A probability density function generator based on neural networks CH Chen, F Song, FJ Hwang, L Wu Physica A: Statistical Mechanics and Its Applications 541, 123344, 2020 | 117 | 2020 |
Travel time prediction system based on data clustering for waste collection vehicles CH Chen, FJ Hwang, HY Kung IEICE TRANSACTIONS on Information and Systems 102 (7), 1374-1383, 2019 | 103 | 2019 |
Parallel and distributed architecture of genetic algorithm on Apache Hadoop and Spark HC Lu, FJ Hwang, YH Huang Applied Soft Computing 95, 106497, 2020 | 38 | 2020 |
An effective placement method for the single container loading problem YH Huang, FJ Hwang, HC Lu Computers & Industrial Engineering 97, 212-221, 2016 | 38 | 2016 |
Makespan minimization for the m-machine ordered flow shop scheduling problem M Khatami, A Salehipour, FJ Hwang Computers & Operations Research 111, 400-414, 2019 | 32 | 2019 |
Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type BMT Lin, FJ Hwang Information Processing Letters 111 (5), 208-212, 2011 | 27 | 2011 |
Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence FJ Hwang, BMT Lin Journal of the Operational Research Society 63 (6), 839-845, 2012 | 24 | 2012 |
Coupled-task scheduling on a single machine subject to a fixed-job-sequence FJ Hwang, BMT Lin Computers & Industrial Engineering 60 (4), 690-698, 2011 | 22 | 2011 |
Energy-efficient single-machine scheduling problem with controllable job processing times under differential electricity pricing YC Tsao, VV Thanh, FJ Hwang Resources, Conservation and Recycling 161, 104902, 2020 | 17 | 2020 |
Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines FJ Hwang, BMT Lin Computers & Operations Research 98, 103-112, 2018 | 17 | 2018 |
Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence FJ Hwang, MY Kovalyov, BMT Lin Annals of Operations Research 217, 263-279, 2014 | 17 | 2014 |
Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence FJ Hwang, MY Kovalyov, BMT Lin Discrete Optimization 9 (1), 29-39, 2012 | 15 | 2012 |
Spatial heterogeneity and migration characteristics of traffic congestion—A quantitative identification method based on taxi trajectory data X Fu, C Xu, Y Liu, CH Chen, FJ Hwang, J Wang Physica A: Statistical Mechanics and its Applications 588, 126482, 2022 | 14 | 2022 |
Global optimization for the three-dimensional open-dimension rectangular packing problem YH Huang, FJ Hwang Engineering Optimization 50 (10), 1789-1809, 2018 | 11 | 2018 |
Relocation scheduling subject to fixed processing sequences BMT Lin, FJ Hwang, AV Kononov Journal of Scheduling 19, 153-163, 2016 | 10 | 2016 |
Northeast passage in Asia-Europe liner shipping: an economic and environmental assessment PH Tseng, A Zhou, FJ Hwang International Journal of Sustainable Transportation 15 (4), 273-284, 2021 | 9 | 2021 |
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence BMT Lin, FJ Hwang, JND Gupta Journal of Scheduling 20, 293-302, 2017 | 8 | 2017 |
Two-stage flexible flow shop scheduling subject to fixed job sequences FJ Hwang, BMT Lin Journal of the Operational Research Society 67 (3), 506-515, 2016 | 8 | 2016 |
Bi-criteria sequencing of courses and formation of classes for a bottleneck classroom OG Czibula, H Gu, FJ Hwang, MY Kovalyov, Y Zinder Computers & Operations Research 65, 53-63, 2016 | 7 | 2016 |
Fast Spatiotemporal Learning Framework for Traffic Flow Forecasting C Guo, CH Chen, FJ Hwang, CC Chang, CC Chang IEEE Transactions on Intelligent Transportation Systems, 2023 | 4 | 2023 |