Synchronization of bus timetabling OJ Ibarra-Rojas, YA Rios-Solis Transportation Research Part B: Methodological 46 (5), 599-614, 2012 | 301 | 2012 |
An integrated approach for timetabling and vehicle scheduling problems to analyze the trade-off between level of service and operating costs of transit networks OJ Ibarra-Rojas, R Giesen, YA Rios-Solis Transportation Research Part B: Methodological 70, 35-46, 2014 | 165 | 2014 |
Lower bounds for the earliness–tardiness scheduling problem on parallel machines with distinct due dates S Kedad-Sidhoum, YR Solis, F Sourd European Journal of Operational Research 189 (3), 1305-1316, 2008 | 99 | 2008 |
Multiperiod bus timetabling OJ Ibarra-Rojas, F López-Irarragorri, YA Rios-Solis Transportation Science 50 (3), 805 - 822, 2016 | 97 | 2016 |
Vehicle and crew scheduling for flexible bus transportation systems V Boyer, OJ Ibarra-Rojas, YÁ Ríos-Solís Transportation Research Part B: Methodological 112, 216-229, 2018 | 66 | 2018 |
Valid inequalities for the synchronization bus timetabling problem P Fouilhoux, OJ Ibarra-Rojas, S Kedad-Sidhoum, YA Rios-Solis European Journal of Operational Research 251 (2), 442-450, 2016 | 65 | 2016 |
A crop planning and real-time irrigation method based on site-specific management zones and linear programming NM Cid-Garcia, AG Bravo-Lozano, YA Rios-Solis Computers and electronics in agriculture 107, 20-28, 2014 | 60 | 2014 |
Rectangular shape management zone delineation using integer linear programming NM Cid-Garcia, V Albornoz, YA Rios-Solis, R Ortega Computers and electronics in agriculture 93, 1-9, 2013 | 60 | 2013 |
A heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection production YÁ Ríos-Solís, OJ Ibarra-Rojas, M Cabo, E Possani European Journal of Operational Research 284 (3), 861-873, 2020 | 41 | 2020 |
Just-in-time Systems RZ Ríos-Mercado, YA Ríos-Solís Springer 60, 314, 2012 | 38* | 2012 |
Exponential neighborhood search for a parallel machine scheduling problem YA Rios-Solis, F Sourd Computers & Operations Research 35 (5), 1697-1712, 2008 | 34 | 2008 |
Optimal solutions for unrelated parallel machines scheduling problems using convex quadratic reformulations MC Plateau, YA Rios-Solis European Journal of Operational Research 201 (3), 729-736, 2010 | 29 | 2010 |
Multiperiod and stochastic formulations for a closed loop supply chain with incentives I Litvinchev, YA Rios, D Özdemir, LG Hernández-Landa Journal of Computer and Systems Sciences International 53, 201-211, 2014 | 25 | 2014 |
Positions and covering: A two-stage methodology to obtain optimal solutions for the 2d-bin packing problem NM Cid-Garcia, YA Rios-Solis Plos one 15 (4), e0229358, 2020 | 24 | 2020 |
A hierarchical planning scheme based on precision agriculture VM Albornoz, NM Cid-García, R Ortega, YA Ríos-Solís Handbook of operations research in agriculture and the agri-food industry …, 2015 | 22 | 2015 |
Vehicle and reliable driver scheduling for public bus transportation systems A Andrade-Michel, YA Ríos-Solís, V Boyer Transportation Research Part B: Methodological 145, 290-301, 2021 | 21 | 2021 |
A decomposition approach for the piece–mold–machine manufacturing problem OJ Ibarra-Rojas, RZ Ríos-Mercado, YA Rios-Solis, MA Saucedo-Espinosa International Journal of Production Economics 134 (1), 255-261, 2011 | 20 | 2011 |
Bi-objective scheduling on a restricted batching machine M Cabo, JL González-Velarde, E Possani, YÁR Solís Computers & Operations Research 100, 201-210, 2018 | 12 | 2018 |
The multimodal and multiperiod urban transportation integrated timetable construction problem with demand uncertainty P Ávila-Torres, F López-Irarragorri, R Caballero, Y Ríos-Solís J. Ind. Manag. Optim 14 (2), 447, 2018 | 12 | 2018 |
Integrating synchronization bus timetabling and single-depot single-type vehicle scheduling OJ Ibarra-Rojas, YA Rios-Solis ORP3 meeting, Cádiz España, 1-4, 2011 | 11 | 2011 |