Early Cost Estimating of Road Tunnel Construction Using Neural Networks K Petroutsatou, E Georgopoulos, S Lambropoulos, JP Pantouvakis Journal of Construction Engineering and Management 1, 679-687, 2011 | 140 | 2011 |
The use of time and cost utility for construction contract award under European Union Legislation S Lambropoulos Building and Environment 42 (1), 452-463, 2007 | 111 | 2007 |
Fund allocation for transportation network recovery following natural disasters MG Karlaftis, KL Kepaptsoglou, S Lambropoulos Journal of Urban Planning and Development 133, 82-89, 2007 | 99 | 2007 |
Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling A Kallantzis, S Lambropoulos Engineering, Construction and Architectural Management 11 (3), 211-222, 2004 | 55 | 2004 |
Parametric Model for Conceptual Cost Estimation of Concrete Bridge Foundations N Fragkakis, S Lambropoulos, G Tsiambaos Journal of Infrastructure Systems 17 (2), 66-75, 2011 | 48 | 2011 |
Linear versus network scheduling: A critical path comparison A Kallantzis, J Soldatos, S Lambropoulos Journal of Construction Engineering and Management 133 (7), 483-491, 2007 | 45 | 2007 |
Road tunnel early cost estimates using multiple regression analysis C Petroutsatou, S Lambropoulos, JP Pantouvakis Operational Research 6, 311-322, 2006 | 45 | 2006 |
Preliminary cost estimate model for culverts N Fragkakis, M Marinelli, S Lambropoulos Procedia Engineering 123, 153-161, 2015 | 30 | 2015 |
A cost estimate method for bridge superstructures using regression analysis and bootstrap N Fragkakis, S Lambropoulos, JP Pantouvakis Organization, Technology and Management in Construction – An International …, 2010 | 30 | 2010 |
Road tunnels construction cost estimation: a structural equation model development and comparison K Petroutsatou, S Lambropoulos Operational Research 10, 163-173, 2010 | 26 | 2010 |
Objective Construction Contract Award using Cost, Time and Durability Utility S Lambropoulos Procedia – Social and Behavioral Sciences Journal 74, 487-497, 2013 | 25 | 2013 |
Rethinking new public infrastructure value for money in recession times: the Greek case M Marinelli, K Petroutsatou, N Fragkakis, S Lambropoulos International Journal of Construction Management 18 (4), 331-342, 2018 | 24 | 2018 |
A simulation environment for construction project manager competence development in construction management A Panas, JP Pantouvakis, S Lambropoulos Procedia – Social and Behavioral Sciences Journal 119, 739-747, 2014 | 23 | 2014 |
Earthmoving Trucks Condition Level Prediction using Neural Networks M Marinelli, S Lambropoulos, K Petroutsatou Journal of Quality in Maintenance Engineering 20 (2), 182-192, 2014 | 23 | 2014 |
Modeling uncertainty during cost benefit analysis of transportation projects with the aid of fuzzy set theory A Maravas, JP Pantouvakis, S Lambropoulos Procedia-Social and Behavioral Sciences 48, 3661-3670, 2012 | 23 | 2012 |
SEMANTIC: Smart EarthMoving ANalysis and esTImation of Cost S Lambropoulos, N Manolopoulos, JP Pantouvakis Construction Management & Economics 14 (2), 79-92, 1996 | 23 | 1996 |
Non-parametric bill-of-quantities estimation of concrete road bridges' superstructure: An artificial neural networks approach Marinelli,M, Dimitriou,L, N Fragkakis, S Lambropoulos Procs 31st Annual ARCOM Conference, 2015 | 17 | 2015 |
A quantity and cost estimate model for concrete road bridges N Fragkakis, S Lambropoulos Tech. Chron.Sci.J.TCG 24 (1-3), 141-154, 2004 | 15 | 2004 |
Reforming civil engineering studies in recession times S Lambropoulos, JP Pantouvakis, M Marinelli Procedia – Social and Behavioral Sciences Journal 119, 776-785, 2014 | 14 | 2014 |
Correspondence of activity relationships and critical path between time-location diagrams and CPM A Kallantzis, S Lambropoulos Operational Research 4, 277-290, 2004 | 14 | 2004 |