受强制性开放获取政策约束的文章 - SangHyeok Han了解详情
无法在其他位置公开访问的文章:13 篇
An automated biomechanical simulation approach to ergonomic job analysis for workplace design
A Golabchi, SH Han, JO Seo, SU Han, SH Lee, M Al-Hussein
Journal of Construction Engineering and Management 141 (8), 04015020, 2015
强制性开放获取政策: US National Institutes of Health, Natural Sciences and Engineering Research …
Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly
SH Han, S Hasan, A Bouferguène, M Al-Hussein, J Kosa
Journal of Management in Engineering 31 (5), 04014080, 2015
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Process-oriented framework to improve modular and offsite construction manufacturing performance
Y Zhang, Z Lei, SH Han, A Bouferguene, M Al-Hussein
Journal of Construction Engineering and Management 146 (9), 04020116, 2020
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Automated post-3D visualization ergonomic analysis system for rapid workplace design in modular construction
X Li, SH Han, M Gül, M Al-Hussein
Automation in Construction 98, 160-174, 2019
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites
SH Han, A Bouferguene, M Al-Hussein, U Hermann
Journal of Construction Engineering and Management 143 (9), 04017060, 2017
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Monocular vision–based framework for biomechanical analysis or ergonomic posture assessment in modular construction
W Chu, S Han, X Luo, Z Zhu
Journal of Computing in Civil Engineering 34 (4), 04020018, 2020
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
3D visualization-based motion planning of mobile crane operations in heavy industrial projects
SH Han, Z Lei, A Bouferguene, M Al-Hussein, U Hermann
Journal of Computing in Civil Engineering 30 (1), 04014127, 2016
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
3D fuzzy ergonomic analysis for rapid workplace design and modification in construction
J Wang, SH Han, X Li
Automation in Construction 123, 103521, 2021
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Parametric-based design optimization of air distribution system in panelized construction
P Baradaran-Noveiri, H Liu, SH Han, M Zaheeruddin
Journal of Building Engineering 51, 104254, 2022
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
3D standard motion time-based ergonomic risk analysis for workplace design in modular construction
J Wang, X Li, SH Han, M Al-Hussein
Automation in Construction 147, 104738, 2023
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Automated rigging design for heavy industrial lifts
SMA MinayHashemi, SH Han, J Olearczyk, A Bouferguene, M Al-Hussein, ...
Automation in Construction 112, 103083, 2020
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Automated ergonomics-based productivity analysis for intelligent manufacturing in industrialized construction
J Wang, Y Mohamed, SH Han, X Li, M Al-Hussein
Canadian Society of Civil Engineering Annual Conference, 321-333, 2021
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Automated mathematical-based design framework for the selection of rigging configuration
S Hashemi, S Han, J Olearczyk, A Bouferguene, M Al-Hussein, J Kosa
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
可在其他位置公开访问的文章:18 篇
Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings
H Liu, C Sydora, MS Altaf, SH Han, M Al-Hussein
Journal of Cleaner Production 235, 1189-1201, 2019
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task
X Li, SH Han, M Gül, M Al-Hussein, M El-Rich
Journal of Construction Engineering and Management 144 (1), 04017093, 2018
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
An integrated decision support model for selecting the most feasible crane at heavy construction sites
SH Han, S Hasan, A Bouferguene, M Al-Hussein, J Kosa
Automation in Construction 87, 188-200, 2018
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Building information modelling-(BIM-) based generative design for drywall installation planning in prefabricated construction
JD Cuellar Lobo, Z Lei, H Liu, HX Li, SH Han
Advances in Civil Engineering 2021, 1-16, 2021
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Stochastic-based noise exposure assessment in modular and off-site construction
S Dabirian, SH Han, J Lee
Journal of Cleaner Production 244, 118758, 2020
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
Lean-based diagnosis and improvement for offsite construction factory manufacturing facilities
YY Zhang, G Fan, Z Lei, SH Han, C Raimondi, M Al-Hussein, ...
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2016
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
A simulation-based statistical method for planning modular construction manufacturing.
APS Bhatia, SH Han, O Moselhi
Journal of Information Technology in Construction 27, 2022
强制性开放获取政策: Natural Sciences and Engineering Research Council of Canada
出版信息和资助信息由计算机程序自动确定