Standardization and optimization of an automotive components production line I Antoniolli, P Guariente, T Pereira, LP Ferreira, FJG Silva Procedia Manufacturing 13, 1120-1127, 2017 | 159 | 2017 |
The Impact of the Application of Lean Tools for Improvement of Process in a Plastic Company: a case study P Ribeiro, JC Sá, LP Ferreira, FJG Silva, MT Pereira, G Santos Procedia Manufacturing 38, 765-775, 2019 | 158 | 2019 |
Improving the quality and productivity of steel wire-rope assembly lines for the automotive industry C Rosa, FJG Silva, LP Ferreira Procedia Manufacturing 11, 1035-1042, 2017 | 157 | 2017 |
SMED methodology: The reduction of setup times for Steel Wire-Rope assembly lines in the automotive industry C Rosa, FJG Silva, LP Ferreira, R Campilho Procedia Manufacturing 13, 1034-1042, 2017 | 143 | 2017 |
Improve the extrusion process in tire production using Six Sigma methodology T Costa, FJG Silva, LP Ferreira Procedia manufacturing 13, 1104-1111, 2017 | 142 | 2017 |
Implementing lean tools in the manufacturing process of trimmings products P Neves, FJG Silva, LP Ferreira, T Pereira, A Gouveia, C Pimentel Procedia Manufacturing 17, 696-704, 2018 | 136 | 2018 |
Implementing autonomous maintenance in an automotive components manufacturer P Guariente, I Antoniolli, LP Ferreira, T Pereira, FJG Silva Procedia Manufacturing 13, 1128-1134, 2017 | 134 | 2017 |
Key settings for successful open innovation arena A Sivam, T Dieguez, LP Ferreira, FJG Silva Journal of Computational Design and Engineering 6 (4), 507-515, 2019 | 118 | 2019 |
Applying SMED methodology in cork stoppers production E Sousa, FJG Silva, LP Ferreira, MT Pereira, R Gouveia, RP Silva Procedia manufacturing 17, 611-622, 2018 | 113 | 2018 |
A review of heat treatments on improving the quality and residual stresses of the Ti–6Al–4V parts produced by additive manufacturing Ó Teixeira, FJG Silva, LP Ferreira, E Atzeni Metals 10 (8), 1006, 2020 | 92 | 2020 |
Improving manual assembly lines devoted to complex electronic devices by applying Lean tools D Correia, FJG Silva, RM Gouveia, T Pereira, LP Ferreira Procedia Manufacturing 17, 663-671, 2018 | 89 | 2018 |
Analysis and optimisation of a logistic warehouse in the automotive industry R Caridade, T Pereira, LP Ferreira, FJG Silva Procedia Manufacturing 13, 1096-1103, 2017 | 89 | 2017 |
Connecting lean and green with sustainability towards a conceptual model P Teixeira, JC Sá, FJG Silva, LP Ferreira, G Santos, P Fontoura Journal of Cleaner Production 322, 129047, 2021 | 88 | 2021 |
Cost reduction and quality improvements in the printing industry A Moreira, FJG Silva, AI Correia, T Pereira, LP Ferreira, F De Almeida Procedia manufacturing 17, 623-630, 2018 | 88 | 2018 |
Implementation of 5S methodology in a metalworking company C Costa, LP Ferreira, JC Sá, FJG Silva DAAAM International Scientific Book 17, 001-012, 2018 | 80 | 2018 |
Optimization of the cold profiling process through SMED T Vieira, JC Sá, MP Lopes, G Santos, MJ Félix, LP Ferreira, FJG Silva, ... Procedia Manufacturing 38, 892-899, 2019 | 79 | 2019 |
Warehouse operations logistics improvement in a cork stopper factory R Martins, MT Pereira, LP Ferreira, JC Sá, FJG Silva Procedia Manufacturing 51, 1723-1729, 2020 | 77 | 2020 |
Implementation of lean methodologies in the management of consumable materials in the maintenance workshops of an industrial company T Pombal, LP Ferreira, JC Sá, MT Pereira, FJG Silva Procedia Manufacturing 38, 975-982, 2019 | 76 | 2019 |
Improvement of production line in the automotive industry through lean philosophy J Azevedo, JC Sá, LP Ferreira, G Santos, FM Cruz, G Jimenez, FJG Silva Procedia Manufacturing 41, 1023-1030, 2019 | 69 | 2019 |
Improving the machining process of the metalworking industry using the lean tool SMED C Monteiro, LP Ferreira, NO Fernandes, JC Sá, MT Ribeiro, FJG Silva Procedia Manufacturing 41, 555-562, 2019 | 68 | 2019 |