关注
Reza Ramezanian
标题
引用次数
引用次数
年份
A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems
M Sayadi, R Ramezanian, N Ghaffari-Nasab
International Journal of Industrial Engineering Computations 1 (1), 1-10, 2010
3962010
Blood supply chain network design under uncertainties in supply and demand considering social aspects
R Ramezanian, Z Behboodi
Transportation Research Part E: Logistics and Transportation Review 104, 69-82, 2017
1832017
An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search
R Ramezanian, D Rahmani, F Barzinpour
Expert systems with applications 39 (1), 1256-1263, 2012
1572012
Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem
R Ramezanian, A Ezzatpanah
Computers & Industrial Engineering 87, 74-80, 2015
1082015
A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study
D Rahmani, R Ramezanian
Computers & Industrial Engineering 98, 360-372, 2016
892016
A robust optimization model for multi-product two-stage capacitated production planning under uncertainty
D Rahmani, R Ramezanian, P Fattahi, M Heydari
Applied Mathematical Modelling 37 (20-21), 8957-8971, 2013
822013
Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities
B Vahedi Nouri, P Fattahi, R Ramezanian
International Journal of Production Research 51 (12), 3501-3515, 2013
782013
An integrated framework of genetic network programming and multi-layer perceptron neural network for prediction of daily stock return: An application in Tehran stock exchange …
R Ramezanian, A Peymanfar, SB Ebrahimi
Applied soft computing 82, 105551, 2019
712019
MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints
R Ramezanian, M Saidi-Mehrabad, P Fattahi
Journal of Manufacturing Systems 32 (2), 392-401, 2013
682013
A robust model for a leader–follower competitive facility location problem in a discrete space
MG Ashtiani, A Makui, R Ramezanian
Applied Mathematical Modelling 37 (1-2), 62-71, 2013
642013
Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
R Ramezanian, M Saidi-Mehrabad
Applied Mathematical Modelling 37 (7), 5134-5147, 2013
632013
Multi-period and multi-resource operating room scheduling under uncertainty: A case study
MM Vali-Siar, S Gholami, R Ramezanian
Computers & Industrial Engineering 126, 549-568, 2018
602018
Integration of carrier selection and supplier selection problem in humanitarian logistics
M Ghorbani, R Ramezanian
Computers & Industrial Engineering 144, 106473, 2020
532020
Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints
B Vahedi-Nouri, P Fattahi, R Ramezanian
Journal of Manufacturing Systems 32 (1), 167-173, 2013
532013
Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study
R Ramezanian, MM Vali-Siar, M Jalalian
International Journal of Production Research 57 (10), 3311-3333, 2019
502019
A mathematical model for integrating lot-sizing and scheduling problem in capacitated flow shop environments
R Ramezanian, M Saidi-Mehrabad, E Teimoury
The International Journal of Advanced Manufacturing Technology 66, 347-361, 2013
492013
A tri-level covering fortification model for facility protection against disturbance in r-interdiction median problem
M Mahmoodjanloo, SP Parvasi, R Ramezanian
Computers & Industrial Engineering 102, 219-232, 2016
472016
A general flow shop scheduling problem with consideration of position-based learning effect and multiple availability constraints
B Vahedi-Nouri, P Fattahi, R Tavakkoli-Moghaddam, R Ramezanian
The International Journal of Advanced Manufacturing Technology 73, 601-611, 2014
432014
An efficient hybrid genetic algorithm for multi-product competitive supply chain network design with price-dependent demand
A Saghaeeian, R Ramezanian
Applied Soft Computing 71, 872-893, 2018
382018
Mean-conditional value at risk model for the stochastic project scheduling problem
F Rezaei, AA Najafi, R Ramezanian
Computers & Industrial Engineering 142, 106356, 2020
372020
系统目前无法执行此操作,请稍后再试。
文章 1–20