关注
Omar Amoudi
标题
引用次数
引用次数
年份
Understanding the key factors of construction waste in Jordan
O Amoudi, J Al-rifai
60*2015
Analysis of construction delay causes in dams projects in Oman
N Alamri, O Amoudi, G Njie
European Journal of Business and Social Sciences 6 (2), 19-42, 2017
432017
Identification of Critical Success Factors (CSFs) for Public Private Partnership (PPP) Construction Projects in Syria
A Kahwahjian, S Baba, O Amoudi, M Wanos
Jordan Journal of Civil Engineering 8 (4), 393-405, 2014
322014
Critical indices and model of uncertainty perception for regional supply chains: insights from a Delphi-based study
CM Durugbo, Z Al-Balushi, A Anouze, O Amoudi
Supply Chain Management: An International Journal 25 (5), 549-564, 2020
252020
Analysis of accident causes at construction sites in Oman
S Al-Khaburi, O Amoudi
Jordan Journal of Civil Engineering 12 (2), 2018
242018
An exploratory study on challenges of circular economy in the built environment in Oman
IS Al Hosni, O Amoudi, N Callaghan
Proceedings of the Institution of Civil Engineers-Management, Procurement …, 2020
222020
Wisdom from Arabian networks: a review and theory of regional supply chain management
CM Durugbo, O Amoudi, Z Al-Balushi, AL Anouze
Production Planning & Control 32 (15), 1265-1281, 2021
192021
An exploratory study on the impact of the construction industry on climate change
H Elhegazy, J Zhang, O Amoudi, JN Zaki, M Yahia, M Eid, I Mahdi
Journal of Industrial Integration and Management, 1-23, 2023
162023
Competitive priorities for regional operations: a Delphi study
CM Durugbo, AL Anouze, O Amoudi, Z Al-Balushi
Production Planning & Control 32 (15), 1295-1312, 2021
142021
A Suggested Solution to Improve the Traditional Construction Planning Approach
M Saad, S Baba, O Amoudi
Jordan Journal of Civil Engineering 9 (2), 185-196, 2015
102015
A review of the challenges to integrating BIM and building sustainability assessment
A Al Sehrawy, O Amoudi, M Tong, N Callaghan
AIP Conference Proceedings 2428 (1), 2021
82021
Exploitation of BIM in planning and controlling the construction phase on-site carbon emissions: a 6D BIM case study
RA Sehrawy, B Kumar, O Amoudi
INNOVATIVE PRODUCTION AND CONSTRUCTION: Transforming Construction Through …, 2019
42019
A BIM-based conceptual model to manage knowledge in construction design
A Al Sehrawy, O Amoudi
Proceedings of the Creative Construction Conference, 000-000, 2018
42018
An Exploratory Study on Key Risk Factors Affecting Reconstruction Projects in Syria
O Amoudi
Damascus University Journal for Engineering, 2015
42015
Risk Management during construction stage for construction projects in Syria
M Hamade, M Nayfeh, O Amoudi
Damascus University Journal for Engineering Science 28 (1), 129-150, 2012
4*2012
A Critical Review of the Challenges and Barriers to an Effective Use of BIM in Green Building Assessment
A Alsehrawy, M Tong, N Callaghan, O Amoudi
Proceedings of the Construction Digitalisation for Sustainable Development …, 2020
32020
Drivers of adopting Circular Economy in Oman built environment
IS Alhosni, O Amoudi
Journal of Student Research, 2019
32019
Effectiveness of adopting BIM on quantity surveying profession during the project life cycle
S Alhasan, O Amoudi, M Tong, B Kumar
Thirty-Fifth Annual Conference, 273, 2019
32019
Circular economy during project life cycle
IS Alhosni, O Amoudi, N Callaghan
Circular Economy and Sustainability, 177-188, 2022
22022
A system view of factors affecting the performance of construction firms
O Amoudi, M Mawdesley
12007
系统目前无法执行此操作,请稍后再试。
文章 1–20