Lot sizing with carbon emission constraints

N Absi, S Dauzère-Pérès, S Kedad-Sidhoum… - European Journal of …, 2013 - Elsevier
This paper introduces new environmental constraints, namely carbon emission constraints,
in multi-sourcing lot-sizing problems. These constraints aim at limiting the carbon emission …

Optimal lot sizing in manufacturing revisited

KV Ramaswamy - Journal of Information and Optimization …, 2006 - Taylor & Francis
The lot sizing problem with non-instantaneous delivery and continuous consumption of
manufactured items has been extensively investigated incorporating various …

Energy costs vs. carbon dioxide emissions in short-term production planning: A business case study

A Dellnitz, D Braschczok, J Ostmeyer, M Hilbert… - Journal of Business …, 2020 - Springer
In energy-oriented lot-sizing and scheduling research, it is often assumed that minimizing
energy costs automatically leads to an improvement of the ecological footprint of a company …

Sustainability in a lot-sizing and scheduling problem with delivery time window and sequence-dependent setup cost consideration

P Vaez, F Sabouhi, MS Jabalameli - Sustainable Cities and Society, 2019 - Elsevier
Sustainability in manufacturing operations scheduling is a necessary requirement for
companies. Although this subject has attracted much attention, joint decisions of lot-sizing …

A dedicated lot sizing problem in tire industry

C Koch, Y Ouazene, T Arbaoui, F Yalaoui, N Jaunet… - IFAC-PapersOnLine, 2020 - Elsevier
In this paper, we consider a dedicated lot sizing and scheduling problem inspired from a real-
world application in tire industry. This problem consists in scheduling several products on …

[PDF][PDF] Three meta-heuristic algorithms for the single-item capacitated lot-sizing problem (research note)

E Mehdizadeh, A Fatehi Kivi - International Journal of Engineering, 2014 - ije.ir
This paper proposes a mixed integer programming model for single-item capacitated lot-
sizing problem with setup times, safety stock, demand shortages, outsourcing and inventory …

Some comments on “Optimization of production scheduling with time-dependent and machine-dependent electricity cost for industrial energy efficiency”

J Koo, BI Kim - The International Journal of Advanced Manufacturing …, 2016 - Springer
Some comments on “Optimization of production scheduling with time-dependent and
machine-dependent electricity cost for industr Page 1 ORIGINAL ARTICLE Some comments on …

A hybrid electromagnetism-like algorithm for integration of process planning and capacitated lot-sizing problem

M Farahnakian, MR Razfar… - Proceedings of the …, 2012 - journals.sagepub.com
The capacitated lot-sizing problem (CLSP) is extensively discussed in the operation
management literature. The CLSP concerns balancing set-up costs against inventory costs …

Single item lot sizing problem under renewable energy uncertainty

M Rodoplu, T Arbaoui, A Yalaoui - IFAC-PapersOnLine, 2019 - Elsevier
Renewable energy sources play an important role to decrease the dependency to the
traditional energy sources which are responsible for the high carbon emission levels in the …

[HTML][HTML] Effective matheuristics for the multi-item capacitated lot-sizing problem with remanufacturing

JO Cunha, HH Kramer, RA Melo - Computers & Operations Research, 2019 - Elsevier
Abstract Effective Mixed Integer Programming (MIP) based matheuristics for the multi-item
capacitated lot-sizing problem with remanufacturing (CLSP-RM) are proposed in this paper …