Implementasi Kaizen Dan 5S Pada Pengeringan Produk Di Proses Plating R Soesilo Jurnal Teknik Industri 18 (2), 121-126, 2017 | 26 | 2017 |
PENENTUAN LOKASI EXTERNAL WAREHOUSE DENGAN MENGGUNAKAN METODE CENTER OF GRAVITY (STUDI KASUS DI PT. RPZ SURABAYA) R soesilo Jurnal Manajemen Industri dan Logistik, 2020 | 12 | 2020 |
Analysis Transformation and Digitalization of MSMes (Literature Review) R Soesilo, LRRU Tampubolon Formosa Journal of Multidisciplinary Research 2 (3), 649-658, 2023 | 6 | 2023 |
Minimasi waktu penggantian cetakan dengan pendekatan lean manufacture & single minute exchange of dies (SMED) R Soesilo, M Basuki, MJ Hidayat Simp. Nas. RAPI XVII 1, 89-96, 2018 | 6 | 2018 |
Meningkatkan Output Dengan Melakukan Perubahan Tata Letak di Area Produksi R Soesilo Journal of Industrial Engineering Management 2 (2), 23-31, 2017 | 6 | 2017 |
JSA and HIRADC Analysis of Mold Replacement Process on Inject Stretch Blow Machine R Soesilo IJESTY 3 (1), 9, 2023 | 5 | 2023 |
Transformation and Digitalization of MSMEs to Increase Productivity, Added Value and Downstreaming of Strategic Food and Industry R Soesilo, LRRU Tampubolon Formosa Journal of Multidisciplinary Research 2 (4), 757-766, 2023 | 4 | 2023 |
Analisis Cacat pada Pemasangan Gasket di Lini Assembly dengan Pendekatan DMAIC Six Sigma N Nirfison, R Soesilo Jurnal Taguchi: Jurnal Ilmiah Teknik dan Manajemen Industri 2 (1), 14-25, 2022 | 3 | 2022 |
Pengaruh Tingkat Ergonomi Stasiun Kerja Operator Untuk Meningkatkan Produktifitas S Sartono Jurnal Penelitian Teknik Industri 1 (1), 42-52, 2020 | 3 | 2020 |
Implementasi Konsep A3 Untuk Mengurangi Reject Proses Assembly R Soesilo Jurnal Teknik Industri 18 (1), 68-73, 2017 | 3 | 2017 |
Supply Chain Performance Improvement Strategy in the Packaging Industry R Soesilo International Journal of Business and Applied Economics 2 (2), 245-256, 2023 | 2 | 2023 |
Minimasi Waktu Penggantian Cetakan Dengan Pendekatan Lean Manufacture & Single Minute Exchange Of Dies (Smed) L Lukmandono, R Soesilo, M Basuki, MJ Hidayat RAPI 2018, 2018 | 2 | 2018 |
Implementasi Kaizen Dan 5S Pada Pengeringan Produk Di Proses Plating S Rahman J. Tek. Ind, 1978-1431, 0 | 2 | |
Pelatihan Screen Printing Berbasis Produksi Sebagai Peningkatan Kompetensi Siswa SMK di Dunia Industri R Soesilo, S Sulistyo, A Rasyid, E Larosa Jurnal Pengabdian Teknik Industri 2 (1), 31-39, 2023 | 1 | 2023 |
Employee Performance Improvement Strategy in the Manufacturing Industry R Soesilo, LL Santioso, K Kamsariaty, DN Mastuti, R Sitanggang International Journal of Psychology and Health Science 2 (2), 67-84, 2024 | | 2024 |
ANALISA SWOT DALAM IMPLEMENTASI PRAKTIK GREEN MANUFACTURE: MENUJU KINERJA LINGKUNGAN UNGGUL DI INDUSTRI MANUFAKTUR R Soesilo, AD Valentin, P Husodo, YP Istiyono Jurnal Sistem Informasi dan Teknologi 6 (2), 2024 | | 2024 |
ANALISIS MENURUNKAN DOWNTIME MESIN ENDROBER DENGAN MENGGUNAKAN METODE QUALITY CONTROL CIRCLE (QCC) DI PT. XYZ YP Istiyono, R Soesilo Jurnal Sistem Informasi dan Teknologi 6 (2), 2024 | | 2024 |
Enhancing Operational Performance through Green Manufacturing Practices: Case Studies from TQM Implementation in the Indonesian Industrial Sector R Soesilo Siber Journal of Advanced Multidisciplinary 2 (1), 1-7, 2024 | | 2024 |
Reducing Cycle Time By Eliminating Waste In Refrigerator Factory Unloading Process D Khaerudin, N Nirfison, R Soesilo Bridge: Jurnal publikasi Sistem Informasi dan Telekomunikasi 2 (2), 01-13, 2024 | | 2024 |
Exploring the Effects of Implementing TQM Strategy, With Organizational Learning Capability and Innovation Capability as Mediators, On Operational Performance at Indonesian … R Soesilo, E Yunus, SU Ady Kilisuci International Conference on Economic & Business 2, 358-368, 2024 | | 2024 |