Fosso Electric power systems research 178, 106027, 2020 | 106 | 2020 |
Short-term and Medium-term Generation Scheduling in the Norwegian Hydro System under a Competitive Power Market Structure N Flatabø, A Haugstad, M Birger, OB Fosso VIII SEPOPE, Brazilia, 2002, 2002 | 79* | 2002 |
A method for calculation of margins to voltage instability applied on the Norwegian system for maintaining required security level N Flatabo, OB Fosso, R Ognedal, T Carlsen, KR Heggland IEEE transactions on power systems 8 (3), 920-928, 1993 | 77 | 1993 |
Simplified models of a single-phase power electronic inverter for railway power system stability analysis—Development and evaluation S Danielsen, OB Fosso, M Molinas, JA Suul, T Toftevaag Electric Power Systems Research 80 (2), 204-214, 2010 | 66 | 2010 |
Dynamic incorporation of nonlinearity into MILP formulation for short-term hydro scheduling HI Skjelbred, J Kong, OB Fosso International journal of electrical power & energy systems 116, 105530, 2020 | 57 | 2020 |
Stochastic optimization of microgrid operation with renewable generation and energy storages P Aaslid, M Korpås, MM Belsnes, OB Fosso IEEE Transactions on Sustainable Energy 13 (3), 1481-1491, 2022 | 53 | 2022 |
Small-signal stability study of the Cigré DC grid test system with analysis of participation factors and parameter sensitivity of oscillatory modes MK Zadeh, M Amin, JA Suul, M Molinas, OB Fosso 2014 Power Systems Computation Conference, 1-8, 2014 | 48 | 2014 |
A European Supergrid: Present State and Future Challenges S Cole, TK Vrana, JB Curis, CC Liu, K Karoui, OB Fosso, AM Denis 17th Power Systems Computation Conference 2011 (PSCC 2011 STOCKHOLM), 51-57, 2012 | 48 | 2012 |
Optimal short term hydro scheduling including security constraints A Johannesen, A Gjelsvik, OB Fosso, N Flatabo IEEE Transactions on Power Systems 6 (2), 576-583, 1991 | 48 | 1991 |
An Input-Voltage-Sharing Control Strategy of Input-Series-Output-Parallel Isolated Bidirectional DC/DC Converter for DC Distribution Network Y Wang, Y Guan, OB Fosso, M Molinas, SZ Chen, Y Zhang IEEE Transactions on Power Electronics 37 (2), 1592-1604, 2021 | 47 | 2021 |
Constant power load characteristic’s influence on the low-frequency interaction between advanced electrical rail vehicle and railway traction power supply with rotary converters S Danielsen, M Molinas, T Toftevaag, OB Fosso Modern electric traction 2009, 1-6, 2009 | 45 | 2009 |
Technical aspects of the North Sea super grid TK Vrana, OB Fosso CIGRE Electra, November, 2011 | 44 | 2011 |