关注
Darius Migilinskas, Dr.
Darius Migilinskas, Dr.
Associated Professor of Civil engineering and Management, Vilnius Gediminas technical university
没有经过验证的电子邮件地址
标题
引用次数
引用次数
年份
The benefits, obstacles and problems of practical BIM implementation
D Migilinskas, V Popov, V Juocevicius, L Ustinovichius
Procedia engineering 57, 767-774, 2013
5292013
The use of a virtual building design and construction model for developing an effective project concept in 5D environment
V Popov, V Juocevicius, D Migilinskas, L Ustinovichius, S Mikalauskas
Automation in construction 19 (3), 357-367, 2010
2272010
Complex usage of 4D information modelling concept for building design, estimation, sheduling and determination of effective variant
V Popov, S Mikalauskas, D Migilinskas, P Vainiūnas
Technological and economic development of economy 12 (2), 91-98, 2006
782006
Computer-aided modelling, evaluation and management of construction projects according to PLM concept
D Migilinskas, L Ustinovichius
Cooperative Design, Visualization, and Engineering: Third International …, 2006
542006
Ranking of heritage building conversion alternatives by applying BIM and MCDM: A case of Sapieha Palace in Vilnius
M Pavlovskis, D Migilinskas, J Antucheviciene, V Kutut
Symmetry 11 (8), 973, 2019
492019
Application of MCDM and BIM for Evaluation of Asset Redevelopment Solutions
M Pavlovskis, J Antucheviciene, D Migilinskas
Studies in Informatics and Control 25 (3), 293-302, 2016
492016
Assessment of buildings redevelopment possibilities using MCDM and BIM techniques
M Pavlovskis, J Antucheviciene, D Migilinskas
Procedia Engineering 172, 846-850, 2017
442017
Training needs in construction project management: a survey of 4 countries of the EU
JMC Teixeira, A Minasowicz, EK Zavadskas, L Ustinovichius, ...
Journal of Civil Engineering and Management 12 (3), 237-245, 2006
402006
Application of hybrid SWARA–BIM in reducing reworks of building construction projects from the perspective of time
H Khalesi, A Balali, A Valipour, J Antucheviciene, D Migilinskas, ...
Sustainability 12 (21), 8927, 2020
362020
Verbal analysis of risk elements in construction contracts
L Ustinovichius, E Zavadskas, D Migilinskas, A Malewska, P Nowak, ...
Cooperative Design, Visualization, and Engineering: Third International …, 2006
362006
Methodology of risk and uncertainty management in construction’s technological and economical problems
D Migilinskas, L Ustinovičius
The 25th International Symposium on Automation and Robotics in Construction …, 2008
342008
Normalisation in the selection of construction alternatives
D Migilinskas, L Ustinovichius
International Journal of Management and Decision Making 8 (5-6), 623-639, 2007
312007
An advanced multi-criteria evaluation model of the rational building energy performance
D Migilinskas, E Balionis, R Dziugaite-Tumeniene, G Siupsinskas
Journal of Civil Engineering and Management 22 (6), 844-851, 2016
302016
Analysis of problems, consequences and solutions for BIM application in reconstruction projects
D Migilinskas, M Pavlovskis, I Urba, V Zigmund
Journal of Civil Engineering and Management 23 (8), 1082-1090, 2017
292017
Problems in reconstruction projects, BIM uses and decision-making: Lithuanian case studies
M Pavlovskis, D Migilinskas, J Antuchevičienė, I Urba, V Zigmund
Procedia Engineering 208, 125–128, 2017
232017
Application of Building Information Modelling (BIM) and construction process simulation ensuring Virtual Project Development (VPD) concept in 5D environment
V Popov, D Migilinskas, V Juocevičius, S Mikalauskas
The 25th International Symposium on Automation and Robotics in Construction …, 2008
21*2008
Automated management, modelling and choosing of economically effective variant in construction
L Ustinovičius, V Popov, D Migilinskas
Transport and Telecommunication Institute, 2005
212005
Uncertainty analysis in construction project’s appraisal phase
L Ustinovičius, D Migilinskas, J Tamošaitienė, EK Zavadskas
Modern Building Materials, Structures and Techniques 1, 3-10, 2007
172007
Holistic approach to assess the sustainability and utility of refurbishment measures
T Vilutienė, D Migilinskas, A Bružas
Procedia Engineering. Innovative solutions in construction engineering and …, 2015
122015
Performance prediction of construction projects based on the causes of claims: A system dynamics approach
R Ansari, M Khalilzadeh, R Taherkhani, J Antucheviciene, D Migilinskas, ...
Sustainability 14 (7), 4138, 2022
102022
系统目前无法执行此操作,请稍后再试。
文章 1–20