Fusion of photogrammetry and video analysis for productivity assessment of earthwork processes M Bügler, A Borrmann, G Ogunmakin, PA Vela, J Teizer Computer‐Aided Civil and Infrastructure Engineering 32 (2), 107-123, 2017 | 128 | 2017 |
Assessing and updating the reliability of concrete bridges subjected to spatial deterioration–principles and software implementation R Schneider, J Fischer, M Bügler, M Nowak, S Thöns, A Borrmann, ... Structural Concrete 16 (3), 356-365, 2015 | 45 | 2015 |
A Comprehensive Methodology for Vision-Based Progress and Activity Estimation of Excavation Processes for Productivity Assessment M Bügler, G Ogunmakin, J Teizer, PA Vela, A Borrmann EG-ICE Workshop on Intelligent Computing in Engineering, Cardiff, Wales, 2014, 2014 | 42 | 2014 |
BIMsite-towards a BIM-based generation and evaluation of realization variants comprising construction methods, site layouts and schedules S Krepp, K Jahr, S Bigontina, M Bügler, A Borrmann Proc. of the EG-ICE Workshop on Intelligent Computing in Engineering, 2016 | 12 | 2016 |
Knowledge based bridge engineering-artificial intelligence meets building information modeling D Singer, M Bügler, A Borrmann Proc. of the EG-ICE Workshop on Intelligent Computing in Engineering, 2016 | 11 | 2016 |
Intelligente Bauwerke-Prototyp zur Ermittlung der Schadens-und Zustandsentwicklung für Elemente des Brückenmodells R Schneider, J Fischer, D Straub, S Thöns, M Bügler, A Borrmann | 10 | 2015 |
Web based field data analysis and data-driven simulation application for construction performance prediction A Kargul, WA Günthner, M Bügler, A Borrmann Journal of Information Technology in Construction 20, 479-494, 2015 | 7 | 2015 |
Using Swap‐Based Search Trees to obtain Solutions for Resource Constrained Project Scheduling Problems M Bügler, A Borrmann PAMM 14 (1), 809-810, 2014 | 7 | 2014 |
Sex allocation in a polyembryonic parasitoid with female soldiers: an evolutionary simulation and an experimental test M Bügler, P Rempoulakis, R Shacham, T Keasar, F Thuijsman Plos one 8 (6), e64780, 2013 | 7 | 2013 |
Swap Based Process Schedule Optimization using Discrete-Event Simulation M Bügler, G Dori, A Borrmann International Conference on Construction Applications of Virtual Reality …, 2013 | 6 | 2013 |
Integrating Feedback from Image Based 3D Reconstruction into Models of Excavation Processes for efficient Scheduling M Bügler, H Metzmacher, A Borrmann, C van Treeck EG-ICE Workshop on Intelligent Computing in Engineering, Vienna, Austria, 2013 | 6 | 2013 |
A software prototype for assessing the reliability of a concrete bridge superstructure subjected to chloride-induced reinforcement corrosion R Schneider, S Thöns, J Fischer, M Bügler, A Borrmann, D Straub IALCCE, Tokyo, Japan, 2014, 2014 | 5 | 2014 |
MITRO: an augmented mobile telepresence robot with assisted control S Alers, D Bloembergen, M Bügler, D Hennes, K Tuyls AAMAS, 1475-1476, 2012 | 5 | 2012 |
Construction site pedestrian simulation with moving obstacles G Filomeno, II Romero, RL Vásquez, DH Biedermann, M Bügler 28. Forum BauinformatikUniversitaet Hannover, Institut fuer Risiko und …, 2016 | 1 | 2016 |
Simulation Based Construction Project Schedule Optimization: An Overview on the State-of-the-Art M Bügler, A Borrmann Handbook of Research on Computational Simulation and Modeling in Engineering, 2015 | 1 | 2015 |
Fertigungssynchrone Ablaufsimulation von Unikatbaustellen im Tiefbau A Kargul, M Bügler, S Kessler, A Borrmann, WA Günthner Bauportal, 2014 | 1 | 2014 |
Simulation Based Construction Project Schedule Optimization M Bügler, A Borrmann | | 2016 |
Reactive Simulation of Shoring and Excavation Processes based on Automated Performance Monitoring M Bügler Technische Universität München, 2016 | | 2016 |
Intelligente Bauwerke-Prototyp zur Ermittlung der Schadens-und Zustandsentwicklung fuer Elemente des Brueckenmodells S Thoens, A Borrmann, D Straub, R Schneider, J Fischer, M Buegler Berichte der Bundesanstalt fuer Strassenwesen. Unterreihe Bruecken-und …, 2015 | | 2015 |
846 A software prototype for assessing the reliability of a concrete bridge superstructure subjected to chloride-induced reinforcement corrosion R Schneider, S Thöns, J Fischer, M Bügler, A Borrmann, D Straub Life-Cycle of Structural Systems: Design, Assessment, Maintenance and …, 2015 | | 2015 |