Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems

D Giglio, M Paolucci, A Roshani - Journal of cleaner production, 2017 - Elsevier
In this paper, a system designed to produce multi-class single-level products through both
manufacturing of raw materials and remanufacturing of return products is taken into …

Solving a capacitated flow-shop problem with minimizing total energy costs

O Masmoudi, A Yalaoui, Y Ouazene… - The International Journal …, 2017 - Springer
In this paper, a single-item capacitated lot-sizing problem in a flow-shop system with energy
consideration is addressed. The planning horizon is split into T periods where each one is …

Energy implications in a two-stage production system with controllable production rates

S Zanoni, L Bettoni, CH Glock - International Journal of Production …, 2014 - Elsevier
Nowadays, it is an essential commitment for firms to reduce energy consumption and
therewith energy costs, which frequently account for a large part of the manufacturing costs …

Integration of power energy aspects into the Economic Lot Scheduling Problem

I Ferretti, CH Glock, S Zanoni - Computers & Industrial Engineering, 2023 - Elsevier
Abstract Beck et al.[2019. Integration of energy aspects into the economic lot scheduling
problem. International Journal of Production Economics 209, 399–410] extended the …

Energy-aware production lot-sizing and parallel machine scheduling with the product-specific machining tools and power requirements

Ç Sel, ME Gurkan, A Hamzadayı - Computers & Industrial Engineering, 2024 - Elsevier
This study addresses a multi-product lot-sizing and scheduling problem with sequence-
dependent setup times, considering that the machining operations cause energy …

A production planning in highly automated manufacturing system considering multiple process plans with different energy requirements

YC Choi, P Xirouchakis - The International Journal of Advanced …, 2014 - Springer
This paper focuses on a production planning problem in a highly automated manufacturing
system considering multiple process plans with different energy requirements. The system …

Capacity acquisition for the single-item lot sizing problem under energy constraints

C Rapine, B Penz, C Gicquel, A Akbalik - Omega, 2018 - Elsevier
We study a single-item lot sizing problem integrated with some energy constraints, called
energy-LSP in the rest of the paper. We consider a production system composed of identical …

Design of a genetic algorithmic approach for reducing energy consumption in single machine production systems

E Tarakçı, AH Zaim, O Öztaş - Journal of International Trade, Logistics and …, 2018 - jital.org
In traditional production systems, production is generally based on performance criteria such
as total completion time, price and quality. Energy consumption or environmental impacts of …

Integration of energy aspects into the economic lot scheduling problem

FG Beck, K Biel, CH Glock - International Journal of Production Economics, 2019 - Elsevier
Due to the role the manufacturing sector plays in the depletion of resources and the
generation of greenhouse gas emissions, the consumption of energy has more and more …

Energy-aware Economic Production Quantity model with variable energy pricing

FG Nezami, M Heydar - Operational Research, 2019 - Springer
In this paper, an energy-aware Economic Production Quantity (EPQ) model is presented to
determine optimum production run length and batch size with respect to variable energy …