Cost and time management efficiency assessment for large road projects using data envelopment analysis C Ahbab, S Daneshvar, T Celık Teknik Dergi 30 (2), 8937-8959, 2019 | 20 | 2019 |
An Investigation on Time and Cost Overrun in Construction Projects C Ahbab Eastern Mediterranean University (EMU)-Doğu Akdeniz Üniversitesi (DAÜ), 2012 | 10 | 2012 |
Integration of building information modeling into the undergraduate curriculum: case of Eastern Mediterranean University C Ahbab, A Rezaei, NS Sistani International Balkans Conferance on Challenges of Civil Engineering, 2013 | 6 | 2013 |
An investigation on delay, cost overrun, quality, and health and safety problems in construction projects C Ahbab, T Celik 10th International Congress on Advances in Civil Engineering, Ankara: Middle …, 2012 | 3 | 2012 |
Adopting BIM as a new Technology into Civil Engineering Education C Ahbab, A Rezaei, N Sanei Sistani 7th International Symposium on Civil and Environmental Engineering, CENG’12 …, 2012 | 1 | 2012 |
Time and Cost Overrun Analysis and Mitigation Procedures in Construction Projects C Ahbab Eastern Mediterranean University (EMU)-Doğu Akdeniz Üniversitesi (DAÜ), 2020 | | 2020 |
Building Information Modeling as new teaching tool in Civil Engineering education A Rezaei, C Ahbab, N Sanei Sistani 11th International Congress on Advances in Civil Engineering, ACE 2014 …, 2014 | | 2014 |