A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems M Sayadi, R Ramezanian, N Ghaffari-Nasab International Journal of Industrial Engineering Computations 1 (1), 1-10, 2010 | 396 | 2010 |
Blood supply chain network design under uncertainties in supply and demand considering social aspects R Ramezanian, Z Behboodi Transportation Research Part E: Logistics and Transportation Review 104, 69-82, 2017 | 183 | 2017 |
An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search R Ramezanian, D Rahmani, F Barzinpour Expert systems with applications 39 (1), 1256-1263, 2012 | 157 | 2012 |
Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem R Ramezanian, A Ezzatpanah Computers & Industrial Engineering 87, 74-80, 2015 | 108 | 2015 |
A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study D Rahmani, R Ramezanian Computers & Industrial Engineering 98, 360-372, 2016 | 89 | 2016 |
A robust optimization model for multi-product two-stage capacitated production planning under uncertainty D Rahmani, R Ramezanian, P Fattahi, M Heydari Applied Mathematical Modelling 37 (20-21), 8957-8971, 2013 | 82 | 2013 |
Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities B Vahedi Nouri, P Fattahi, R Ramezanian International Journal of Production Research 51 (12), 3501-3515, 2013 | 78 | 2013 |
An integrated framework of genetic network programming and multi-layer perceptron neural network for prediction of daily stock return: An application in Tehran stock exchange … R Ramezanian, A Peymanfar, SB Ebrahimi Applied soft computing 82, 105551, 2019 | 71 | 2019 |
MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints R Ramezanian, M Saidi-Mehrabad, P Fattahi Journal of Manufacturing Systems 32 (2), 392-401, 2013 | 68 | 2013 |
A robust model for a leader–follower competitive facility location problem in a discrete space MG Ashtiani, A Makui, R Ramezanian Applied Mathematical Modelling 37 (1-2), 62-71, 2013 | 64 | 2013 |
Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system R Ramezanian, M Saidi-Mehrabad Applied Mathematical Modelling 37 (7), 5134-5147, 2013 | 63 | 2013 |
Multi-period and multi-resource operating room scheduling under uncertainty: A case study MM Vali-Siar, S Gholami, R Ramezanian Computers & Industrial Engineering 126, 549-568, 2018 | 60 | 2018 |
Integration of carrier selection and supplier selection problem in humanitarian logistics M Ghorbani, R Ramezanian Computers & Industrial Engineering 144, 106473, 2020 | 53 | 2020 |
Minimizing total flow time for the non-permutation flow shop scheduling problem with learning effects and availability constraints B Vahedi-Nouri, P Fattahi, R Ramezanian Journal of Manufacturing Systems 32 (1), 167-173, 2013 | 53 | 2013 |
Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study R Ramezanian, MM Vali-Siar, M Jalalian International Journal of Production Research 57 (10), 3311-3333, 2019 | 50 | 2019 |
A mathematical model for integrating lot-sizing and scheduling problem in capacitated flow shop environments R Ramezanian, M Saidi-Mehrabad, E Teimoury The International Journal of Advanced Manufacturing Technology 66, 347-361, 2013 | 49 | 2013 |
A tri-level covering fortification model for facility protection against disturbance in r-interdiction median problem M Mahmoodjanloo, SP Parvasi, R Ramezanian Computers & Industrial Engineering 102, 219-232, 2016 | 47 | 2016 |
A general flow shop scheduling problem with consideration of position-based learning effect and multiple availability constraints B Vahedi-Nouri, P Fattahi, R Tavakkoli-Moghaddam, R Ramezanian The International Journal of Advanced Manufacturing Technology 73, 601-611, 2014 | 43 | 2014 |
An efficient hybrid genetic algorithm for multi-product competitive supply chain network design with price-dependent demand A Saghaeeian, R Ramezanian Applied Soft Computing 71, 872-893, 2018 | 38 | 2018 |
Mean-conditional value at risk model for the stochastic project scheduling problem F Rezaei, AA Najafi, R Ramezanian Computers & Industrial Engineering 142, 106356, 2020 | 37 | 2020 |