关注
Mustafa Kumral
Mustafa Kumral
在 mcgill.ca 的电子邮件经过验证
标题
引用次数
引用次数
年份
Predicting elastic properties of intact rocks from index tests using multiple regression modelling
M Karakus, M Kumral, O Kilic
International Journal of Rock Mechanics and Mining Sciences 42 (2), 323-330, 2005
1332005
A simulated annealing approach to mine production scheduling
M Kumral, PA Dowd
Journal of the Operational Research Society 56 (8), 922-930, 2005
1112005
Organization: A new focus on mine safety improvement in a complex operational and business environment
D Komljenovic, G Loiselle, M Kumral
International Journal of Mining Science and Technology 27 (4), 617-625, 2017
1092017
Simulation-based optimization of truck-shovel material handling systems in multi-pit surface mines
B Ozdemir, M Kumral
Simulation Modelling Practice and Theory 95, 36-48, 2019
762019
Reliability effect on energy consumption and greenhouse gas emissions of mining hauling fleet towards sustainable mining
S Peralta, AP Sasmito, M Kumral
Journal of Sustainable Mining 15 (3), 85-94, 2016
652016
Application of chance-constrained programming based on multi-objective simulated annealing to solve a mineral blending problem
M Kumral
Engineering Optimization 35 (6), 661-673, 2003
602003
Optimizing ore–waste discrimination and block sequencing through simulated annealing
M Kumral
Applied Soft Computing 13 (8), 3737-3744, 2013
582013
Mine design selection under uncertainty
SA Abdel Sabour, RG Dimitrakopoulos, M Kumral
Mining Technology 117 (2), 53-64, 2008
472008
Robust stochastic mine production scheduling
M Kumral
Engineering Optimization 42 (6), 567-579, 2010
462010
A system-wide approach to minimize the operational cost of bench production in open-cast mining operations
B Ozdemir, M Kumral
International Journal of Coal Science & Technology 6 (1), 84-94, 2019
432019
Optimizing ore–waste dig-limits as part of operational mine planning through genetic algorithms
JR Ruiseco, J Williams, M Kumral
Natural Resources Research 25, 473-485, 2016
422016
Production planning of mines: Optimisation of block sequencing and destination
M Kumral
International Journal of Mining, Reclamation and Environment 26 (2), 93-103, 2012
422012
Underground mine planning: stope layout optimisation under grade uncertainty using genetic algorithms
ME Villalba Matamoros, M Kumral
International Journal of Mining, Reclamation and Environment 33 (5), 353-370, 2019
412019
Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing
P Dowd
Society for Mining, Metallurgy, and Exploration, 2002
412002
Optimal inspection and preventive maintenance scheduling of mining equipment
E Angeles, M Kumral
Journal of Failure Analysis and Prevention 20 (4), 1408-1416, 2020
402020
Cost analysis of material handling systems in open pit mining: Case study on an iron ore prefeasibility study
M de Werk, B Ozdemir, B Ragoub, T Dunbrack, M Kumral
The Engineering Economist 62 (4), 369-386, 2017
402017
Incorporating geo-metallurgical information into mine production scheduling
M Kumral
Journal of the Operational Research Society 62 (1), 60-68, 2011
382011
Game theory for analyzing and improving environmental management in the mining industry
BC Collins, M Kumral
Resources Policy 69, 101860, 2020
372020
Geostatistical modeling of spatial variability of SPT data for a borax stockpile site
H Basarir, M Kumral, C Karpuz, L Tutluoglu
Engineering Geology 114 (3-4), 154-163, 2010
372010
Reliability-based optimisation of a mine production system using genetic algorithms
M Kumral
Journal of Loss Prevention in the Process Industries 18 (3), 186-189, 2005
362005
系统目前无法执行此操作,请稍后再试。
文章 1–20