标题/作者 | 引用次数 | 年份 |
---|---|---|
S Kumar, M Kumar, A Handa Engineering Failure Analysis 94, 379-395 | 122 | 2018 |
Q Wang, R Pan, B Jiang, SC Li, MC He, HB Sun, L Wang, Q Qin, HC Yu, ... Engineering Failure Analysis 81, 155-177 | 105 | 2017 |
R Bogenfeld, J Kreikemeier, T Wille Engineering Failure Analysis 86, 72-99 | 103 | 2018 |
C Pandey, N Saini, MM Mahapatra, P Kumar Engineering Failure Analysis 71, 131-147 | 102 | 2017 |
M Xie, Z Tian Engineering Failure Analysis 92, 222-239 | 102 | 2018 |
S Nasiri, MR Khosravani, K Weinberg Engineering Failure Analysis 81, 270-293 | 89 | 2017 |
An integrated approach for fuzzy failure modes and effects analysis using fuzzy AHP and fuzzy MAIRCA S Boral, I Howard, SK Chaturvedi, K McKee, VNA Naikan Engineering Failure Analysis 108, 104195 | 87 | 2020 |
M Shariati, MM Tahir, TC Wee, SNR Shah, A Jalali, M Khorami Engineering Failure Analysis 85, 149-166 | 84 | 2018 |
R Amaya-Gómez, M Sánchez-Silva, E Bastidas-Arteaga, F Schoefs, ... Engineering Failure Analysis 98, 190-214 | 84 | 2019 |
S Lu, L Li, Y Cheng, Z Sa, Y Zhang, N Yang Engineering Failure Analysis 80, 241-252 | 82 | 2017 |
P Zampieri, MA Zanini, F Faleschini, L Hofer, C Pellegrino Engineering Failure Analysis 79, 371-384 | 82 | 2017 |
A Siddika, MA Al Mamun, W Ferdous, R Alyousef Engineering Failure Analysis 111, 104480 | 80 | 2020 |
X Li, S Chen, E Wang, Z Li Engineering Failure Analysis 124, 105396 | 76 | 2021 |
G Gholipour, C Zhang, AA Mousavi Engineering Failure Analysis 91, 397-418 | 76 | 2018 |
A Earij, G Alfano, K Cashell, X Zhou Engineering Failure Analysis 82, 92-115 | 74 | 2017 |
ZX Tan, DP Thambiratnam, THT Chan, HA Razak Engineering Failure Analysis 79, 253-262 | 72 | 2017 |
U Zerbst, M Madia, C Klinger, D Bettge, Y Murakami Engineering Failure Analysis 97, 777-792 | 71 | 2019 |
H Mansoori, R Mirzaee, F Esmaeilzadeh, A Vojood, AS Dowrani Engineering Failure Analysis 82, 16-25 | 71 | 2017 |
L Jiang, Q Wu, Q Wu, P Wang, Y Xue, P Kong, B Gong Engineering Failure Analysis 98, 118-130 | 68 | 2019 |
AC Altunışık, FY Okur, V Kahya Engineering Failure Analysis 79, 154-170 | 67 | 2017 |
1 - 20
计算机程序会自动估算并确定日期和引用次数。