The benefits, obstacles and problems of practical BIM implementation D Migilinskas, V Popov, V Juocevicius, L Ustinovichius Procedia engineering 57, 767-774, 2013 | 529 | 2013 |
The use of a virtual building design and construction model for developing an effective project concept in 5D environment V Popov, V Juocevicius, D Migilinskas, L Ustinovichius, S Mikalauskas Automation in construction 19 (3), 357-367, 2010 | 227 | 2010 |
Complex usage of 4D information modelling concept for building design, estimation, sheduling and determination of effective variant V Popov, S Mikalauskas, D Migilinskas, P Vainiūnas Technological and economic development of economy 12 (2), 91-98, 2006 | 78 | 2006 |
Computer-aided modelling, evaluation and management of construction projects according to PLM concept D Migilinskas, L Ustinovichius Cooperative Design, Visualization, and Engineering: Third International …, 2006 | 54 | 2006 |
Ranking of heritage building conversion alternatives by applying BIM and MCDM: A case of Sapieha Palace in Vilnius M Pavlovskis, D Migilinskas, J Antucheviciene, V Kutut Symmetry 11 (8), 973, 2019 | 49 | 2019 |
Application of MCDM and BIM for Evaluation of Asset Redevelopment Solutions M Pavlovskis, J Antucheviciene, D Migilinskas Studies in Informatics and Control 25 (3), 293-302, 2016 | 49 | 2016 |
Assessment of buildings redevelopment possibilities using MCDM and BIM techniques M Pavlovskis, J Antucheviciene, D Migilinskas Procedia Engineering 172, 846-850, 2017 | 44 | 2017 |
Training needs in construction project management: a survey of 4 countries of the EU JMC Teixeira, A Minasowicz, EK Zavadskas, L Ustinovichius, ... Journal of Civil Engineering and Management 12 (3), 237-245, 2006 | 40 | 2006 |
Application of hybrid SWARA–BIM in reducing reworks of building construction projects from the perspective of time H Khalesi, A Balali, A Valipour, J Antucheviciene, D Migilinskas, ... Sustainability 12 (21), 8927, 2020 | 36 | 2020 |
Verbal analysis of risk elements in construction contracts L Ustinovichius, E Zavadskas, D Migilinskas, A Malewska, P Nowak, ... Cooperative Design, Visualization, and Engineering: Third International …, 2006 | 36 | 2006 |
Methodology of risk and uncertainty management in construction’s technological and economical problems D Migilinskas, L Ustinovičius The 25th International Symposium on Automation and Robotics in Construction …, 2008 | 34 | 2008 |
Normalisation in the selection of construction alternatives D Migilinskas, L Ustinovichius International Journal of Management and Decision Making 8 (5-6), 623-639, 2007 | 31 | 2007 |
An advanced multi-criteria evaluation model of the rational building energy performance D Migilinskas, E Balionis, R Dziugaite-Tumeniene, G Siupsinskas Journal of Civil Engineering and Management 22 (6), 844-851, 2016 | 30 | 2016 |
Analysis of problems, consequences and solutions for BIM application in reconstruction projects D Migilinskas, M Pavlovskis, I Urba, V Zigmund Journal of Civil Engineering and Management 23 (8), 1082-1090, 2017 | 29 | 2017 |
Problems in reconstruction projects, BIM uses and decision-making: Lithuanian case studies M Pavlovskis, D Migilinskas, J Antuchevičienė, I Urba, V Zigmund Procedia Engineering 208, 125–128, 2017 | 23 | 2017 |
Application of Building Information Modelling (BIM) and construction process simulation ensuring Virtual Project Development (VPD) concept in 5D environment V Popov, D Migilinskas, V Juocevičius, S Mikalauskas The 25th International Symposium on Automation and Robotics in Construction …, 2008 | 21* | 2008 |
Automated management, modelling and choosing of economically effective variant in construction L Ustinovičius, V Popov, D Migilinskas Transport and Telecommunication Institute, 2005 | 21 | 2005 |
Uncertainty analysis in construction project’s appraisal phase L Ustinovičius, D Migilinskas, J Tamošaitienė, EK Zavadskas Modern Building Materials, Structures and Techniques 1, 3-10, 2007 | 17 | 2007 |
Holistic approach to assess the sustainability and utility of refurbishment measures T Vilutienė, D Migilinskas, A Bružas Procedia Engineering. Innovative solutions in construction engineering and …, 2015 | 12 | 2015 |
Performance prediction of construction projects based on the causes of claims: A system dynamics approach R Ansari, M Khalilzadeh, R Taherkhani, J Antucheviciene, D Migilinskas, ... Sustainability 14 (7), 4138, 2022 | 10 | 2022 |