An automated biomechanical simulation approach to ergonomic job analysis for workplace design A Golabchi, SH Han, JO Seo, SU Han, SH Lee, M Al-Hussein Journal of Construction Engineering and Management 141 (8), 04015020, 2015 | 128 | 2015 |
Automated post-simulation visualization of modular building production assembly line SH Han, M Al-Hussein, S Al-Jibouri, H Yu Automation in construction 21, 229-236, 2012 | 110 | 2012 |
Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings H Liu, C Sydora, MS Altaf, SH Han, M Al-Hussein Journal of Cleaner Production 235, 1189-1201, 2019 | 97 | 2019 |
Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly SH Han, S Hasan, A Bouferguène, M Al-Hussein, J Kosa Journal of Management in Engineering 31 (5), 04014080, 2015 | 89 | 2015 |
Process-oriented framework to improve modular and offsite construction manufacturing performance Y Zhang, Z Lei, SH Han, A Bouferguene, M Al-Hussein Journal of Construction Engineering and Management 146 (9), 04020116, 2020 | 75 | 2020 |
Automated post-3D visualization ergonomic analysis system for rapid workplace design in modular construction X Li, SH Han, M Gül, M Al-Hussein Automation in Construction 98, 160-174, 2019 | 66 | 2019 |
3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task X Li, SH Han, M Gül, M Al-Hussein, M El-Rich Journal of Construction Engineering and Management 144 (1), 04017093, 2018 | 63 | 2018 |
3D-based crane evaluation system for mobile crane operation selection on modular-based heavy construction sites SH Han, A Bouferguene, M Al-Hussein, U Hermann Journal of Construction Engineering and Management 143 (9), 04017060, 2017 | 60 | 2017 |
Blockchain technology toward smart construction: Review and future directions H Liu, SH Han, Z Zhu Journal of Construction Engineering and Management 149 (3), 03123002, 2023 | 59 | 2023 |
Algorithm for mobile crane walking path planning in congested industrial plants Z Lei, SH Han, A Bouferguène, H Taghaddos, U Hermann, M Al-Hussein Journal of Construction Engineering and Management 141 (2), 05014016, 2015 | 52 | 2015 |
An integrated decision support model for selecting the most feasible crane at heavy construction sites SH Han, S Hasan, A Bouferguene, M Al-Hussein, J Kosa Automation in Construction 87, 188-200, 2018 | 46 | 2018 |
Monocular vision–based framework for biomechanical analysis or ergonomic posture assessment in modular construction W Chu, S Han, X Luo, Z Zhu Journal of Computing in Civil Engineering 34 (4), 04020018, 2020 | 41 | 2020 |
Design for manufacturing and assembly: A BIM-enabled generative framework for building panelization design H Liu, Y Zhang, Z Lei, HX Li, SH Han Advances in Civil Engineering 2021, 1-14, 2021 | 39 | 2021 |
From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies Z Lei, H Taghaddos, SH Han, A Bouferguène, M Al-Hussein, U Hermann Canadian Journal of Civil Engineering 42 (3), 190-198, 2015 | 37 | 2015 |
3D visualization-based motion planning of mobile crane operations in heavy industrial projects SH Han, Z Lei, A Bouferguene, M Al-Hussein, U Hermann Journal of Computing in Civil Engineering 30 (1), 04014127, 2016 | 35 | 2016 |
3D fuzzy ergonomic analysis for rapid workplace design and modification in construction J Wang, SH Han, X Li Automation in Construction 123, 103521, 2021 | 32 | 2021 |
Stochastic-based noise exposure assessment in modular and off-site construction S Dabirian, SH Han, J Lee Journal of Cleaner Production 244, 118758, 2020 | 26 | 2020 |
Integrated building information model to identify possible crane instability caused by strong winds S Hasan, H Zaman, S Han, M Al-Hussein, Y Su Construction Research Congress 2012: Construction Challenges in a Flat World …, 2012 | 24 | 2012 |
Building information modelling-(BIM-) based generative design for drywall installation planning in prefabricated construction JD Cuellar Lobo, Z Lei, H Liu, HX Li, SH Han Advances in Civil Engineering 2021, 1-16, 2021 | 23 | 2021 |
Operations planning and scheduling in off-site construction supply chain management: Scope definition and future directions A Zaalouk, S Moon, SH Han Automation in Construction 153, 104952, 2023 | 22 | 2023 |