Integrated pulp and paper mill planning and scheduling MO Santos, B Almada-Lobo Computers & Industrial Engineering 63 (1), 1-12, 2012 | 102 | 2012 |
An optimization approach for the lot sizing and scheduling problem in the brewery industry TA Baldo, MO Santos, B Almada-Lobo, R Morabito Computers & Industrial Engineering 72, 58-71, 2014 | 89 | 2014 |
Hybrid manufacturing and remanufacturing lot-sizing problem with stochastic demand, return, and setup costs PB Macedo, D Alem, M Santos, ML Junior, A Moreno The International Journal of Advanced Manufacturing Technology 82, 1241-1257, 2016 | 61 | 2016 |
A hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry G Figueira, MO Santos, B Almada-Lobo Computers & Operations Research 40 (7), 1804-1818, 2013 | 57 | 2013 |
An integrated approach for production lot sizing and raw material purchasing AL Cunha, MO Santos, R Morabito, A Barbosa-Póvoa European Journal of Operational Research 269 (3), 923-938, 2018 | 45 | 2018 |
Parallel local search algorithms for high school timetabling problems L Saviniec, MO Santos, AM Costa European Journal of Operational Research 265 (1), 81-98, 2018 | 44 | 2018 |
Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines M Furlan, B Almada-Lobo, M Santos, R Morabito Computers & Operations Research 59, 33-50, 2015 | 31 | 2015 |
BFO: a hybrid bees algorithm for the multi-level capacitated lot-sizing problem MM Furlan, MO Santos Journal of Intelligent Manufacturing 28, 929-944, 2017 | 28 | 2017 |
Models for the two-dimensional level strip packing problem–a review and a computational evaluation VMR Bezerra, AAS Leao, JF Oliveira, MO Santos Journal of the Operational Research Society 71 (4), 606-627, 2020 | 26 | 2020 |
Pattern-based models and a cooperative parallel metaheuristic for high school timetabling problems L Saviniec, MO Santos, AM Costa, LMR dos Santos European Journal of Operational Research 280 (3), 1064-1081, 2020 | 23 | 2020 |
Logística de distribuição de água em redes urbanas: racionalização energética F Toledo, MO Santos, MN Arenales, P Seleghim Júnior Pesquisa Operacional 28, 75-91, 2008 | 22 | 2008 |
MIP approaches for a lot sizing and scheduling problem on multiple production lines with scarce resources, temporary workstations, and perishable products WAO Soler, MO Santos, K Akartunalı Journal of the Operational Research Society 72 (8), 1691-1706, 2021 | 21 | 2021 |
The constrained compartmentalized knapsack problem: mathematical models and solution methods AAS Leão, MO Santos, R Hoto, MN Arenales European journal of operational research 212 (3), 455-463, 2011 | 21 | 2011 |
An adaptive hybrid metaheuristic for permutation flowshop scheduling J Moccellin, M Santos Control and Cybernetics 29 (3), 761-771, 2000 | 19 | 2000 |
Meta-heuristics for the one-dimensional cutting stock problem with usable leftover SV Ravelo, CN Meneses, MO Santos Journal of Heuristics 26, 585-618, 2020 | 17 | 2020 |
Infeasibility handling in genetic algorithm using nested domains for production planning MO Santos, S Massago, B Almada-Lobo Computers & operations research 37 (6), 1113-1122, 2010 | 17 | 2010 |
Otimização dos custos de energia elétrica na programação da captação, armazenamento e distribuição de água EM Soler, FMB Toledo, MO Santos, MN Arenales Production 26, 385-401, 2015 | 13 | 2015 |
Safety-Stock: Predicting the demand for supplies in Brazilian hospitals during the COVID-19 pandemic OAG Junior, DC Nascimento, CM Russo, MJ Henriques, CP Tomazella, ... Knowledge-Based Systems 247, 108753, 2022 | 11 | 2022 |
Asynchronous teams for joint lot-sizing and scheduling problem in flow shops MAFB Filho, MO Santos, CN Meneses International journal of production research 50 (20), 5809-5822, 2012 | 10 | 2012 |
An approach using Lagrangian/surrogate relaxation for lot-sizing with transportation costs F Molina, MO Santos, F Toledo, SA Araujo Pesquisa Operacional 29, 269-288, 2009 | 10 | 2009 |